[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857344":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857344,535,1,"单选题","",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","设计主导管理模式",false,{"key":16,"text":17,"correct":14},"B","施工主导管理模式",{"key":19,"text":20,"correct":14},"C","业主自主管理模式",{"key":22,"text":23,"correct":24},"D","咨询辅助管理模式",true,"咨询辅助管理模式下业主分别同设计单位签订设计合同、同BIM咨询公司签订BIM咨询服务合同，先由设计单位进行设计，BIM咨询公司根据设计资料进行三维建模，并进行设计、碰撞检查，随后将检查结果及时反馈以减少工程变更。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]