[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":578},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,6,50,2220,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,187,198,207,218,226,237,245,257,269,281,293,303,315,327,339,351,363,375,387,395,407,419,430,442,454,466,478,486,494,502,514,526,538,549,557,566],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},49934,1,"单选题","建设单位拨付工程款应经()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","监理人员签字",false,{"key":24,"text":25,"correct":22},"B","监理工程师同意",{"key":27,"text":28,"correct":22},"C","监理单位签字",{"key":30,"text":31,"correct":32},"D","总监理工程师签字",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},49938,"对于没有造成人员伤亡和重大直接经济损失，但是已经造成了恶劣社会影响的质量问题的处理原则是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"认定为重大质量事故",{"key":24,"text":41,"correct":22},"认定为较大质量事故",{"key":27,"text":43,"correct":22},"不构成质量事故",{"key":30,"text":45,"correct":32},"视同质量事故",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},49941,"下列工作中，属于施工过程工序质量监控重点的是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"制定工艺规程",{"key":24,"text":53,"correct":22},"进行成品保护",{"key":27,"text":55,"correct":22},"组织材料和构配件的实验",{"key":30,"text":57,"correct":32},"遵守工艺规程",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},49943,"分项工程验收，应由()组织。",[62,64,66,68],{"key":20,"text":63,"correct":22},"总监理工程师",{"key":24,"text":65,"correct":22},"施工单位项目经理",{"key":27,"text":67,"correct":32},"监理工程师",{"key":30,"text":69,"correct":22},"施工单位质量负责人",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},49952,"有一建筑队，有5个砖工，共干38天(8小时工作制)，共砌砖100m3，则其时间定额是( )工日／m3",[74,76,78,80],{"key":20,"text":75,"correct":22},"2．5",{"key":24,"text":77,"correct":32},"1．9",{"key":27,"text":79,"correct":22},"0．08",{"key":30,"text":81,"correct":22},"0．05",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},49954,"劳动定额中的时间定额以( )为单位。",[86,88,90,92],{"key":20,"text":87,"correct":22},"台时",{"key":24,"text":89,"correct":32},"工日",{"key":27,"text":91,"correct":22},"台班",{"key":30,"text":93,"correct":22},"每工产量",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},49960,"铺贴水磨石板地面，其时间定额为0.143 工日／m2，那么产量定额是( )m2／工日。",[98,100,102,104],{"key":20,"text":99,"correct":32},"6.99",{"key":24,"text":101,"correct":22},"6.4",{"key":27,"text":103,"correct":22},"7.82",{"key":30,"text":105,"correct":22},"4.5",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},49966,"一个抹灰小组12人，工作6小时(8小时工作制)，完成抹灰54m2，计算其产量定额为( )m2／工日。",[110,112,114,116],{"key":20,"text":111,"correct":22},"6．5",{"key":24,"text":113,"correct":32},"6",{"key":27,"text":115,"correct":22},"4．5",{"key":30,"text":117,"correct":22},"3．9",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},49975,"下列选项中， ( )不是施工图预算的作用。",[122,124,126,128],{"key":20,"text":123,"correct":22},"确定工程造价的依据",{"key":24,"text":125,"correct":22},"建设单位与施工单位进行招、投标签订承包合同的依据",{"key":27,"text":127,"correct":32},"选择确定设计方案的依据",{"key":30,"text":129,"correct":22},"支付工程价款及工程结算的依据",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},49995,"概算指标是（ ）的扩大与合并。",[134,136,138,140],{"key":20,"text":135,"correct":22},"施工定额",{"key":24,"text":137,"correct":22},"预算定额",{"key":27,"text":139,"correct":32},"概算定额",{"key":30,"text":141,"correct":22},"施工图设计",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},50000,"工程建设定额是指在正常的施工条件下，完成一定计量单位的合格产品所必须消耗的劳动力、材料、机械设备及资金的()标准。",[146,148,150,152],{"key":20,"text":147,"correct":32},"数量",{"key":24,"text":149,"correct":22},"质量",{"key":27,"text":151,"correct":22},"价格",{"key":30,"text":153,"correct":22},"施工",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},50002,"措施费定额属于（）定额。",[158,160,162,164],{"key":20,"text":159,"correct":22},"建筑工程",{"key":24,"text":161,"correct":22},"设备安装工程",{"key":27,"text":163,"correct":32},"建筑安装工程费用",{"key":30,"text":165,"correct":22},"工程建设其他费用",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