[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":593},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,7,50,2220,[13,34,46,58,69,79,88,97,109,121,133,140,152,164,172,184,196,208,220,232,244,256,263,275,287,298,310,318,329,339,351,363,375,387,399,411,426,438,450,462,474,486,498,509,521,533,545,557,569,581],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},50069,1,"单选题","建筑物外有围护结构的落地橱窗、走廊的层高超过()米时，应计算建筑全面积。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","2．1",false,{"key":24,"text":25,"correct":26},"B","2．2",true,{"key":28,"text":29,"correct":22},"C","3．2",{"key":31,"text":32,"correct":22},"D","3．3","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},50070,"单层建筑物的建筑面积计算规定是()。",[38,40,42,44],{"key":20,"text":39,"correct":26},"按建筑物外墙勒脚以上的外围水平面积计算",{"key":24,"text":41,"correct":22},"按建筑物外墙勒脚以下的外围水平面积计算",{"key":28,"text":43,"correct":22},"按建筑物外墙勒脚内包水平面积计算",{"key":31,"text":45,"correct":22},"按建筑物外墙中心线内包水平面积计算",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},50072,"编制施工图预算，确定工程造价、控制建设工程投资的依据是()。",[50,52,54,56],{"key":20,"text":51,"correct":26},"预算定额",{"key":24,"text":53,"correct":22},"材料消耗定额",{"key":28,"text":55,"correct":22},"劳动定额",{"key":31,"text":57,"correct":22},"概算定额",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},50073,"设计工程项目只要基本符合概算指标所列各项条件和结构特征可直接使用()编制概算。",[62,64,66,67],{"key":20,"text":63,"correct":26},"概算指标",{"key":24,"text":65,"correct":22},"费用定额",{"key":28,"text":57,"correct":22},{"key":31,"text":68,"correct":22},"人工定额",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":24,"analysis":33},50075,"概算定额是在()的基础上综合而成的。",[73,75,76,77],{"key":20,"text":74,"correct":22},"施工定额",{"key":24,"text":51,"correct":26},{"key":28,"text":63,"correct":22},{"key":31,"text":78,"correct":22},"投资估算指标",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":28,"analysis":33},50076,"概算指标是（ ）的扩大与合并。",[83,84,85,86],{"key":20,"text":74,"correct":22},{"key":24,"text":51,"correct":22},{"key":28,"text":57,"correct":26},{"key":31,"text":87,"correct":22},"施工图设计",{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":24,"analysis":33},50078,"概算指标是在()基础上编制的。",[92,93,95,96],{"key":20,"text":65,"correct":22},{"key":24,"text":94,"correct":26},"概算定额和预算定额",{"key":28,"text":57,"correct":22},{"key":31,"text":68,"correct":22},{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":24,"analysis":33},50089,"暂估价，是指招标人在工程量清单中提供的用于支付（ ）的材料的单价以及专业工程的金额。",[101,103,105,107],{"key":20,"text":102,"correct":22},"可能发生但暂时不能确定",{"key":24,"text":104,"correct":26},"必然发生但暂时不能确定",{"key":28,"text":106,"correct":22},"尚未确定",{"key":31,"text":108,"correct":22},"不可预见",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":31,"analysis":33},50094,"实行招标的工程合同价款应在中标通知书发出之日起( )天内，由发、承包人双方依据招标文件和中标人的投标文件在书面合同中约定。",[113,115,117,119],{"key":20,"text":114,"correct":22},"14",{"key":24,"text":116,"correct":22},"15",{"key":28,"text":118,"correct":22},"28",{"key":31,"text":120,"correct":26},"30",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":28,"analysis":33},50099,"承包人向发包人提交的竣工结算款支付申请中，不包括( )。",[125,127,129,131],{"key":20,"text":126,"correct":22},"应预留的质量保证金",{"key":24,"text":128,"correct":22},"累计已实际支付的合同价款",{"key":28,"text":130,"correct":26},"累计已抵扣的预付工程量金额",{"key":31,"text":132,"correct":22},"竣工结算合同价款总额",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