[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":577},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,5,50,2220,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,272,284,296,308,320,331,339,347,355,363,375,387,399,411,422,434,445,457,469,477,489,497,505,513,521,529,541,553,565],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},49807,1,"单选题","工程项目施工可以采用不同的组织方式，其中有利于资源均衡使用的组织方式是（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","依次施工",false,{"key":24,"text":25,"correct":22},"B","平行施工",{"key":27,"text":28,"correct":29},"C","流水施工",true,{"key":31,"text":32,"correct":22},"D","搭接施工","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},49810,"流水施工的工艺参数是指()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"施工段数",{"key":24,"text":41,"correct":22},"搭接长度",{"key":27,"text":43,"correct":29},"施工过程数",{"key":31,"text":45,"correct":22},"技术间歇",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},49812,"在流水施工中，当每个施工过程在各个施工段上的流水节拍不尽相等，可以组织()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"全等节拍流水施工",{"key":24,"text":53,"correct":22},"异步距流水施工",{"key":27,"text":55,"correct":29},"分别流水施工",{"key":31,"text":57,"correct":22},"成倍节拍流水施工",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},49814,"流水作业法是一种组织科学施工的计划方法，其实质是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"依次作业",{"key":24,"text":65,"correct":22},"平行作业",{"key":27,"text":67,"correct":29},"连续作业",{"key":31,"text":69,"correct":22},"控制作业",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},49817,"某4人专业工作队完成一工作量为100的施工段，当每一工日完成的计划产量为5时，其流水节拍为()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"25",{"key":24,"text":77,"correct":22},"20",{"key":27,"text":79,"correct":22},"10",{"key":31,"text":81,"correct":29},"5",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},49819,"建设工程项目的生产过程通常可以采用不同的施工组织方式，其中有利于资源供应的组织方式是()。",[86,88,90,92],{"key":20,"text":87,"correct":29},"依次施工和流水施工",{"key":24,"text":89,"correct":22},"平行施工和流水施工",{"key":27,"text":91,"correct":22},"依次施工和平行施工",{"key":31,"text":93,"correct":22},"平行施工和搭接施工",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},49822,"下列各选项中，()不是成倍节拍流水施工的基本特点。",[98,100,102,104],{"key":20,"text":99,"correct":22},"同一施工过程在各个流水段上的流水节拍均相等",{"key":24,"text":101,"correct":22},"所有施工过程之间的流水步距都相等",{"key":27,"text":103,"correct":22},"各专业工作队能连续施工，施工段上没有空闲",{"key":31,"text":105,"correct":29},"专业工作队数等于施工过程数",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},49824,"某工程项目的装饰工程可以分解为 A、 B、 C、D四个施工过程，施工中分五个施工段组织流水作业，各施工过程的流水节拍均为3天，其中 C、D工作之间有2天技术间歇时间，则其流水施工工期为()天。",[110,112,114,116],{"key":20,"text":111,"correct":22},"22",{"key":24,"text":113,"correct":22},"24",{"key":27,"text":115,"correct":29},"26",{"key":31,"text":117,"correct":22},"28",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},49826,"某工程项目的基础工程可以分解为甲、乙、丙、丁四个施工过程，各施工过程的流水节拍均为3周，分4个施工段组织流水作业，则其流水施工工期是()周。",[122,124,126,128],{"key":20,"text":123,"correct":22},"15",{"key":24,"text":125,"correct":22},"17",{"key":27,"text":127,"correct":22},"19",{"key":31,"text":129,"correct":29},"21",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},49829,"在进行现场实地检查时，进度管理者应确定()。",[134,136,138,140],{"key":20,"text":135,"correct":29},"检查的时间间隔",{"key":24,"text":137,"correct":22},"检查的规模",{"key":27,"text":139,"correct":22},"检查的过程",{"key":31,"text":141,"correct":22},"检查的时间",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},49831,"工程进度计划执行信息的主要来源是()。",[146,148,150,152],{"key":20,"text":147,"correct":29},"进度计划执行情况的跟踪检查",{"key":24,"text":149,"correct":22},"监理工程师的工作指令",{"key":27,"text":151,"correct":22},"项目经理的施工命令",{"key":31,"text":153,"correct":22},"实际进度的数据与计划进度的数据进行比较",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},49833,"工程项目进度计划检查工作的主要内容包括：1实际进度与计划进度的比较；2收集实际进度数据；3数据整理、统计、分析；4建立进度数据采集系统；5进度计划的调整。