[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":615},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,8,50,2220,[13,34,46,58,70,82,94,106,118,130,142,153,165,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,381,393,404,416,427,439,451,463,475,487,499,511,523,535,543,555,567,579,591,603],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},50225,1,"单选题","落实成本责任的首要前提是()。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","科学地预测实际成本",false,{"key":24,"text":25,"correct":22},"B","切实做好成本分析",{"key":27,"text":28,"correct":29},"C","科学地编制计划成本",true,{"key":31,"text":32,"correct":22},"D","提高全员成本意识","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},50227,"某施工企业2000年固定成本为1 200元，单位产值变动成本率为0．72，如产值实现8000元，其实际成本将达到()元。",[38,40,42,44],{"key":20,"text":39,"correct":22},"6 750",{"key":24,"text":41,"correct":22},"6 096",{"key":27,"text":43,"correct":22},"5 670",{"key":31,"text":45,"correct":29},"6 960",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},50230,"采用“按实计算分级编制”方法编制工程项目施工成本计划时，应首先要求成本责任部门或岗位提出()。",[50,52,54,56],{"key":20,"text":51,"correct":29},"分管成本项目的降低成本计划",{"key":24,"text":53,"correct":22},"分管成本项目的资金计划",{"key":27,"text":55,"correct":22},"分部分项工程的降低成本计划",{"key":31,"text":57,"correct":22},"分部分项工程的资金计划",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},50232,"根据历史成本的间接费用支出，结合压缩费用措施，可测算工程项目的()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"直接成本",{"key":24,"text":65,"correct":29},"间接成本",{"key":27,"text":67,"correct":22},"实际成本",{"key":31,"text":69,"correct":22},"计划成本",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},50235,"制定工程成本控制标准是指()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"规定各项工程成本开支和各种资源消耗的降低额",{"key":24,"text":77,"correct":22},"规定工程成本和相应资源消耗的降低率",{"key":27,"text":79,"correct":29},"规定各项工程成本开支和各种资源消耗的数量界限",{"key":31,"text":81,"correct":22},"规定工程成本和相应资源消耗的差异额",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},50238,"下列各项原则中，核算工程成本或划分工程成本费用界限应遵循的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"权责发生制原则",{"key":24,"text":89,"correct":22},"资金收付制原则",{"key":27,"text":91,"correct":22},"收支同步原则",{"key":31,"text":93,"correct":22},"以收定支原则",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},50240,"工程成本核算的依据是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"成本计划和施工计划",{"key":24,"text":101,"correct":22},"预算成本和计划成本",{"key":27,"text":103,"correct":29},"统计核算和业务核算",{"key":31,"text":105,"correct":22},"概算定额和预算定额",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},50243,"工程成本核算的基础是()。",[110,112,114,116],{"key":20,"text":111,"correct":29},"会计核算",{"key":24,"text":113,"correct":22},"业务核算",{"key":27,"text":115,"correct":22},"统计核算",{"key":31,"text":117,"correct":22},"资金核算",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},50245,"分摊应由当期负担而尚未支付的费用，在成本核算处理中应()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"先按计划成本数预提，以后再调整",{"key":24,"text":125,"correct":29},"按应分摊实际数预提",{"key":27,"text":127,"correct":22},"先按预算成本数预提，以后再调整",{"key":31,"text":129,"correct":22},"暂不计人成本",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},50248,"工程项目成本核算遵循()。",[134,136,138,140],{"key":20,"text":135,"correct":29},"权责发生制",{"key":24,"text":137,"correct":22},"实际发生制",{"key":27,"text":139,