},50003,"按生产要素内容分类，工程建设定额包括劳动定额、材料消耗定额和()。",[170,172,174,176],{"key":20,"text":171,"correct":22},"人工定额",{"key":24,"text":173,"correct":32},"施工机械台班使用定额",{"key":27,"text":175,"correct":22},"措施项目费定额",{"key":30,"text":177,"correct":22},"间接费定额",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":30,"analysis":33},50005,"确定分项工程单价的基础是（）。",[182,183,184,186],{"key":20,"text":135,"correct":22},{"key":24,"text":139,"correct":22},{"key":27,"text":185,"correct":22},"概算指标",{"key":30,"text":137,"correct":32},{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},50006,"建筑安装工程费用定额包括( )。",[191,192,194,196],{"key":20,"text":177,"correct":32},{"key":24,"text":193,"correct":22},"工具定额",{"key":27,"text":195,"correct":22},"器具定额",{"key":30,"text":197,"correct":22},"材料消耗定额",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":20,"analysis":33},50008,"编制概算定额的基础是（）。",[202,203,204,205],{"key":20,"text":137,"correct":32},{"key":24,"text":135,"correct":22},{"key":27,"text":185,"correct":22},{"key":30,"text":206,"correct":22},"工程量清单",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":27,"analysis":33},50010,"工程建设的定额按编制单位和适用范围不同可分为国家定额、行业定额、地区定额和()。",[211,213,214,216],{"key":20,"text":212,"correct":22},"施工人员的安全管理",{"key":24,"text":135,"correct":22},{"key":27,"text":215,"correct":32},"企业定额",{"key":30,"text":217,"correct":22},"建筑工程定额",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":24,"analysis":33},50011,"有一建筑队，有5个砖工，共干38天(8小时工作制)，共砌砖100m3，则其时间定额是()工日／m3",[222,223,224,225],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":32},{"key":27,"text":79,"correct":22},{"key":30,"text":81,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},50013,"铺贴水磨石板地面，其时间定额为0.143 工日／m2，那么产量定额是()工日／m2。",[230,232,234,236],{"key":20,"text":231,"correct":32},"6．99",{"key":24,"text":233,"correct":22},"6．4",{"key":27,"text":235,"correct":22},"7．82",{"key":30,"text":115,"correct":22},{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},50014,"劳动定额中的时间定额以()为单位。",[241,242,243,244],{"key":20,"text":87,"correct":22},{"key":24,"text":89,"correct":32},{"key":27,"text":91,"correct":22},{"key":30,"text":93,"correct":22},{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":27,"analysis":33},50017,"定额时间中的有效工作时间不包括()。",[249,251,253,255],{"key":20,"text":250,"correct":22},"基本工作时间",{"key":24,"text":252,"correct":22},"准备与结束工作时间",{"key":27,"text":254,"correct":32},"不可避免中断时间",{"key":30,"text":256,"correct":22},"辅助工作时间",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":24,"analysis":33},50019,"已知水泥净用量是300m3，损耗率是3％，那么水泥的总耗量是()m3。",[261,263,265,267],{"key":20,"text":262,"correct":22},"291",{"key":24,"text":264,"correct":32},"309",{"key":27,"text":266,"correct":22},"390",{"key":30,"text":268,"correct":22},"399",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":20,"analysis":33},50020,"墙体工程中，运输砂浆的用工量属于（）用工。",[273,275,277,279],{"key":20,"text":274,"correct":32},"基本",{"key":24,"text":276,"correct":22},"人工幅度差",{"key":27,"text":278,"correct":22},"辅助",{"key":30,"text":280,"correct":22},"超运距",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":27,"analysis":33},50025,"缺乏编制定额的必要资料、数据时，制订定额一般采用的方法是()。",[285,287,289,291],{"key":20,"text":286,"correct":22},"统计计算法",{"key":24,"text":288,"correct":22},"评估法",{"key":27,"text":290,"correct":32},"经验估计法",{"key":30,"text":292,"correct":22},"技术鉴定法",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},50027,"劳动定额的工人工作时间中，为保证基本工作能顺利完成所消耗的时间，称为工人的( )工作时间。",[297,298,299,301],{"key":20,"text":274,"correct":22},{"key":24,"text":278,"correct":32},{"key":27,"text":300,"correct":22},"准备",{"key":30,"text":302,"correct":22},"有效",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},50028,"在确定材料定额消耗量时，建筑工程必须消耗的材料不包括()。",[307,309,311,313],{"key":20,"text":308,"correct":32},"不可避免的场外运输损耗材料",{"key":24,"text":310,"correct":22},"直接使用在工程上的材料",{"key":27,"text":312,"correct":22},"不可避免的施工废料",{"key":30,"text":314,"correct":22},"不可避免的场内运输损耗材料",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":20,"analysis":33},50030,"下列对预算定额的描述中，正确的是()。",[319,321,323,325],{"key":20,"text":320,"correct":32},"预算定额是计价定额",{"key":24,"text":322,"correct":22},"预算定额是直接用于施工管理中的定额",{"key":27,"text":324,"correct":22},"预算定额是初步设计阶段编制的定额",{"key":30,"text":326,"correct":22},"预算定额是在概算定额的基础上综合而成的",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":27,"analysis":33},50031,"下列建筑物的组成部分中，应按一层计算建筑面积的是( )。",[331,333,335,337],{"key":20,"text":332,"correct":22},"建筑物内的室内楼梯间",{"key":24,"text":334,"correct":22},"建筑物内的管道井",{"key":27,"text":336,"correct":32},"建筑物的门厅",{"key":30,"text":338,"correct":22},"建筑物内的电梯井",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":24,"analysis":33},50033,"预算定额的编制应遵循()原则。",[343,345,347,349],{"key":20,"text":344,"correct":22},"一般水平",{"key":24,"text":346,"correct":32},"统一性和差别性相结合",{"key":27,"text":348,"correct":22},"以专家为主",{"key":30,"text":350,"correct":22},"独立自主",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":30,"analysis":33},50034,"施工劳动定额中未包括的，而在一般正常施工情况下又不可避免的一些零星用工称为()。",[355,357,359,361],{"key":20,"text":356,"correct":22},"基本用工",{"key":24,"text":358,"correct":22},"超运距用工",{"key":27,"text":360,"correct":22},"辅助用",{"key":30,"text":362,"correct":32},"人工幅度差用工",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":20,"analysis":33},50036,"预算定额的编制应遵循按()水平确定的原则。",[367,369,371,373],{"key":20,"text":368,"correct":32},"平均",{"key":24,"text":370,"correct":22},"平均先进",{"key":27,"text":372,"correct":22},"先进",{"key":30,"text":374,"correct":22},"行业先进",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":27,"analysis":33},50038,"单层建筑物的建筑面积利用坡屋顶内空间时，净高超过()米的部分应计算全面积。",[379,381,383,385],{"key":20,"text":380,"correct":22},"1．20",{"key":24,"text":382,"correct":22},"2．00",{"key":27,"text":384,"correct":32},"2．10",{"key":30,"text":386,"correct":22},"2．20",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":27,"analysis":33},50039,"砌筑墙体工程的调制砂浆用工量属于()用工。",[391,392,393,394],{"key":20,"text":280,"correct":22},{"key":24,"text":276,"correct":22},{"key":27,"text":274,"correct":32},{"key":30,"text":278,"correct":22},{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":20,"analysis":33},50041,"预算定额中人工消耗指标包括基本用工和()。",[399,401,403,405],{"key":20,"text":400,"correct":32},"其他用工",{"key":24,"text":402,"correct":22},"有效用工",{"key":27,"text":404,"correct":22},"偶然用工",{"key":30,"text":406,"correct":22},"多余用工",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},50042,"室内楼梯间、电梯井、提物井、垃圾道、管道井等均按建筑物的()计算面积。",[411,413,415,417],{"key":20,"text":412,"correct":32},"自然层",{"key":24,"text":414,"correct":22},"投影面积的一半",{"key":27,"text":416,"correct":22},"投影面积",{"key":30,"text":418,"correct":22},"上口水平面积",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":20,"analysis":33},50045,"下列工程中，应按建筑物自然层水平投影面积的1\u002F2计算的是（）。",[423,425,427,428],{"key":20,"text":424,"correct":32},"有永久顶盖的室外楼梯",{"key":24,"text":426,"correct":22},"层高在2.20米以上的半地下室",{"key":27,"text":332,"correct":22},{"key":30,"text":429,"correct":22},"建筑物内的变形缝",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},50047,"工人在工作班内消耗的工作时间，按其消耗的性质，可以分为两大类，即必须消耗的时间和()。",[434,436,438,440],{"key":20,"text":435,"correct":22},"多余时间",{"key":24,"text":437,"correct":32},"损失时间",{"key":27,"text":439,"correct":22},"休息时间",{"key":30,"text":441,"correct":22},"停工时间",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},50048,"按()分类，工程建设定额可分为施工定额、预算定额、概算定额、概算指标和投资估算指标。",[446,448,450,452],{"key":20,"text":447,"correct":22},"生产要素",{"key":24,"text":449,"correct":32},"编制的程序和用途",{"key":27,"text":451,"correct":22},"专业及费用性质",{"key":30,"text":453,"correct":22},"主编单位及执行范围",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},50050,"工程建设定额按照（）不同