[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857351":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},857351,535,1,"单选题","按照《建筑工程设计信息模型分类和编码标准》中的规定，下列四个编码中，应最先归档的为()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","11－13.25.03＜10－27.05.00",false,{"key":16,"text":17,"correct":18},"B","11－13.25.03＋10－27.05.00",true,{"key":20,"text":21,"correct":14},"C","12－33.13.00＋10－39.01.00",{"key":23,"text":24,"correct":14},"D","12－33.13.00＜10－39.01.00","由同一类运算符号联合的组合编码集合，应按从左到右、从小到大的顺序逐级进行归档。由单个编码和组合编码构成的编码集合，应先对由“\u002F”联合的组合编码进行归档，再对单个编码进行归档，之后对由“+”联合的组合编码进行归档，最后对由“＜”、“＞”联合的组合编码进行归档。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]