[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857410":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857410,535,1,"单选题","()指的是建筑物从计划建设到使用过程终止所经历的所有阶段的总称，包括但不限于策划、立项、设计、招投标、施工、审批、验收、运营、维护、拆除等环节。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设周期",false,{"key":16,"text":17,"correct":14},"B","建设过程",{"key":19,"text":20,"correct":14},"C","使用寿命",{"key":22,"text":23,"correct":24},"D","全生命周期",true,"建设周期及建设过程都只是指项目建设阶段，使用寿命只是指项目运维阶段。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]