":135,"answer":28,"analysis":33},50106,[136,137,138,139],{"key":20,"text":126,"correct":22},{"key":24,"text":128,"correct":22},{"key":28,"text":130,"correct":26},{"key":31,"text":132,"correct":22},{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":28,"analysis":33},50108,"下列关于工程计价争议处理的说法中，错误的是()。",[144,146,148,150],{"key":20,"text":145,"correct":22},"发、承包双方发生工程造价合同纠纷时，可以协商解决",{"key":24,"text":147,"correct":22},"发、承包双方发生工程造价合同纠纷时，可以提请调解",{"key":28,"text":149,"correct":26},"调解是在自愿的基础上进行的，其结果同样具有法律约束力",{"key":31,"text":151,"correct":22},"发、承包双方发生工程造价合同纠纷时，可以提请仲裁或诉讼",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},50109,"为完成工程项目施工，发生于该工程施工准备和施工过程中的技术、生活、安全、环境保护等方面的非工程实体项目是()项目。",[156,158,160,162],{"key":20,"text":157,"correct":26},"措施",{"key":24,"text":159,"correct":22},"其他",{"key":28,"text":161,"correct":22},"补充",{"key":31,"text":163,"correct":22},"规费",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":31,"analysis":33},50111,"实行招标的工程合同价款应在中标通知书发出之日起()天内，由发、承包人双方依据招标文件和中标人的投标文件在书面合同中约定。",[168,169,170,171],{"key":20,"text":114,"correct":22},{"key":24,"text":116,"correct":22},{"key":28,"text":118,"correct":22},{"key":31,"text":120,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":31,"analysis":33},50112,"下列各项因不可抗力导致的费用或伤害中，应由承包人承担的是()。",[176,178,180,182],{"key":20,"text":177,"correct":22},"工程本身的损害",{"key":24,"text":179,"correct":22},"工程所需清理、修复费用",{"key":28,"text":181,"correct":22},"因工程损害导致第三方人员伤亡",{"key":31,"text":183,"correct":26},"施工机械的损坏及停工损失",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":28,"analysis":33},50114,"工程量清单计价模式下的工程费用包括分部分项工程费、措施项目费、其他项目费和()。",[188,190,192,194],{"key":20,"text":189,"correct":22},"管理费、税金",{"key":24,"text":191,"correct":22},"材料费、规费",{"key":28,"text":193,"correct":26},"规费、税金",{"key":31,"text":195,"correct":22},"管理费、规费",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":28,"analysis":33},50116,"分部分项工程量清单项目编码以()级编码设置。",[200,202,204,206],{"key":20,"text":201,"correct":22},"三",{"key":24,"text":203,"correct":22},"四",{"key":28,"text":205,"correct":26},"五",{"key":31,"text":207,"correct":22},"六",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":31,"analysis":33},50117,"根据《建设工程工程量清单计价规范》，应列入其他项目清单项目的是( )。",[212,214,216,218],{"key":20,"text":213,"correct":22},"工程排污费",{"key":24,"text":215,"correct":22},"工程定额测定费",{"key":28,"text":217,"correct":22},"社会保障费",{"key":31,"text":219,"correct":26},"总承包服务费",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":28,"analysis":33},50119,"在编制招标控制价时，暂估价中专业工程金额应（）填写。",[224,226,228,230],{"key":20,"text":225,"correct":22},"工程造价管理机构发布的工程造价信息中的金额",{"key":24,"text":227,"correct":22},"省级、行业建设主管部门公布的价格",{"key":28,"text":229,"correct":26},"按招标工程量清单中列出的金额",{"key":31,"text":231,"correct":22},"已标价工程量清单中列出的金额",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":20,"analysis":33},50120,"在工程计价争议处理方法中，解决争执最基本、最常见和最有效的方法为（）。",[236,238,240,242],{"key":20,"text":237,"correct":26},"协商",{"key":24,"text":239,"correct":22},"调解",{"key":28,"text":241,"correct":22},"仲裁",{"key":31,"text":243,"correct":22},"诉讼",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":28,"analysis":33},50122,"根据《建设工程工程量清单计价规范》，对任一招标工程量清单项目，如果因工程量偏差和工程量变更等原因导致工程量偏差超过5%，且不超过15%时，应( )。",[248,250,252,254],{"key":20,"text":249,"correct":22},"调整其综合单价",{"key":24,"text":251,"correct":