，可以分为劳动定额、材料消耗定额、施工机械台班使用定额。",[458,460,462,464],{"key":20,"text":459,"correct":22},"编制程序",{"key":24,"text":461,"correct":32},"生产要素内容",{"key":27,"text":463,"correct":22},"编制用途",{"key":30,"text":465,"correct":22},"投资费用性质",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":27,"analysis":33},50051,"施工定额的编制对象是（）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"分部分项工程",{"key":24,"text":473,"correct":22},"扩大的分部分项工程",{"key":27,"text":475,"correct":32},"工序",{"key":30,"text":477,"correct":22},"单位工程",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":30,"analysis":33},50053,"向班组签发施工任务书和限额领料单所适用的定额是()。",[482,483,484,485],{"key":20,"text":139,"correct":22},{"key":24,"text":137,"correct":22},{"key":27,"text":185,"correct":22},{"key":30,"text":135,"correct":32},{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},50055,"在编制施工定额时，施工定额水平的确定必须遵循()原则。",[490,491,492,493],{"key":20,"text":370,"correct":32},{"key":24,"text":135,"correct":22},{"key":27,"text":215,"correct":22},{"key":30,"text":217,"correct":22},{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},50056,"一个抹灰小组12人，工作6小时(8小时工作制)，完成抹灰54m2，计算其产量定额为()m2／工日。",[498,499,500,501],{"key":20,"text":111,"correct":22},{"key":24,"text":113,"correct":32},{"key":27,"text":115,"correct":22},{"key":30,"text":117,"correct":22},{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":30,"analysis":33},50058,"以下不属于周转性材料的是()。",[506,508,510,512],{"key":20,"text":507,"correct":22},"模板",{"key":24,"text":509,"correct":22},"脚手架",{"key":27,"text":511,"correct":22},"跳板",{"key":30,"text":513,"correct":32},"零星材料",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},50059,"材料从工地仓库、现场集中堆放地点或现场加工地点至操作地点的水平和垂直运输，所需的费用()。",[518,520,522,524],{"key":20,"text":519,"correct":22},"包括在二次搬运费中",{"key":24,"text":521,"correct":32},"包括在材料消耗定额",{"key":27,"text":523,"correct":22},"按实际发生金额计人工程造价",{"key":30,"text":525,"correct":22},"不能计入工程造价",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":27,"analysis":33},50061,"建筑材料按在生产中的作用可分为主要材料、辅助材料和其他材料。在下列各项材料中，属于主要材料的是()。",[530,532,534,536],{"key":20,"text":531,"correct":22},"石子",{"key":24,"text":533,"correct":22},"燃料",{"key":27,"text":535,"correct":32},"水泥",{"key":30,"text":537,"correct":22},"油料",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},50062,"在工程建设中，某些材料直接构成工程实体，其用量和价值可以具体测量，但占工程材料总量比重较小。这种材料称为（）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"主要材料",{"key":24,"text":545,"correct":32},"辅助材料",{"key":27,"text":547,"correct":22},"周转性材料",{"key":30,"text":513,"correct":22},{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":27,"analysis":33},50064,"下列选项中， ()不是施工图预算的作用。",[553,554,555,556],{"key":20,"text":123,"correct":22},{"key":24,"text":125,"correct":22},{"key":27,"text":127,"correct":32},{"key":30,"text":129,"correct":22},{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":30,"analysis":33},50066,"施工劳动定额中未包括的、而在一般正常施工情况下又不可避免的一些零星用工称为()。",[561,562,563,565],{"key":20,"text":356,"correct":22},{"key":24,"text":358,"correct":22},{"key":27,"text":564,"correct":22},"辅助用工",{"key":30,"text":362,"correct":32},{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":20,"analysis":33},50067,"预算定额人工消耗量中的超运距，指的是()。",[570,572,574,576],{"key":20,"text":571,"correct":32},"预算定额规定运距-劳动定额规定运距",{"key":24,"text":573,"correct":22},"劳动定额规定运距+场外规定运距",{"key":27,"text":575,"correct":22},"预算定额规定运距+劳动定额规定运距",{"key":30,"text":577,"correct":22},"劳动定额规定运距-场外规定运距",[579,582,585,588,591,593],{"id":580,"name":581,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":583,"name":584,"category":7,"favorite":8},30,"经济师",{"id":586,"name":587,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":589,"name":590,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":592,"category":7,"favorite":8},"(初级)保险专业",{"id":594,"name":595,"category":7,"favorite":8},51,"(初级)财政税收"]