[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857539":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857539,535,1,"单选题","下列选项关于管线综合一般步骤的说法不正确的是？()",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","确定各类管线的大概标高和位置",false,{"key":16,"text":17,"correct":14},"B","调整电桥架，水管主管和风管的平面图位置以便综合考虑",{"key":19,"text":20,"correct":14},"C","根据局部管线冲突的情况对管线进行调整",{"key":22,"text":23,"correct":24},"D","对各类型管线进行建模",true,"管线建模发生在管线综合之前。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]