[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,4,50,2220,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,297,309,321,333,345,354,365,374,386,398,410,422,434,446,457,465,477,489,501,513,525,537,549,561,569,577,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},49622,1,"单选题","施工项目具有的特征不包括()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","任务的多次性",true,{"key":24,"text":25,"correct":26},"B","费用目标的明确性",false,{"key":28,"text":29,"correct":26},"C","任务的一次性",{"key":31,"text":32,"correct":26},"D","管理对象的整体性","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},49624,"除项目建议书外，建设项目投资决策各阶段所形成的成果有()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"可行性研究报告",{"key":24,"text":41,"correct":26},"建设项目选址意见书",{"key":28,"text":43,"correct":26},"规划设计要求",{"key":31,"text":45,"correct":26},"设计任务书",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},49627,"关于项目建议书和可行性研究报告的说法，正确的是（ ）",[50,52,54,56],{"key":20,"text":51,"correct":26},"项目建议书经有关部门批准，就标志着建设项目的建立",{"key":24,"text":53,"correct":22},"项目建议书经审核批准后，业主可组织进行项目可行性研究",{"key":28,"text":55,"correct":26},"项目建议书主要围绕项目的可行性研究报告进行分析研究",{"key":31,"text":57,"correct":26},"可行性研究报告主要围绕项目的必要性进行分析研究",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},49629,"项目决策阶段管理工作的主要任务是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"确定项目的定义",{"key":24,"text":65,"correct":26},"设计前准备工作",{"key":28,"text":67,"correct":26},"机会研究",{"key":31,"text":69,"correct":26},"项目策划",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},49631,"()是项目建设的最后一个程序。",[74,76,78,80],{"key":20,"text":75,"correct":26},"建设项目质量控制",{"key":24,"text":77,"correct":26},"可行性研究",{"key":28,"text":79,"correct":26},"投资效益评价",{"key":31,"text":81,"correct":22},"建设项目竣工验收",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},49634,"工程竣工验收合格后，提交工程竣工验收报告并向竣工备案部门备案的单位是()。",[86,88,90,92],{"key":20,"text":87,"correct":26},"工程质量监督单位",{"key":24,"text":89,"correct":26},"施工单位",{"key":28,"text":91,"correct":22},"建设单位",{"key":31,"text":93,"correct":26},"设计单位",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},49636,"申请建筑施工许可证报送资料包括()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"质量、安全监督手续",{"key":24,"text":101,"correct":26},"复验灰线报告",{"key":28,"text":103,"correct":26},"工程档案认可文件",{"key":31,"text":105,"correct":26},"开工报告",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},49638,"在国际上，将()对项目进行的管理，称为项目开发管理。",[110,112,114,116],{"key":20,"text":111,"correct":26},"项目设计阶段",{"key":24,"text":113,"correct":26},"项目申请阶段",{"key":28,"text":115,"correct":22},"项目决策阶段",{"key":31,"text":117,"correct":26},"项目实施阶段",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},49641,"任务的一次性是项目的最主要特征，也可称为()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"单件性",{"key":24,"text":125,"correct":26},"复杂性",{"key":28,"text":127,"correct":26},"明确性",{"key":31,"text":129,"correct":26},"整体性",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},49643,"供货方的项目管理工作主要在()阶段。",[134,136,138,140],{"key":20,"text":135,"correct":26},"设计前准备",{"key":24,"text":137,"correct":22},"施工",{"key":28,"text":139,"correct":26},"设计",{"key":31,"text":141,"correct":26},"动用前准备",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},49645,"建设项目的动用验收是指（）验收。",[146,148,150,152],{"key":20,"text":147,"correct":26},"分部工程",{"key":24,"text":149,"