[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857265":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},857265,535,1,"单选题","大型复杂的建筑工程设计要经过初步设计、施工图设计两个阶段，小型简单建筑工程设计只作()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","初步设计",false,{"key":16,"text":17,"correct":18},"B","施工图设计",true,{"key":20,"text":21,"correct":14},"C","结构计算书",{"key":23,"text":24,"correct":14},"D","方案设计","施工图设计是指导施工的必要前提。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]