[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857381":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857381,535,1,"单选题","优化总体规划是属于BIM技术在()阶段的应用内容。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","方案策划阶段",true,{"key":16,"text":17,"correct":18},"B","招投标阶段",false,{"key":20,"text":21,"correct":18},"C","设计阶段",{"key":23,"text":24,"correct":18},"D","施工阶段","BIM技术在方案策划阶段的应用内容主要包括：现状建模、成本核算、场地分析和总体规划。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]