22},"调整其措施费",{"key":28,"text":253,"correct":26},"执行原有的综合单价",{"key":31,"text":255,"correct":22},"调整其他项目费",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":258,"answer":24,"analysis":33},50123,[259,260,261,262],{"key":20,"text":102,"correct":22},{"key":24,"text":104,"correct":26},{"key":28,"text":106,"correct":22},{"key":31,"text":108,"correct":22},{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":28,"analysis":33},50125,"在工程量清单计价模式下，下列各项因不可抗力导致的损失或费用中，应由承包人承担的是（）。",[267,269,271,273],{"key":20,"text":268,"correct":22},"工程本身损害导致的损失",{"key":24,"text":270,"correct":22},"工程所需清理费用",{"key":28,"text":272,"correct":26},"承包人机械设备损坏的损失",{"key":31,"text":274,"correct":22},"因工程损害导致第三方人员伤亡的相应费用",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":24,"analysis":33},50127,"下列说法不正确的是（ ）",[279,281,283,285],{"key":20,"text":280,"correct":22},"经承发包双方确认调整的合同价款，作为追加（减）合同价款， 与工程进度款或结算款同期支付；",{"key":24,"text":282,"correct":26},"招标工程以合同签订前28天为基准日，其后因国家法律法规变化的，不应调整合同价款；",{"key":28,"text":284,"correct":22},"因承包人原因导致工期延误的，在合同工程原定竣工时间之后，合同价款调增的不予调整，合同价款调减的予以调整；",{"key":31,"text":286,"correct":22},"如果承发包双方就合同价格和工期调整无法达成一致时，双方可在合同约定中由总监工程师承担商定与确定的组织和实施责任。",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":28,"analysis":33},50128,"下列项目中，不属于规费项目清单内容的是（）。",[291,292,294,296],{"key":20,"text":213,"correct":22},{"key":24,"text":293,"correct":22},"工伤保险费",{"key":28,"text":295,"correct":26},"劳动保险费",{"key":31,"text":297,"correct":22},"医疗保险费",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},50130,"根据《建设工程量清单计价规范》(GB 50500—2008)，在工程计价中，对工程造价依据、办法以及相关政策规定发生争议事项的，由()负责解释。",[302,304,306,308],{"key":20,"text":303,"correct":26},"工程造价管理机构",{"key":24,"text":305,"correct":22},"发包方",{"key":28,"text":307,"correct":22},"行业建设主管部门",{"key":31,"text":309,"correct":22},"承包方",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},50131,"工程量清单补充项目的编码由附录的顺序码与B和()位阿拉伯数字组成。",[314,315,316,317],{"key":20,"text":201,"correct":26},{"key":24,"text":203,"correct":22},{"key":28,"text":205,"correct":22},{"key":31,"text":207,"correct":22},{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},50133,"采用工程量清单方式招标，工程量清单必须作为招标文件的组成部分，其准确性和完整性由()负责。",[322,324,326,327],{"key":20,"text":323,"correct":26},"招标人",{"key":24,"text":325,"correct":22},"投标人",{"key":28,"text":307,"correct":22},{"key":31,"text":328,"correct":22},"工程造价咨询人",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":31,"analysis":33},50134,"工程量清单应由具有编制招标文件能力的()或受其委托具有相应资质的中介机构进行编制。",[333,335,336,338],{"key":20,"text":334,"correct":22},"招标代理机构",{"key":24,"text":325,"correct":22},{"key":28,"text":337,"correct":22},"招投标管理机构",{"key":31,"text":323,"correct":26},{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":28,"analysis":33},50136,"（）的工程建设项目，必须采用工程量清单计价。",[343,345,347,349],{"key":20,"text":344,"correct":22},"国家重点建设",{"key":24,"text":346,"correct":22},"利用外国政府或国际组织贷款、援助资金",{"key":28,"text":348,"correct":26},"全部使用国有资金投资或国有资金投资为主",{"key":31,"text":350,"correct":22},"关系社会公共利益、公众安全",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":20,"analysis":33},50137,"关于合同价款约定一般规定的说法，正确的是( )。",[355,357,359,361],{"key":20,"text":356,"correct":26},"实行工程量清单计价的工程应采用单价合同",{"key":24,"text":358,"correct":22},"招标文件与中标人投标文件不一致的地方应以招标文件为准",{"key":28,"text":360,"correct":22},"实行工程量清单计价的工程应采用总价合同",{"key":31,"text":362,"correct":22},"实行工程量清单计价的工程应采用成本加酬金合同",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":31,"analysis":33},50139,"《建设工程工程量清单计价规范》（GB50500—2008）规定，分部分项工程量清单的项目编码用（）位阿拉伯数字表示。",[367,369,371,373],{"key":20,"text":368,"correct":22},"9",{"key":24,"text":370,"correct":22},"10",{"key":28,"text":372,"correct":22},"11",{"key":31,"text":374,"correct":26},"12",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":31,"analysis":33},50178,"某施工企业2000年固定成本为1 200元，单位产值变动成本率为0．