[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857286":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},857286,535,1,"单选题","下列选项中，不属于BIM施工预施工特点的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","消除施工的不确定性",false,{"key":16,"text":17,"correct":18},"B","通过深化设计，解决设计信息中没有体现的细节问题",true,{"key":20,"text":21,"correct":14},"C","降低施工风险",{"key":23,"text":24,"correct":14},"D","消除施工的不可预见性","BIM施工的“预施工”，预知施工难点，更大程度地消除施工的不确定性和不可预见性，降低施工风险，保证施工技术措施的可行、安全、合理和优化。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]