correct":26},"分项工程",{"key":28,"text":151,"correct":26},"隐蔽工程",{"key":31,"text":153,"correct":22},"工程整体",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},49648,"项目管理门户指的是()。",[158,160,162,164],{"key":20,"text":159,"correct":26},"建设项目全寿命周期各阶段信息的传递软件",{"key":24,"text":161,"correct":26},"基于网络的项目采购管理软件",{"key":28,"text":163,"correct":26},"虚拟组织的设定和调整软件",{"key":31,"text":165,"correct":22},"在网络基础上对项目信息进行集中存储和管理的系统运行软件",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},49650,"目前，工程项目管理信息化的主要发展趋势是（）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"项目管理信息系统",{"key":24,"text":173,"correct":26},"基于计算机的项目管理",{"key":28,"text":175,"correct":26},"项目管理信息编码",{"key":31,"text":177,"correct":22},"基于网络的项目管理",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},49659,"与横道图相比，网络图不具有的特点是( )。",[182,184,186,188],{"key":20,"text":183,"correct":26},"能清楚地表达工作之间相互联系、相互制约的关系",{"key":24,"text":185,"correct":26},"能够用计算机技术及相关软件进行进度控制",{"key":28,"text":187,"correct":26},"能找出进度计划中的关键工作和关键线路",{"key":31,"text":189,"correct":22},"形象直观、编制简单",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},49685,"流水施工的工艺参数是指( )。",[194,196,198,200],{"key":20,"text":195,"correct":26},"施工段数",{"key":24,"text":197,"correct":26},"搭接长度",{"key":28,"text":199,"correct":22},"施工过程数",{"key":31,"text":201,"correct":26},"技术间歇",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},49704,"组织分别流水施工的关键是( )。",[206,208,210,212],{"key":20,"text":207,"correct":26},"确定流水节拍",{"key":24,"text":209,"correct":26},"确定技术间歇时间",{"key":28,"text":211,"correct":22},"确定相邻两个专业工作队之间的流水步距",{"key":31,"text":213,"correct":26},"确定流水施工工期",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},49725,"某工程组织流水施工，如果其施工过程之间存在技术间歇和平行搭接时间，则对工期的影响是( )。",[218,220,222,224],{"key":20,"text":219,"correct":22},"间歇时间会使流水施工工期延长，而搭接时间会使流水施工工期缩短",{"key":24,"text":221,"correct":26},"间歇时间会使流水施工工期缩短，而搭接时间会使流水施工工期延长",{"key":28,"text":223,"correct":26},"无论是间歇时间还是搭接时间，均会使流水施工工期延长",{"key":31,"text":225,"correct":26},"无论是间歇时间还是搭接时间，均会使流水施工工期缩短",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},49729,"工程进度计划执行信息的主要来源是( )。",[230,232,234,236],{"key":20,"text":231,"correct":22},"进度计划执行情况的跟踪检查",{"key":24,"text":233,"correct":26},"监理工程师的工作指令",{"key":28,"text":235,"correct":26},"项目经理的施工命令",{"key":31,"text":237,"correct":26},"实际进度的数据与计划进度的数据进行比较",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},49732,"下列各项措施中，属于工程进度管理的合同措施的是()。",[242,244,246,248],{"key":20,"text":243,"correct":22},"推行CM承发包模式",{"key":24,"text":245,"correct":26},"建立工期超前或延误的奖惩制度",{"key":28,"text":247,"correct":26},"及时办理工程进度款支付手续",{"key":31,"text":249,"correct":26},"建立进度信息收集和报告制度",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":33},49734,"下列有关工程进度管理说法，正确的是()。",[254,256,258,260],{"key":20,"text":255,"correct":26},"进行工程进度管理的目的是使工程建设周期最短",{"key":24,"text":257,"correct":26},"通过工程进度管理可使工程总投资最省",{"key":28,"text":259,"correct":22},"工程进度管理的目的是确保工程进度总目标的实现",{"key":31,"text":261,"correct":26},"通过进度管理可使工程项目的各项目标均达到最优",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},49736,"编制工程项目进度计划的工作包括：①确定进度目标；②确定工作持续时间；③划分工作过程；④编制初始进度计划；⑤检查是否满足要求；⑥计算各工作工程量；⑦进度计划调整、优化；⑧编制正式进度计划，上述各工作正确的步骤是()。",[266,268,270,272],{"key":20,"text":267,"correct":26},"①一②一③一④一⑤一⑥一⑦一⑧",{"key":24,"text":269,"correct":22},"①一③一⑥一②一④一⑤一⑦一⑧",{"key":28,"text":271,"correct":26},"①一⑥一②一③一④一⑤一⑦一⑧",{"key":31,"text":273,"correct":26},"①一③一②一⑥一④一⑤一⑦一⑧",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},49739,"采用横道图编制工程进度计划的不足是()。",[278,280,282,284],{"key":20,"text":279,"correct":26},"编制较为复杂、繁琐",{"key":24,"text":281,"correct":26},"由于人们不太熟悉，所以在进度管理中不常用",{"key":28,"text":283,"correct":26},"计算劳动力和资源消耗量较为困难",{"key":31,"text":285,"correct":22},"不能反映工作之间相互联系、相互制约的关系",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},49741,"关于工程进度管理的说法，正确的是（ ）。",[290,292,294,295],{"key":20,"text":291,"correct":26},"工程进度管理的目的是使工程总成本最低",{"key":24,"text":293,"correct":26},"工程进度管理的目的是使工程建设周期最短",{"key":28,"text":261,"correct":26},{"key":31,"text":296,"correct":22},"工程进度管理的目的是确保项目工期目标的实现",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":31,"analysis":33},49744,"工程项目前期工作计划的编制是在()进行的。",[301,303,305,307],{"key":20,"text":302,"correct":26},"项目的初步设计被批准后",{"key":24,"text":304,"correct":26},"编制项目设计任务书的同时",{"key":28,"text":306,"correct":26},"项目的可行性研究被批准后",{"key":31,"text":308,"correct":22},"项目预测的基础上",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},49746,"横道图是最常用的工程进度计划表示方法，其主要特点是（）。",[313,315,317,319],{"key":20,"text":314,"correct":26},"能清楚地表达工作直接相互联系和相互制约的关系",{"key":24,"text":316,"correct":22},"形象直观、编制简单、使用方便",{"key":28,"text":318,"correct":26},"易于找出影响工程进度的关键工作和关键线路",{"key":31,"text":320,"correct":26},"能计算各种时间参数",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},49748,"组织一项成倍节拍流水施工，各施工过程的流水节拍分别为t1=2天，t2=4天，t3=6天，则第2个施工过程的专业工作队数为()队。",[325,327,329,331],{"key":20,"text":326,"correct":26},"1",{"key":24,"text":328,"correct":26},"3",{"key":28,"text":330,"correct":22},"2",{"key":31,"text":332,"correct":26},"4",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":20,"analysis":33},49751,"下列各选项中，()不是依次施工组织方式的特点。",[337,339,341,343],{"key":20,"text":338,"correct":22},"施工现场组织管理比较复杂",{"key":24,"text":340,"correct":26},"单位时间内投入的资源量较少",{"key":28,"text":342,"correct":26},"没有充分利用工作面，工期拖得较长",{"key":31,"text":344,"correct":26},"各专业工作队的工人和专业工人出现间歇，不能连续生产作业",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":28,"analysis":33},49753,"下列参数中，属于流水施工空间参数的是()。",[349,351,352,353],{"key":20,"text":350,"correct":26},"流水强度",{"key":24,"text":201,"correct":26},{"key":28,"text":195,"correct":22},{"key":31,"text":199,"correct":26},{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},49755,"某专业工作队在一个施工段上完成一个施工过程的持续时间称为()。",[358,360,362,363],{"key":20,"text":359,"correct":26},"流水步距",{"key":24,"text":361,"correct":22},"流水节拍",{"key":28,"text":201,"correct":26},{"key":31,"text":364,"correct":26},"搭接间距",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":28,"analysis":33},49758,"某分部工程可划分为甲、乙、丙三个施工过程，其流水节拍分别为6周、12周和9周，若组织成倍节拍流水施工，其流水步距是()周。",[369,370,371,372],{"key":20,"text":326,"correct":26},{"key":24,"text":330,"correct":26},{"key":28,"text":328,"correct":22},{"key":31,"text":373,"correct":26},"6",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":28,"analysis":33},49760,"某分部工程划分为甲、乙、丙三个施工过程，各施工过程的流水节拍分别为6周、8周和4周。若分为6个流水施工段组织成倍节拍流水施工，则其专业工作队总数和流水施工工期分别为（）。",[378,380,382,384],{"key":20,"text":379,"correct":26},"3队和18周",{"key":24,"text":381,"correct":26},"6队和24周",{"key":28,"text":383,"correct":22},"9队和28周",{"key":31,"text":385,"correct":26},"9队和34周",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":31,"analysis":33},49762,"某工程项目划分为 A、 B、C三个施工过程，各施工过程的流水节拍均为5天。