"correct":22},"收益发生制",{"key":31,"text":141,"correct":22},"预算发生制",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},50250,"完善成本控制的运行机制不包括()。",[146,148,150,152],{"key":20,"text":147,"correct":22},"加强中间检查控制",{"key":24,"text":149,"correct":22},"落实各级人员的成本责任",{"key":27,"text":151,"correct":29},"加强组织建设",{"key":31,"text":32,"correct":22},{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":31,"analysis":33},50252,"核算月度成本时，对由当期工程成本承担而尚未支付的材料费应（）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"在支付后计入成本",{"key":24,"text":160,"correct":22},"在当期部分计入工程成本",{"key":27,"text":162,"correct":22},"在成本中摊销",{"key":31,"text":164,"correct":29},"在当期全部计入工程成本",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},50255,"从主观原因分析，造成工程项目成本失控的关键是()。",[169,171,173,175],{"key":20,"text":170,"correct":29},"成本责任不到位、管理混乱",{"key":24,"text":172,"correct":22},"成本核算失真、滞后",{"key":27,"text":174,"correct":22},"计划成本编制不科学、不及时",{"key":31,"text":176,"correct":22},"成本分析走过场、没抓住主要原因",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},50257,"降低工程项目变动成本的关键是()。",[181,183,185,187],{"key":20,"text":182,"correct":22},"降低固定成本的绝对值",{"key":24,"text":184,"correct":22},"减少施工管理人员",{"key":27,"text":186,"correct":22},"增加施工作业人员",{"key":31,"text":188,"correct":29},"降低单位分项工程的消耗定额",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":31,"analysis":33},50260,"以工程成本发生时间划分的成本形式是()。",[193,195,197,199],{"key":20,"text":194,"correct":22},"项目工程成本和企业工程成本",{"key":24,"text":196,"correct":22},"直接成本和间接成本",{"key":27,"text":198,"correct":22},"固定成本和变动成本",{"key":31,"text":200,"correct":29},"预算成本、计划成本和实际成本",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},50262,"工程预算成本可作为()。",[205,207,209,211],{"key":20,"text":206,"correct":22},"工程的投标报价",{"key":24,"text":208,"correct":22},"工程的概算成本",{"key":27,"text":210,"correct":22},"核算实际成本的依据",{"key":31,"text":212,"correct":29},"编制计划成本的依据",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":27,"analysis":33},50265,"临时设施摊销费属于()。",[217,219,221,223],{"key":20,"text":218,"correct":22},"材料费",{"key":24,"text":220,"correct":22},"机械使用费",{"key":27,"text":222,"correct":29},"其他直接费",{"key":31,"text":224,"correct":22},"间接费",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},50267,"()是实现成本目标责任制的保证和实现决策目标的重要手段。",[229,231,233,235],{"key":20,"text":230,"correct":22},"成本预测",{"key":24,"text":232,"correct":22},"成本计划",{"key":27,"text":234,"correct":22},"成本控制",{"key":31,"text":236,"correct":29},"成本考核",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},50270,"建立工程成本管理体系的目的是()。",[241,243,245,247],{"key":20,"text":242,"correct":22},"不断改善工程管理",{"key":24,"text":244,"correct":29},"实现预定的工程目标成本",{"key":27,"text":246,"correct":22},"采用经济、技术、组织等降本措施",{"key":31,"text":248,"correct":22},"挖掘降本潜力",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":27,"analysis":33},50272,"工程成本管理的目的是()。",[253,255,257,259],{"key":20,"text":254,"correct":22},"采取措施降低工程实际成本",{"key":24,"text":256,"correct":22},"组织工程成本核算和分析",{"key":27,"text":258,"correct":29},"将实际成本控制在计划成本之内",{"key":31,"text":260,"correct":22},"强化对工程成本责任的检查和考核",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":31,"analysis":33},50275,"工程直接成本是指施工过程中直接耗费的()。",[265,267,269,271],{"key":20,"text":266,"correct":22},"构成工程