其正确的开展顺序是（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"1-3-4-2-5",{"key":24,"text":161,"correct":22},"4-3-2-1-5",{"key":27,"text":163,"correct":29},"4-2-3-1-5",{"key":31,"text":165,"correct":22},"2-4-3-1-5",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},49836,"在组织成倍节拍流水施工过程中，流水步距等于()。",[170,172,174,176],{"key":20,"text":171,"correct":22},"各施工过程流水节拍的最大值",{"key":24,"text":173,"correct":22},"各施工过程流水节拍的最小值",{"key":27,"text":175,"correct":22},"各施工过程流水节拍的最小公倍数",{"key":31,"text":177,"correct":29},"各施工过程流水节拍的最大公约数",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},49845,"施工企业质量体系认证的目的是确认企业( )。",[182,184,186,188],{"key":20,"text":183,"correct":22},"在建工程质量的水平",{"key":24,"text":185,"correct":22},"竣工工程质量的水平",{"key":27,"text":187,"correct":22},"提高工程质量的能力",{"key":31,"text":189,"correct":29},"保证工程质量的能力",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},49848,"建设工程质量监督管理，可由建设行政主管部门委托的建设工程( )具体实施。",[194,196,198,200],{"key":20,"text":195,"correct":22},"质量管理机构",{"key":24,"text":197,"correct":22},"质量考核机构",{"key":27,"text":199,"correct":29},"质量监督机构",{"key":31,"text":201,"correct":22},"质量认证机构",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},49850,"工程竣工验收合格后，应由建设单位将有关报告和文件送建设行政主管部门或其他有关部门( )。",[206,208,210,212],{"key":20,"text":207,"correct":22},"审定",{"key":24,"text":209,"correct":22},"核定",{"key":27,"text":211,"correct":22},"审批",{"key":31,"text":213,"correct":29},"备案",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},49852,"质量管理体系的基本运转形式是( )。",[218,220,222,224],{"key":20,"text":219,"correct":22},"目标管理",{"key":24,"text":221,"correct":22},"项目管理",{"key":27,"text":223,"correct":29},"PDCA管理循环",{"key":31,"text":225,"correct":22},"系统管理",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},49854,"质量体系认证由( )。",[230,232,234,236],{"key":20,"text":231,"correct":22},"第一方进行",{"key":24,"text":233,"correct":22},"第二方进行",{"key":27,"text":235,"correct":29},"独立的第三方进行",{"key":31,"text":237,"correct":22},"政府有关部门组织",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},49857,"质量管理的标准化包括( )。",[242,244,246,248],{"key":20,"text":243,"correct":29},"技术工作和管理工作标准化",{"key":24,"text":245,"correct":22},"计划工作和技术工作标准化",{"key":27,"text":247,"correct":22},"组织工作和计划工作标准化",{"key":31,"text":249,"correct":22},"组织工作和管理工作标准化",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},49859,"对建设工程质量具体实施监督管理的机构是( )。",[254,256,258,260],{"key":20,"text":255,"correct":22},"建设行政主管部门或其他有关部门",{"key":24,"text":257,"correct":22},"建设行政主管部门或其他有关部门委托的建设监理单位",{"key":27,"text":259,"correct":29},"建设行政主管部门或其他有关部门委托的质量监督机构",{"key":31,"text":261,"correct":22},"建设单位或建设行政主管部门委托的质量监督机构",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":27,"analysis":33},49861,"建设单位在完成竣工验收后，应在验收合格之日起( )日内，向当地县级以上人民政府建设行政主管部门备案。",[266,268,270,271],{"key":20,"text":267,"correct":22},"7",{"key":24,"text":269,"correct":22},"14",{"key":27,"text":123,"correct":29},{"key":31,"text":117,"correct":22},{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":31,"analysis":33},49863,"工程质量管理的任务是( )。",[276,278,280,282],{"key":20,"text":277,"correct":22},"实现工程项目进度、质量、投资控制目标",{"key":24,"text":279,"correct":22},"以尽可能低的成本完成达到质量标准的工程",{"key":27,"text":281,"correct":22},"不断提高设备质量",{"key":31,"text":283,"correct":29},"建立和健全质量管理体系",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},49865,"下列各项中不属于全面质量管理指导思想的是( )。",[288,290,292,294],{"key":20,"text":289,"correct":22},"“质量第一”是根本出发点",{"key":24,"text":291,"correct":22},"一切用数据说话",{"key":27,"text":293,"correct":22},"处处为用户着想",{"key":31,"text":295,"correct":29},"严格执行进程控制",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":31,"analysis":33},49889,"工程质量中所包含的工作质量是指工程建设参与各方为保证质量所从事的技术、组织工作的水平和()。",[300,302,304,306],{"key":20,"text":301,"correct":22},"能力",{"key":24,"text":303,"correct":22},"效果",{"key":27,"text":305,"correct":22},"实施程度",{"key":31,"text":307,"correct":29},"完善程度",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},49890,"工程质量不仅包括工程实物质量，而且也包含()。",[312,314,316,318],{"key":20,"text":313,"correct":29},"工作质量",{"key":24,"text":315,"