若施工时分为四个施工段组织流水作业，且 B、C施工过程之间有3天技术间歇时间，则其流水施工工期为（）天。",[390,392,394,396],{"key":20,"text":391,"correct":26},"18",{"key":24,"text":393,"correct":26},"23",{"key":28,"text":395,"correct":26},"30",{"key":31,"text":397,"correct":22},"33",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},49765,"最普遍的流水施工组织形式为()。",[402,404,406,408],{"key":20,"text":403,"correct":26},"全等节拍流水施工",{"key":24,"text":405,"correct":22},"分别流水施工",{"key":28,"text":407,"correct":26},"成倍节拍流水施工",{"key":31,"text":409,"correct":26},"特定节拍流水施工",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":24,"analysis":33},49767,"流水施工中的流水步距是指()。",[414,416,418,420],{"key":20,"text":415,"correct":26},"某专业队进入各个施工段流水作业的持续时间",{"key":24,"text":417,"correct":22},"两个相邻专业队相继进入施工现场开始工作的最小时间间隔",{"key":28,"text":419,"correct":26},"两个相邻专业队进入施工现场流水作业的时间间歇",{"key":31,"text":421,"correct":26},"两个相邻专业队进入同一个施工段流水作业的搭接时间",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":28,"analysis":33},49769,"全等节拍和成倍节拍流水施工组织的第一项工作是()。",[426,428,430,432],{"key":20,"text":427,"correct":26},"确定施工起点流向，划分施工段",{"key":24,"text":429,"correct":26},"确定流水步距",{"key":28,"text":431,"correct":22},"分解施工过程，确定施工顺序",{"key":31,"text":433,"correct":26},"确定各施工过程的流水节拍数值",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":28,"analysis":33},49772,"某现浇钢筋混凝土工程，由绑扎钢筋、安装模板和浇混凝土三个施工过程组成，其对应流水节拍分别为6周、12周和9周。若组织成倍节拍流水施工，其流水步距和专业工作队总数分别应为()。",[438,440,442,444],{"key":20,"text":439,"correct":26},"3周和3个",{"key":24,"text":441,"correct":26},"6周和3个",{"key":28,"text":443,"correct":22},"3周和9个",{"key":31,"text":445,"correct":26},"6周和9个",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":28,"analysis":33},49774,"流水施工中的工艺参数是指参与流水施工的()数目。",[450,451,453,455],{"key":20,"text":137,"correct":26},{"key":24,"text":452,"correct":26},"施工层",{"key":28,"text":454,"correct":22},"施工过程",{"key":31,"text":456,"correct":26},"工作队",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":20,"analysis":33},49776,"某工程组织流水施工，如果其施工过程之间存在技术间歇和平行搭接时间，则对工期的影响是()。",[461,462,463,464],{"key":20,"text":219,"correct":22},{"key":24,"text":221,"correct":26},{"key":28,"text":223,"correct":26},{"key":31,"text":225,"correct":26},{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":31,"analysis":33},49779,"某分部工程有两个施工过程，其流水节拍分别为3、4、3、3天和2、5、4、3天，若该分部工程分为4个施工段组织流水作业，则其流水步距和流水施工工期分别为()天。",[469,471,473,475],{"key":20,"text":470,"correct":26},"3和16",{"key":24,"text":472,"correct":26},"3和17",{"key":28,"text":474,"correct":26},"5和18",{"key":31,"text":476,"correct":22},"5和19",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":24,"analysis":33},49781,"流水作业方法是建立在()基础上的。",[481,483,485,487],{"key":20,"text":482,"correct":26},"单独生产",{"key":24,"text":484,"correct":22},"分工协作",{"key":28,"text":486,"correct":26},"手工操作",{"key":31,"text":488,"correct":26},"小批量生产",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":28,"analysis":33},49783,"某分部工程可划分为 A、 B、C三个施工过程，其流水节拍分别为8天、12天和4天。