实体的各项支出",{"key":24,"text":268,"correct":22},"有助于工程形成的各项支出",{"key":27,"text":270,"correct":22},"构成工程实体和部分有助于工程形成的各项支出",{"key":31,"text":272,"correct":29},"构成工程实体或有助于工程形成的各项支出",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},50277,"按工程成本发生的经济性质将成本分为()。",[277,279,281,283],{"key":20,"text":278,"correct":22},"变动成本、固定成本",{"key":24,"text":280,"correct":29},"直接成本、间接成本",{"key":27,"text":282,"correct":22},"计划成本、实际成本",{"key":31,"text":284,"correct":22},"企业成本、项目工程成本",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},50280,"项目计划成本的编制依据是()。",[289,291,293,295],{"key":20,"text":290,"correct":22},"投标价",{"key":24,"text":292,"correct":22},"合同价",{"key":27,"text":294,"correct":29},"预算成本",{"key":31,"text":296,"correct":22},"施工图预算",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":31,"analysis":33},50282,"项目成本降低额是考核项目成本目标的依据，其内容是指()的差额。",[301,303,305,307],{"key":20,"text":302,"correct":22},"预算成本与目标成本",{"key":24,"text":304,"correct":22},"计划成本与目标成本",{"key":27,"text":306,"correct":22},"预算成本与实际成本",{"key":31,"text":308,"correct":29},"计划成本与实际成本",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":27,"analysis":33},50284,"工程成本管理中将实际成本与预算成本的差额称为()。",[313,315,317,319],{"key":20,"text":314,"correct":22},"项目成本降低额",{"key":24,"text":316,"correct":22},"管理成本降低额",{"key":27,"text":318,"correct":29},"实际成本降低额",{"key":31,"text":320,"correct":22},"计划成本降低额",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":20,"analysis":33},50287,"我国现行财务会计制度规定的建筑施工企业工程成本计算和分配方法是（）。",[325,327,329,331],{"key":20,"text":326,"correct":29},"制造成本法",{"key":24,"text":328,"correct":22},"变动成本法",{"key":27,"text":330,"correct":22},"间接成本法",{"key":31,"text":332,"correct":22},"直接成本法",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":31,"analysis":33},50289,"通过分部分项工程实际消耗与预算计划的对比，可以（）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"计算该分部分项工程的实际成本",{"key":24,"text":340,"correct":22},"调整该分部分项工程的成本计划",{"key":27,"text":342,"correct":22},"把实际消耗控制在预算计划之内",{"key":31,"text":344,"correct":29},"发现成本费用偏差和偏差的原因",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":27,"analysis":33},50292,"某施工企业在进行工程成本分析时发现机械使用费超支，若想进一步分析超支的具体原因，应采用的分析方法是()。",[349,351,353,355],{"key":20,"text":350,"correct":22},"对比分析法",{"key":24,"text":352,"correct":22},"平衡分析法",{"key":27,"text":354,"correct":29},"因素分析法",{"key":31,"text":356,"correct":22},"盈亏平衡法",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":20,"analysis":33},50294,"工程成本核算对象一般是()。",[361,363,365,367],{"key":20,"text":362,"correct":29},"单位工程",{"key":24,"text":364,"correct":22},"分部分项工程",{"key":27,"text":366,"correct":22},"施工项目成本形成的各个阶段",{"key":31,"text":368,"correct":22},"施工项目的职能部门、施工队和作业班组",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":24,"analysis":33},50296,"在进行工程成本核算时，应划清收益性支出和资本性支出的界限。下列各项支出中，属于资本性支出的是()。",[373,375,377,379],{"key":20,"text":374,"correct":22},"机械使用费用的支出",{"key":24,"text":376,"correct":29},"购买固定资产的支出",{"key":27,"text":378,"correct":22},"企业财务费用的支出",{"key":31,"text":380,"correct":22},"企业管理费用的支出",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":31,"analysis":33},50299,"下列关于工程成本核算的说法中，正确的是()。",[385,387,389,391],{"key":20,"text":386,"correct":22},"工程成本核算与会计核算是并行的两个过程",{"key":24,"text":388,"correct":22},"工程成本核算不受施工企业现行会计制度的约束",{"key":27,"text":390,"correct":22},"工程成本核算的主要总账科目为“生产成本”",{"key":31,"text":392,"correct":29},"工程成本核算要以“谁受益、谁负担”为准则，将费用计人成本核算对象",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":24,"analysis":33},50301,"某工程人工费结算收入为84万元，实际支出为91万元，则人工成本降低率为()。",[397,399,401,402],{"key":20,"text":398,"correct":22},"7．