correct":22},"管理质量",{"key":27,"text":317,"correct":22},"控制程度",{"key":31,"text":319,"correct":22},"监督检查",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},49892,"建设工程竣工验收合格后，建设单位应将有关资料报建设行政主管部门或者其他管理部门（）。",[324,325,327,329],{"key":20,"text":213,"correct":29},{"key":24,"text":326,"correct":22},"核验",{"key":27,"text":328,"correct":22},"确认",{"key":31,"text":330,"correct":22},"复查",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":27,"analysis":33},49893,"对建设工程质量具体实施监督管理的机构是()。",[335,336,337,338],{"key":20,"text":255,"correct":22},{"key":24,"text":257,"correct":22},{"key":27,"text":259,"correct":29},{"key":31,"text":261,"correct":22},{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":31,"analysis":33},49895,"施工企业质量体系认证的目的是确认企业()。",[343,344,345,346],{"key":20,"text":183,"correct":22},{"key":24,"text":185,"correct":22},{"key":27,"text":187,"correct":22},{"key":31,"text":189,"correct":29},{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":27,"analysis":33},49897,"质量体系认证由()。",[351,352,353,354],{"key":20,"text":231,"correct":22},{"key":24,"text":233,"correct":22},{"key":27,"text":235,"correct":29},{"key":31,"text":237,"correct":22},{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":31,"analysis":33},49898,"工程竣工验收合格后，应由建设单位将有关报告和文件送建设行政主管部门或其他有关部门()。",[359,360,361,362],{"key":20,"text":207,"correct":22},{"key":24,"text":209,"correct":22},{"key":27,"text":211,"correct":22},{"key":31,"text":213,"correct":29},{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":31,"analysis":33},49900,"建筑工程施工质量验收时，应对涉及结构安全和使用功能的重要分部工程进行()。",[367,369,371,373],{"key":20,"text":368,"correct":22},"全面检测",{"key":24,"text":370,"correct":22},"重点检测",{"key":27,"text":372,"correct":22},"全数检测",{"key":31,"text":374,"correct":29},"抽样检测",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":31,"analysis":33},49901,"施工过程中工序质量监控的对象是（）。",[379,381,383,385],{"key":20,"text":380,"correct":22},"工序能力指数",{"key":24,"text":382,"correct":22},"工程审图质量",{"key":27,"text":384,"correct":22},"工程监理活动",{"key":31,"text":386,"correct":29},"质量影响因素",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":27,"analysis":33},49903,"施工过程工序质量监控的对象是该工序的()。",[391,393,395,397],{"key":20,"text":392,"correct":22},"实物质量",{"key":24,"text":394,"correct":22},"质保体系",{"key":27,"text":396,"correct":29},"影响因素",{"key":31,"text":398,"correct":22},"质量记录",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":31,"analysis":33},49904,"施工过程中工序质量检验的目的是（）。",[403,405,407,409],{"key":20,"text":404,"correct":22},"实施工序过程质量监控",{"key":24,"text":406,"correct":22},"判定工序作业方法是否合理",{"key":27,"text":408,"correct":22},"收集工序质量动态信息",{"key":31,"text":410,"correct":29},"决定是否可进行下道工序施工",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":20,"analysis":33},49907,"房屋建筑的单位工程质量验收的组织者是( )。",[415,417,419,421],{"key":20,"text":416,"correct":29},"建设单位",{"key":24,"text":418,"correct":22},"工程监理单位",{"key":27,"text":420,"correct":22},"施工单位",{"key":31,"text":199,"correct":22},{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":20,"analysis":33},49909,"以下所列项目，属于单位工程的是()。",[426,428,430,432],{"key":20,"text":427,"correct":29},"土建工程",{"key":24,"text":429,"correct":22},"混凝土及钢筋混凝土工程",{"key":27,"text":431,"correct":22},"给排水管道工程",{"key":31,"text":433,"correct":22},"通风管道工程",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":27,"analysis":33},49911,"以下所列项目，不属于分部工程的是()。",[438,440,442,443],{"key":20,"text":439,"correct":22},"通风管道",{"key":24,"text":441,"correct":22},"地基工程",{"key":27,"text":427,"correct":29},{"key":31,"text":444,"correct":22},"给排水管道",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":24,"analysis":33},49914,"影响工程质量的因素不包括()。",[449,451,453,455],{"key":20,"text":450,"correct":22},"人的因素",{"key":24,"text":452,"correct":29},"时间的因素",{"key":27,"text":454,"correct":22},"材料的因素",{"key":31,"text":456,"correct":22},"环境的因素",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