[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857307":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857307,535,1,"单选题","下列选项关于项目策划阶段BIM应用说法不正确的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","BIM在方案策划阶段的应用内容主要包括现状建模、成本核算、场地分析和碰撞检查",true,{"key":16,"text":17,"correct":18},"B","场地分析是对建筑物的定位、建筑物的空间方位及外观、建筑物和周边环境的关系、建筑物将来的车流、物流、人流等各方面的因素进行集成数据分析的综合",false,{"key":20,"text":21,"correct":18},"C","利用BIM技术可为管理者提供概要的现状模型，以方便建设项目方案的分析、模拟，从而为整个项目的建设降低成本、缩短工期并提高质量",{"key":23,"text":24,"correct":18},"D","项目成本核算是通过一定的方式方法对项目施工过程中发生的各种费用成本进行逐一统计考核的一种科学管理活动","碰撞检查不属于BIM在方案策划阶段的应用内容。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]