[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-39":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":718},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,39,50,2220,[13,35,48,64,76,91,105,120,134,145,158,171,186,198,213,228,243,257,272,286,300,315,329,344,358,370,384,399,413,428,442,457,472,486,500,514,528,542,556,571,585,599,613,626,638,652,666,680,692,704],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":33,"analysis":34},52246,2,"多选题","工程建设定额的作用有( )。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","定额是编制工程计划，组织和管理施工的重要依据",true,{"key":24,"text":25,"correct":22},"B","定额是确定建筑产品成本和造价的依据",{"key":27,"text":28,"correct":22},"C","定额是加强企业管理的重要工具",{"key":30,"text":31,"correct":32},"D","定额是安全检查和验收的依据",false,"ABC","",{"id":36,"libraryId":5,"type":15,"typeLabel":16,"stem":37,"options":38,"answer":47,"analysis":34},52247,"按生产要素工程建设定额可分为( )。",[39,41,43,45],{"key":20,"text":40,"correct":32},"施工定额",{"key":24,"text":42,"correct":22},"劳动消耗定额",{"key":27,"text":44,"correct":32},"水利工程定额",{"key":30,"text":46,"correct":22},"材料消耗定额","BD",{"id":49,"libraryId":5,"type":15,"typeLabel":16,"stem":50,"options":51,"answer":63,"analysis":34},52248,"与周转性材料消耗有关的因素包括( )。",[52,54,56,58,60],{"key":20,"text":53,"correct":22},"材料一次使用量",{"key":24,"text":55,"correct":22},"材料周转次数",{"key":27,"text":57,"correct":22},"材料周转使用量",{"key":30,"text":59,"correct":22},"周转材料残值回收量",{"key":61,"text":62,"correct":32},"E","材料消耗量","ABCD",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":47,"analysis":34},52249,"下列各计量单位中，属于产量定额计量单位的为( )。",[68,70,72,74],{"key":20,"text":69,"correct":32},"工日／m2",{"key":24,"text":71,"correct":22},"m2／工",{"key":27,"text":73,"correct":32},"工日／kg",{"key":30,"text":75,"correct":22},"m／工日",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":90,"analysis":34},52250,"下列建筑物的组成部分或构造措施中，应按其外墙勒脚以上结构外围水平面积、外墙上口外边线所围水平面积或水平投影面积的1／2计算建筑面积的有( )。",[80,82,84,86,88],{"key":20,"text":81,"correct":22},"高度不足2.20m的单层建筑物",{"key":24,"text":83,"correct":22},"层高不足2.20m的半地下室",{"key":27,"text":85,"correct":32},"建筑物内的变形缝",{"key":30,"text":87,"correct":32},"建筑物通道",{"key":61,"text":89,"correct":22},"建筑物的阳台","ABE",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":104,"analysis":34},52251,"下列定额中，属于按编制程序和用途分类的有（ ）。",[95,97,98,100,102],{"key":20,"text":96,"correct":32},"国家定额",{"key":24,"text":40,"correct":22},{"key":27,"text":99,"correct":22},"预算定额",{"key":30,"text":101,"correct":32},"建筑工程定额",{"key":61,"text":103,"correct":32},"设备安装工程定额","BC",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":119,"analysis":34},52252,"人工幅度差公式中包含( )。",[109,111,113,115,117],{"key":20,"text":110,"correct":22},"基本用工",{"key":24,"text":112,"correct":22},"辅助用工",{"key":27,"text":114,"correct":22},"超运距用工",{"key":30,"text":116,"correct":32},"其他用工",{"key":61,"text":118,"correct":22},"人工幅度差系数","ABCE",{"id":121,"libraryId":5,"type":15,"typeLabel":16,"stem":122,"options":123,"answer":90,"analysis":34},52253,"编制定额应简明适用，是指( )。",[124,126,128,130,132],{"key":20,"text":125,"correct":22},"项目齐全，便于使用",{"key":24,"text":127,"correct":22},"粗细适度，步距大小适当",{"key":27,"text":129,"correct":32},"技术工艺先进",{"key":30,"text":131,"correct":32},"组织合理",{"key":61,"text":133,"correct":22},"计算方法简便，易于掌握",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":144,"analysis":34},52254,"定额按生产要素分类，可分为( )。",[138,139,140,141,142],{"key":20,"text":99,"correct":