":31,"analysis":33},49915,"工程质量是对建设工程( )的要求。",[461,463,465,467],{"key":20,"text":462,"correct":22},"结构安全",{"key":24,"text":464,"correct":22},"使用功能",{"key":27,"text":466,"correct":22},"节能效果",{"key":31,"text":468,"correct":29},"综合特性",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":27,"analysis":33},49917,"建设单位在完成竣工验收后，应在验收合格之日起()日内，向当地县级以上人民政府建设行政主管部门备案。",[473,474,475,476],{"key":20,"text":267,"correct":22},{"key":24,"text":269,"correct":22},{"key":27,"text":123,"correct":29},{"key":31,"text":117,"correct":22},{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":27,"analysis":33},49918,"关于涉及结构安全和重要使用功能的试块、试件的检测报告的说法，正确的是( )。",[481,483,485,487],{"key":20,"text":482,"correct":22},"由企业内部通过认证的质量检测部门编制",{"key":24,"text":484,"correct":22},"由企业内部的质量检测部门编制",{"key":27,"text":486,"correct":29},"由有法定资质的第三方质量检测单位出具",{"key":31,"text":488,"correct":22},"由施工单位委托的第三方质量检测单位出具",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":27,"analysis":33},49920,"建设工程质量监督管理，可由建设行政主管部门委托的建设工程()具体实施。",[493,494,495,496],{"key":20,"text":195,"correct":22},{"key":24,"text":197,"correct":22},{"key":27,"text":199,"correct":29},{"key":31,"text":201,"correct":22},{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":27,"analysis":33},49921,"质量管理体系的基本运转形式是()。",[501,502,503,504],{"key":20,"text":219,"correct":22},{"key":24,"text":221,"correct":22},{"key":27,"text":223,"correct":29},{"key":31,"text":225,"correct":22},{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":20,"analysis":33},49923,"质量管理的标准化包括()。",[509,510,511,512],{"key":20,"text":243,"correct":29},{"key":24,"text":245,"correct":22},{"key":27,"text":247,"correct":22},{"key":31,"text":249,"correct":22},{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":31,"analysis":33},49924,"下列各项中不属于全面质量管理指导思想的是()。",[517,518,519,520],{"key":20,"text":289,"correct":22},{"key":24,"text":291,"correct":22},{"key":27,"text":293,"correct":22},{"key":31,"text":295,"correct":29},{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":31,"analysis":33},49926,"工程质量管理的任务是()。",[525,526,527,528],{"key":20,"text":277,"correct":22},{"key":24,"text":279,"correct":22},{"key":27,"text":281,"correct":22},{"key":31,"text":283,"correct":29},{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":31,"analysis":33},49928,"工程设计单位可以指定()的建筑材料供应商。",[533,535,537,539],{"key":20,"text":534,"correct":22},"工程结构部位",{"key":24,"text":536,"correct":22},"工程重要部位",{"key":27,"text":538,"correct":22},"有环保要求",{"key":31,"text":540,"correct":29},"有特殊要求",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":27,"analysis":33},49929,"下列关于总承包单位与分包单位所承担的建设工程质量责任的说法中，正确的是()。",[545,547,549,551],{"key":20,"text":546,"correct":22},"总承包单位对其工程质量承担主要责任",{"key":24,"text":548,"correct":22},"总承包单位对其工程质量不承担责任",{"key":27,"text":550,"correct":29},"分包单位对其分包工程质量向总承包单位负责",{"key":31,"text":552,"correct":22},"分包单位对其分包工程质量向建设单位负责",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},49931,"对涉及结构安全的试块、试件及有关材料进行现场取样时监督见证的单位是()。",[557,559,561,563],{"key":20,"text":558,"correct":29},"建设单位或工程监理单位",{"key":24,"text":560,"correct":22},"设计单位或工程施工单位",{"key":27,"text":562,"correct":22},"工程监理单位或设计单位",{"key":31,"text":564,"correct":22},"质量监督机构或检测机构",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":27,"analysis":33},49932,"对依法分包的专业工程质量，总承包单位应承担（）责任。",[569,571,573,575],{"key":20,"text":570,"correct":22},"次要",{"key":24,"text":572,"correct":22},"相关",{"key":27,"text":574,"correct":29},"连带",{"key":31,"text":576,"correct":22},"主要",[578,581,584,587,590,592],{"id":579,"name":580,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":582,"name":583,"category":7,"favorite":8},30,"经济师",{"id":585,"name":586,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":588,"name":589,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":591,"category":7,"favorite":8},"(初级)保险专业",{"id":593,"name":594,"category":7,"favorite":8},51,"(初级)财政税收"]