[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857739":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},857739,535,1,"单选题","下列关于深化设计说法不正确的是？()",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","是为了将设计师的设计理念、设计意图在施工过程中得道充分体现",false,{"key":16,"text":17,"correct":18},"B","是为了增强管理者对施工过程的控制能力",true,{"key":20,"text":21,"correct":14},"C","是为了在满足甲方需求的前提下，使施工图更加符合现场实际情况，是施工单位的施工理念在设计阶段的延伸",{"key":23,"text":24,"correct":14},"D","是为了更好地为甲方服务，满足现场不断变化的需求，优化设计方案在现场实施的过程，是为了达到满足功能的前提下降低成本，为企业创造更多利润","BIM技术在深化设计阶段的应用。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]