72，如产值实现8000元，其实际成本将达到( )元。",[379,381,383,385],{"key":20,"text":380,"correct":22},"6 750",{"key":24,"text":382,"correct":22},"6 096",{"key":28,"text":384,"correct":22},"5 670",{"key":31,"text":386,"correct":26},"6 960",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":24,"analysis":33},50182,"在进行工程成本核算时，应划清收益性支出和资本性支出的界限。下列各项支出中，属于资本性支出的是( )。",[391,393,395,397],{"key":20,"text":392,"correct":22},"机械使用费用的支出",{"key":24,"text":394,"correct":26},"购买固定资产的支出",{"key":28,"text":396,"correct":22},"企业财务费用的支出",{"key":31,"text":398,"correct":22},"企业管理费用的支出",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},50187,"某工程人工费结算收入为84万元，实际支出为91万元，则人工成本降低率为( )。",[403,405,407,409],{"key":20,"text":404,"correct":22},"7．69％",{"key":24,"text":406,"correct":26},"8．33％",{"key":28,"text":408,"correct":22},"7．89％",{"key":31,"text":410,"correct":22},"9．33％",{"id":412,"libraryId":5,"type":413,"typeLabel":414,"stem":415,"options":416,"answer":425,"analysis":33},50191,2,"多选题","某工程项目分解为基础工程、主体工程、屋面工程、装饰工程四个施工过程，划分为四个施工段组织流水作业，每一施工过程由一个专业工作队负责施工。各施工过程在各个施工段上的流水节拍如下表所示 回答72-75题; 根据该工程项目各施工过程时间参数的特征，下列关于该工程项目流水施工的说法中，正确的是（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":26},"该工程项目适宜采用分别流水组织施工",{"key":24,"text":420,"correct":22},"该工程项目适宜采用成倍节拍组织流水施工",{"key":28,"text":422,"correct":26},"组织该工程项目流水施工应使相邻专业工作队在开工时间上最大限度地搭接",{"key":31,"text":424,"correct":26},"组织该工程项目流水施工的关键问题是确定相邻专业工作队之间的流水步距","ACD",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":28,"analysis":33},50202,"施工企业成本包括()两个部分。",[430,432,434,436],{"key":20,"text":431,"correct":22},"资本化成本和费用化成本",{"key":24,"text":433,"correct":22},"直接工程成本和措施成本",{"key":28,"text":435,"correct":26},"工程成本和期间成本",{"key":31,"text":437,"correct":22},"变动成本和间接成本",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":24,"analysis":33},50204,"下列各项工程成本中，属于固定成本的是()。",[442,444,446,448],{"key":20,"text":443,"correct":22},"直接人工费",{"key":24,"text":445,"correct":26},"管理人员工资",{"key":28,"text":447,"correct":22},"直接材料费",{"key":31,"text":449,"correct":22},"检验试验费",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":28,"analysis":33},50205,"工程的预算成本反映的是()。",[454,456,458,460],{"key":20,"text":455,"correct":22},"本企业的平均成本水平",{"key":24,"text":457,"correct":22},"建筑业的平均成本水平",{"key":28,"text":459,"correct":26},"各地区建筑业的平均成本水平",{"key":31,"text":461,"correct":22},"各国建筑业的平均成本水平",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":31,"analysis":33},50207,"施工项目成本预测是()。",[466,468,470,472],{"key":20,"text":467,"correct":22},"评价实际成本的依据",{"key":24,"text":469,"correct":22},"编制预算成本的依据",{"key":28,"text":471,"correct":22},"考核项目成本目标的依据",{"key":31,"text":473,"correct":26},"施工项目成本决策与计划的依据",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":31,"analysis":33},50209,"工程成本管理的环节包括()。",[478,480,482,484],{"key":20,"text":479,"correct":22},"预测、计划和控制",{"key":24,"text":481,"correct":22},"预测、计划、控制和核算",{"key":28,