[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857216":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},857216,535,1,"单选题","下列选项关于BIM组织架构说法不正确的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","BIM组织架构的建立即BIM团队的构建，是项目目标能否实现的重要影响因素",false,{"key":16,"text":17,"correct":18},"B","领导层主要设置行政主管，其主要负责该项目的对外沟通协调，包括与甲方互动沟通、与项目其他参与方协调等",true,{"key":20,"text":21,"correct":14},"C","管理层主要设置技术主管，其主要负责将BIM项目经理的项目任务安排落实到BIM操作人员，同时对BIM项目在各阶段实施过程中进行技术指导及监督",{"key":23,"text":24,"correct":14},"D","作业层主要设置建模团队、分析团队和咨询团队","领导层主要设置项目经理，其主要负责该项目的对外沟通协调，包括与甲方互动沟通、与项目其他参与方协调等。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]