32},{"key":24,"text":40,"correct":32},{"key":27,"text":46,"correct":22},{"key":30,"text":42,"correct":22},{"key":61,"text":143,"correct":22},"机械台班消耗定额","CDE",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":104,"analysis":34},52255,"劳动定额的表现形式有( )。",[149,151,153,155,156],{"key":20,"text":150,"correct":32},"概算指标",{"key":24,"text":152,"correct":22},"时间定额",{"key":27,"text":154,"correct":22},"产量定额",{"key":30,"text":99,"correct":32},{"key":61,"text":157,"correct":32},"概算定额",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":170,"analysis":34},52256,"一塔式起重机吊装楼板至三层，每次吊装1块。每次吊装的各组成部分延续时间如下：挂钩时的停车50秒，将楼板送至12米高度35秒，起重机回转悬臂40秒，将楼板放于安装地点30秒，摘钩时的停车50秒，回转悬臂放下吊索以便再次提升65秒，总计270秒。该机械在8小时工作班内纯工作6.5小时。 根据以上资料，回答62-65题： 该起重机的施工机械台班消耗定额的形式为( )。",[162,164,166,168],{"key":20,"text":163,"correct":22},"施工机械时间定额",{"key":24,"text":165,"correct":22},"施工机械产量定额",{"key":27,"text":167,"correct":32},"施工机械费用定额",{"key":30,"text":169,"correct":32},"施工机械工具. 器具定额","AB",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":34},52257,"下列建筑物的组成部分中，属于不计算建筑面积范围的有( )。",[175,177,179,181,183],{"key":20,"text":176,"correct":32},"建筑物的外墙外侧保温层",{"key":24,"text":178,"correct":22},"屋顶水箱",{"key":27,"text":180,"correct":22},"自动扶梯",{"key":30,"text":182,"correct":22},"独立烟囱",{"key":61,"text":184,"correct":32},"建筑物内的管道井","BCD",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":33,"analysis":34},52258,"常用的劳动定额的测定方法包括( )。",[190,192,194,196],{"key":20,"text":191,"correct":22},"类推比较法",{"key":24,"text":193,"correct":22},"经验估计法",{"key":27,"text":195,"correct":22},"统计分析法",{"key":30,"text":197,"correct":32},"成本分析法",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":212,"analysis":34},52259,"工人工作时间中所必须消耗的时间有( )时间。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"休息",{"key":24,"text":205,"correct":32},"施工本身造成的停工",{"key":27,"text":207,"correct":32},"停工",{"key":30,"text":209,"correct":22},"有效工作时间",{"key":61,"text":211,"correct":22},"不可避免中断","ADE",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":34},52260,"下列人工消耗量中，属于人工幅度差用工的有( )。",[217,219,221,223,225],{"key":20,"text":218,"correct":32},"砌筑墙体工程的砌砖用工量",{"key":24,"text":220,"correct":32},"筛砂子的用工量",{"key":27,"text":222,"correct":22},"隐蔽工程验收影响的操作时间",{"key":30,"text":224,"correct":22},"土建工程与安装工程的交叉中不可避免的停歇时间",{"key":61,"text":226,"correct":32},"砌筑墙体工程的交叉中不可避免的停歇时间","CD",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":242,"analysis":34},52261,"下列工人工作时间中，属于有效工作时间的有（ ）。",[232,234,236,238,240],{"key":20,"text":233,"correct":32},"休息时间",{"key":24,"text":235,"correct":22},"基本工作时间",{"key":27,"text":237,"correct":22},"准备与结束工作时间",{"key":30,"text":239,"correct":32},"停工时间",{"key":61,"text":241,"correct":22},"辅助工作时间","BCE",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":90,"analysis":34},52262,"施工定额由( )相对独立的部分组成。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"劳动定额",{"key":24,"text":250,"correct":22},"机械定额",{"key":27,"text":252,"correct":32},"取费定额",{"key":30,"text":254,"correct":32},"工器具定额",{"key":61,"text":256,"correct":22},"材料定额",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":34},52263,"按建筑自然层计算建筑面积的有( )。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"室内楼梯间",{"key":24,"text":264,"correct":22},"电梯井",{"key":27,"text":266,"correct":32},"烟道",{"key":30,"text":268,"correct":22},"垃圾道",{"key":61,"text":270,"correct":22},"管道井","ABDE",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":119,"analysis":34},52264,"下列各项属于工程建设定额特点的有( )。