"text":483,"correct":22},"预测、计划、控制、核算和分析",{"key":31,"text":485,"correct":26},"预测、计划、控制、核算、分析和考核",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},50210,"影响工程成本的因素不包括()。",[490,492,494,496],{"key":20,"text":491,"correct":26},"工程质量",{"key":24,"text":493,"correct":22},"完成单位工程量的物资和活劳动消耗数量",{"key":28,"text":495,"correct":22},"物资和活劳动的单价",{"key":31,"text":497,"correct":22},"工程量",{"id":499,"libraryId":5,"type":413,"typeLabel":414,"stem":500,"options":501,"answer":28,"analysis":33},50211,"某工程项目分解为基础工程、主体工程、层面工程、装饰工程四个施工过程，划分为四个施工段组织流水作业，每一施工过程由一个专业工作队负责施工。各施工过程在各个施工段上的流水节拍如下表所示。 该工程项目的流水施工工期为( )个月。",[502,504,506,508],{"key":20,"text":503,"correct":22},"22",{"key":24,"text":505,"correct":22},"24",{"key":28,"text":507,"correct":26},"26",{"key":31,"text":118,"correct":22},{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},50212,"按生产费用与工程量的关系划分的工程成本形式是()。",[513,515,517,519],{"key":20,"text":514,"correct":22},"预算成本、计划成本和实际成本",{"key":24,"text":516,"correct":26},"固定成本和变动成本",{"key":28,"text":518,"correct":22},"直接成本和间接成本",{"key":31,"text":520,"correct":22},"项目工程成本和企业工程成本",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},50214,"下列各项中，()不属于工程成本。",[525,527,529,531],{"key":20,"text":526,"correct":26},"企业管理费",{"key":24,"text":528,"correct":22},"生产工人的工资",{"key":28,"text":530,"correct":22},"施工机械的租赁费",{"key":31,"text":532,"correct":22},"消耗的主辅材料的购置费",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":28,"analysis":33},50215,"固定成本的特点有()。",[537,539,541,543],{"key":20,"text":538,"correct":22},"工程量与固定费用无关",{"key":24,"text":540,"correct":22},"与工程量成正比",{"key":28,"text":542,"correct":26},"与工程量增减变化无直接关系",{"key":31,"text":544,"correct":22},"工程量完成的越多，分摊的固定费用就越多",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":28,"analysis":33},50217,"工程成本是指企业以施工项目作为成本核算对象的施工过程中所耗费的()的货币形式。",[549,551,553,555],{"key":20,"text":550,"correct":22},"生产资料转移的价值",{"key":24,"text":552,"correct":22},"劳动力所创造的价值",{"key":28,"text":554,"correct":26},"生产资料转移的价值和劳动力所创造的价值",{"key":31,"text":556,"correct":22},"以上都不是",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":31,"analysis":33},50219,"构成工程实体主要材料的成本属于()。",[561,563,565,567],{"key":20,"text":562,"correct":22},"间接成本",{"key":24,"text":564,"correct":22},"变动成本",{"key":28,"text":566,"correct":22},"固定成本",{"key":31,"text":568,"correct":26},"直接成本",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},50221,"材料二次搬运费属于（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"材料费",{"key":24,"text":576,"correct":26},"其他直接费",{"key":28,"text":578,"correct":22},"直接费",{"key":31,"text":580,"correct":22},"间接费",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":28,"analysis":33},50223,"某施工企业购置了一台塔式起重机。关于该笔固定资产支出处理方式的说法，正确的是（）。",[585,587,589,591],{"key":20,"text":586,"correct":22},"可以一次性列入企业成本",{"key":24,"text":588,"correct":22},"可以一次性列入期间成本",{"key":28,"text":590,"correct":26},"不得一次性列入工程成本",{"key":31,"text":592,"correct":22},"可以部分列入期间成本",[594,597,600,603,606,608],{"id":595,"name":596,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":598,"name":599,"category":7,"favorite":8},30,"经济师",{"id":601,"name":602,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":604,"name":605,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":607,"category":7,"favorite":8},"(初级)保险专业",{"id":609,"name":610,"category":7,"favorite":8},51,"(初级)财政税收"]