69％",{"key":24,"text":400,"correct":29},"8．33％",{"key":27,"text":398,"correct":22},{"key":31,"text":403,"correct":22},"9．33％",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},50304,"工程成本分析的重点内容是()。",[408,410,412,414],{"key":20,"text":409,"correct":22},"分析计划成本执行情况",{"key":24,"text":411,"correct":29},"找出影响工程经济效益的主要因素",{"key":27,"text":413,"correct":22},"找出控制工程成本的改进措施",{"key":31,"text":415,"correct":22},"分析技术组织措施的节约效果",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":27,"analysis":33},50306,"财会部门核算工程成本的主要依据是（）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"核算范围和核算标准",{"key":24,"text":423,"correct":22},"成本计划和降低成本措施",{"key":27,"text":425,"correct":29},"统计核算和业务核算资料",{"key":31,"text":105,"correct":22},{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":31,"analysis":33},50318,"工程监理单位应当审查施工组织设计中的安全技术措施或者专项施工方案是否符合工程建设( )。",[431,433,435,437],{"key":20,"text":432,"correct":22},"技术标准",{"key":24,"text":434,"correct":22},"设计标准",{"key":27,"text":436,"correct":22},"验收规范",{"key":31,"text":438,"correct":29},"强制性标准",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":31,"analysis":33},50337,"安全管理是一门综合性的系统科学，其内容不包括( )。",[443,445,447,449],{"key":20,"text":444,"correct":22},"安全法规",{"key":24,"text":446,"correct":22},"安全技术",{"key":27,"text":448,"correct":22},"职业卫生",{"key":31,"text":450,"correct":29},"质量意识教育",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":20,"analysis":33},50347,"现行《建筑施工安全检查标准》将检查对象分为( )。",[455,457,459,461],{"key":20,"text":456,"correct":29},"十个分项",{"key":24,"text":458,"correct":22},"十七张项目检查表",{"key":27,"text":460,"correct":22},"十七张分项检查表",{"key":31,"text":462,"correct":22},"十个检查项目",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":24,"analysis":33},50358,"建筑施工行业是事故多发的高危行业，每年因生产安全事故造成的死亡人数居全国各行业的( )。",[467,469,471,473],{"key":20,"text":468,"correct":22},"第一位",{"key":24,"text":470,"correct":29},"第二位",{"key":27,"text":472,"correct":22},"第三位",{"key":31,"text":474,"correct":22},"第四位",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":20,"analysis":33},50360,"我国现行的安全生产管理体制为（）。",[479,481,483,485],{"key":20,"text":480,"correct":29},"生产经营单位负责、职工参与、政府监管、行业自律和社会监督",{"key":24,"text":482,"correct":22},"政府领导、部门监督、企业负责、群众监督、劳动者遵章守纪",{"key":27,"text":484,"correct":22},"国家检察、行政监督、群众监督、劳动者遵章守纪",{"key":31,"text":486,"correct":22},"国家检察、企业负责、群众监督、劳动者遵章守纪",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},50365,"依法对施工单位安全生产负全面责任的是该单位的()。",[491,493,495,497],{"key":20,"text":492,"correct":22},"法定代表人",{"key":24,"text":494,"correct":29},"主要负责人",{"key":27,"text":496,"correct":22},"技术负责人",{"key":31,"text":498,"correct":22},"施工负责人",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},50367,"施工总承包单位对施工现场的安全生产负()。",[503,505,507,509],{"key":20,"text":504,"correct":29},"总责",{"key":24,"text":506,"correct":22},"次要责任",{"key":27,"text":508,"correct":22},"连带责任",{"key":31,"text":510,"correct":