[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857210":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},857210,535,1,"单选题","根据《建筑工程设计信息模型交付标准》，施工结算阶段对应的建模精细度应为()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","LOD300",false,{"key":16,"text":17,"correct":14},"B","LOD400",{"key":19,"text":20,"correct":21},"C","LOD500",true,{"key":23,"text":24,"correct":14},"D","LOD600","LOD300对应的是施工图招标控制价及施工准备等初步设计和施工图设计阶段，LOD400对应的是施工阶段造价控制。目前没有LOD600的划分。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]