[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857261":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857261,535,1,"单选题","BIM施工安全与冲突分析系统应用中，时变结构和支撑体系的安全分析可通过模型数据转换机制，自动由4D施工信息模型生成()，进行施工期时变结构与支撑体系任意时间点的力学分析计算和安全性能评估。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建筑性能分析模型",false,{"key":16,"text":17,"correct":14},"B","附有成本信息的BIM数据模型",{"key":19,"text":20,"correct":14},"C","深化设计模型",{"key":22,"text":23,"correct":24},"D","结构分析模型",true,"能进行力学分析计算和安全性能评估的是结构分析模型。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]