22},"主要责任",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},50374,"施工企业提高全员安全素质、实现安全生产的基础是（）。",[515,517,519,521],{"key":20,"text":516,"correct":29},"开展安全生产教育",{"key":24,"text":518,"correct":22},"明确安全生产责任",{"key":27,"text":520,"correct":22},"制定安全技术措施",{"key":31,"text":522,"correct":22},"落实安全生产费用",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":27,"analysis":33},50379,"施工企业安全生产管理的重点是（）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"对施工人员进行安全生产教育",{"key":24,"text":530,"correct":22},"危险源的识别",{"key":27,"text":532,"correct":29},"施工现场安全管理",{"key":31,"text":534,"correct":22},"安全风险评价",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},50386,"现行《建筑施工安全检查标准》将检查对象分为()。",[539,540,541,542],{"key":20,"text":456,"correct":29},{"key":24,"text":458,"correct":22},{"key":27,"text":460,"correct":22},{"key":31,"text":462,"correct":22},{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":27,"analysis":33},50388,"工程监理单位在实施监理过程中，发现存在严重的安全事故隐患时，应当要求施工单位()。",[547,549,551,553],{"key":20,"text":548,"correct":22},"组织检查",{"key":24,"text":550,"correct":22},"立即报告上级部门",{"key":27,"text":552,"correct":29},"停工整改",{"key":31,"text":554,"correct":22},"开展安全教育",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":31,"analysis":33},50393,"施工安全管理的重点是()。",[559,561,563,565],{"key":20,"text":560,"correct":22},"落实安全责任制与采取安全技术措施",{"key":24,"text":562,"correct":22},"明确安全管理组织结构与采取安全管理措施",{"key":27,"text":564,"correct":22},"施工现场安全管理和施工安全管理的检查评价",{"key":31,"text":566,"correct":29},"控制施工中人的不安全行为和物的不安全状态",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":24,"analysis":33},50396,"对新工人的三级安全教育是指()。",[571,573,575,577],{"key":20,"text":572,"correct":22},"政府、企业和班组安全教育",{"key":24,"text":574,"correct":29},"公司、分公司(工程处)和班组安全教育",{"key":27,"text":576,"correct":22},"公司、项目和班组安全教育",{"key":31,"text":578,"correct":22},"政府、企业和项目安全教育",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":20,"analysis":33},50398,"申请领取施工许可证时,提供建设工程有关安全施工措施资料的单位应是()。",[583,585,587,589],{"key":20,"text":584,"correct":29},"建设单位",{"key":24,"text":586,"correct":22},"施工总承包单位",{"key":27,"text":588,"correct":22},"设计单位",{"key":31,"text":590,"correct":22},"工程监理单位",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":27,"analysis":33},50400,"施工安全交底、检查和验收的依据是施工组织设计（施工方案）规定的（）。",[595,597,599,601],{"key":20,"text":596,"correct":22},"施工工艺措施",{"key":24,"text":598,"correct":22},"施工进度计划",{"key":27,"text":600,"correct":29},"安全技术措施",{"key":31,"text":602,"correct":22},"资源配置计划",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":20,"analysis":33},50403,"施工现场生产事故应急救援预案针对的是各施工阶段中()。",[607,609,611,613],{"key":20,"text":608,"correct":29},"易发生重大事故的部位、环节",{"key":24,"text":610,"correct":22},"易发生事故的部位、环节",{"key":27,"text":612,"correct":22},"存在安全隐患的部位、环节",{"key":31,"text":614,"correct":22},"存在安全风险的部位、环节",[616,619,622,625,628,630],{"id":617,"name":618,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":620,"name":621,"category":7,"favorite":8},30,"经济师",{"id":623,"name":624,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":626,"name":627,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":629,"category":7,"favorite":8},"(初级)保险专业",{"id":631,"name":632,"category":7,"favorite":8},51,"(初级)财政税收"]