[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857349":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},857349,535,1,"单选题","下列选项不属于项目BIM实施保障措施中系统运行保障体系的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","系统人员配置保障体系",false,{"key":16,"text":17,"correct":14},"B","系统运行工作计划",{"key":19,"text":20,"correct":21},"C","系统展示途径",true,{"key":23,"text":24,"correct":14},"D","系统运行检查机制","建立系统运行保障体系主要包括组建系统人员配置保障体系、编制BIM系统运行工作计划、建立系统运行例会制度和建立系统运行检查机制等方面。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]