[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857356":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857356,535,1,"单选题","在BIM辅助招投标中，投标方根据BIM模型快速获取正确的()，与招标文件的工程量清单比较，可以制定更好的投标策略。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程量信息",true,{"key":16,"text":17,"correct":18},"B","材料单价信息",false,{"key":20,"text":21,"correct":18},"C","构件材料信息",{"key":23,"text":24,"correct":18},"D","施工工艺信息","主要是将工程量与工程清单进行对比。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]