[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857202":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857202,535,1,"单选题","1122",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","首先建立网格及楼层线，然后导人CAD文档，接着建立柱梁板墙等组件，而后进行彩现，最后进行明细表或CAD输出",true,{"key":16,"text":17,"correct":18},"B","首先进行彩现，然后导入CAD文档，接着建立柱梁板墙等组件，而后建立网格及楼层线，最后进行明细表或CAD输出",false,{"key":20,"text":21,"correct":18},"C","首先建立网格及楼层线，然后进行彩现，接着导人CAD文档，而后建立柱梁板墙等组件，最后进行明细表或CAD输出",{"key":23,"text":24,"correct":18},"D","首先建立网格及楼层线，然后导入CAD文档，接着建立柱梁板墙等组件，而后进行明细表或CAD输出，最后进行彩现","BIM建模流程为：首先建立网格及楼层线，然后导入CAD文档，接着建立柱梁板墙等组件，而后进行彩现，最后进行明细表或CAD输出。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]