若组织成倍节拍流水施工，其流水步距和专业工作队总数应分别是()。",[493,495,497,499],{"key":20,"text":494,"correct":26},"2天和3个",{"key":24,"text":496,"correct":26},"4天和3个",{"key":28,"text":498,"correct":22},"4天和6个",{"key":31,"text":500,"correct":26},"2天和12个",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},49786,"下列有关分别流水施工的说法中，正确的是()。",[505,507,509,511],{"key":20,"text":506,"correct":26},"组织分别流水施工时各个施工段上均无空闲",{"key":24,"text":508,"correct":22},"确定各施工过程相邻两个专业工作队之间的流水步距是组织分别流水施工的关键步骤",{"key":28,"text":510,"correct":26},"相邻施工过程之间的流水步距为常数",{"key":31,"text":512,"correct":26},"流水节拍较长的施工过程需要组织多个专业队伍",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":28,"analysis":33},49788,"某工程项目基础工程和主体工程均可分为三段组织流水作业，其流水节拍分别为3周、3周、4周和2周、3周、3周，则该两分部工程之间的流水步距及其流水施工工期分别是()。",[517,519,521,523],{"key":20,"text":518,"correct":26},"3周和11周",{"key":24,"text":520,"correct":26},"3周和18周",{"key":28,"text":522,"correct":22},"5周和13周",{"key":31,"text":524,"correct":26},"5周和15周",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},49791,"工程进度管理的主要环节是工程进度计划的()。",[529,531,533,535],{"key":20,"text":530,"correct":26},"编制和优化",{"key":24,"text":532,"correct":22},"编制和实施控制",{"key":28,"text":534,"correct":26},"实施和检查",{"key":31,"text":536,"correct":26},"检查和纠偏",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":28,"analysis":33},49793,"收集工程实际进度的有关数据、资料，经加工整理后与计划进度进行比较，提供进度比较分析报告，这是进度管理措施中的()。",[541,543,545,547],{"key":20,"text":542,"correct":26},"组织措施",{"key":24,"text":544,"correct":26},"技术措施",{"key":28,"text":546,"correct":22},"信息管理措施",{"key":31,"text":548,"correct":26},"经济措施",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":28,"analysis":33},49795,"为确保建设工程进度控制目标的实现，必须认真制定进度管理的有关措施。下列各项进度管理措施中，属于技术措施的是（）。",[553,555,557,559],{"key":20,"text":554,"correct":26},"编制进度计划和进度控制的工作流程",{"key":24,"text":556,"correct":26},"对应急赶工给予相应的赶工费用补偿",{"key":28,"text":558,"correct":22},"选择对实现进度目标有利的设计方案",{"key":31,"text":560,"correct":26},"推行CM承发包模式，并协调合同工期与进度计划之间的关系",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":31,"analysis":33},49798,"与横道图相比，网络图不具有的特点是()。",[565,566,567,568],{"key":20,"text":183,"correct":26},{"key":24,"text":185,"correct":26},{"key":28,"text":187,"correct":26},{"key":31,"text":189,"correct":22},{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":28,"analysis":33},49800,"组织分别流水施工的关键是()。",[573,574,575,576],{"key":20,"text":207,"correct":26},{"key":24,"text":209,"correct":26},{"key":28,"text":211,"correct":22},{"key":31,"text":213,"correct":26},{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":24,"analysis":33},49803,"组织流水施工可以节省工作时间，其所用的手段是()。",[581,583,585,587],{"key":20,"text":582,"correct":26},"连续施工",{"key":24,"text":584,"correct":22},"搭接施工",{"key":28,"text":586,"correct":26},"依次施工",{"key":31,"text":588,"correct":26},"动态施工",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":24,"analysis":33},49805,"某工程项目基础工程和主体工程均可分为四段组织流水作业，其流水节拍分别为3、4、3、2周和4、2、4、3周，则两分部工程之间的流水步距及其流水施工工期为()。",[593,595,597,599],{"key":20,"text":594,"correct":26},"4周和13周",{"key":24,"text":596,"correct":22},"4周和17周",{"key":28,"text":598,"correct":26},"3周和16周",{"key":31,"text":600,"correct":26},"3周和25周",[602,605,608,611,614,616],{"id":603,"name":604,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":606,"name":607,"category":7,"favorite":8},30,"经济师",{"id":609,"name":610,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":612,"name":613,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":615,"category":7,"favorite":8},"(初级)保险专业",{"id":617,"name":618,"category":7,"favorite":8},51,"(初级)财政税收"]