[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857417":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857417,535,1,"单选题","基于BIM技术实现对人员疏散时间、疏散距离、有毒气体扩散时间、建筑材料耐燃烧极限、消防作业面等相关内容的仿真模拟。以上描述体现的是BIM技术在()中的应用。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","灾害应急管理",true,{"key":16,"text":17,"correct":18},"B","塔吊安全管理",false,{"key":20,"text":21,"correct":18},"C","防坠落管理",{"key":23,"text":24,"correct":18},"D","施工动态监测","防坠落管理指的是通过在BIM模型中的危险源存在部位建立坠落防护栏杆构件模型，并帮助施工人员能够清楚地识别多个坠落风险。施工动态监测是指对施工过程进行实时施工监测，特别是重要部位和关键工序，可以及时了解施工过程中结构的受力和运行状态。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]