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"科学性",{"key":24,"text":279,"correct":22},"时效性",{"key":27,"text":281,"correct":22},"稳定性",{"key":30,"text":283,"correct":32},"多变性",{"key":61,"text":285,"correct":22},"系统性",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":185,"analysis":34},52265,"工程量清单的主要组成部分有( )。",[290,292,294,296,298],{"key":20,"text":291,"correct":32},"分部分项工程量清单计价表",{"key":24,"text":293,"correct":22},"分部分项工程量清单",{"key":27,"text":295,"correct":22},"措施项目清单",{"key":30,"text":297,"correct":22},"其他项目清单",{"key":61,"text":299,"correct":32},"计算规则",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":314,"analysis":34},52266,"下列关于工程价款的调整,说法正确的是( )。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"招标工程在投标截止日前28天之后因国家法律. 法规发生变化影响到工程造价的，应按规定调整合同价款。",{"key":24,"text":307,"correct":32},"若施工图纸与工程量清单项目特征描述不符，应按工程量清单项目特征确定的综合单价结算",{"key":27,"text":309,"correct":32},"因不可抗力事件导致的第三方人员伤亡，由承包人承担责任",{"key":30,"text":311,"correct":32},"因不可抗力事件导致的施工现场清理费用，由承包人承担",{"key":61,"text":313,"correct":22},"若施工期内市场价格波动超出一定幅度时，应按合同约定调整工程价款","AE",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":63,"analysis":34},52267,"分部分项工程量清单包括( )。",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"项目编码",{"key":24,"text":322,"correct":22},"项目名称",{"key":27,"text":324,"correct":22},"计量单位",{"key":30,"text":326,"correct":22},"工程计量",{"key":61,"text":328,"correct":32},"工程量计算规则",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":343,"analysis":34},52268,"下列各项费用中，属于规费项目清单内容的有( )。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"工程排污费",{"key":24,"text":336,"correct":32},"总承包服务费",{"key":27,"text":338,"correct":22},"社会保障费",{"key":30,"text":340,"correct":32},"教育费附加",{"key":61,"text":342,"correct":32},"工程定额测定费","AC",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":271,"analysis":34},52269,"下列属于工程成本分析的原则的是（）。",[348,350,352,354,356],{"key":20,"text":349,"correct":22},"坚持实事求是",{"key":24,"text":351,"correct":22},"辩证分析问题",{"key":27,"text":353,"correct":32},"从局部着眼",{"key":30,"text":355,"correct":22},"注重实效",{"key":61,"text":357,"correct":22},"注意分析资料的可比性",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":343,"analysis":34},52270,"本案例中所使用的工程成本分析方法为（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"对比分析法",{"key":24,"text":365,"correct":32},"平衡分析法",{"key":27,"text":367,"correct":22},"因素分析法",{"key":30,"text":369,"correct":32},"比率分析法",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":212,"analysis":34},52271,"影响工程成本的因素有( )。",[374,376,378,380,382],{"key":20,"text":375,"correct":22},"工程量",{"key":24,"text":377,"correct":32},"物资预算定额含量",{"key":27,"text":379,"correct":32},"活劳动预算定额含量",{"key":30,"text":381,"correct":22},"完成单位工程量的物资和活劳动消耗数量",{"key":61,"text":383,"correct":22},"物资和活劳动的单价",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":398,"analysis":34},52272,"下列费用中，属于工程成本范围的有( )。",[388,390,392,394,396],{"key":20,"text":389,"correct":22},"周转材料摊销费",{"key":24,"text":391,"correct":22},"周转材料租赁费",{"key":27,"text":393,"correct":32},"施工机械购置费",{"key":30,"text":395,"correct":22},"施工机械台班费",{"key":61,"text":397,"correct":32},"银行贷款利","ABD",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":343,"analysis":34},52273,"量本利分析法中的保本点是指( )。",[403,405,407,409,411],{"key":20,"text":404,"correct":22},"预算成本线与实际成本线的交点",{"key":24,"text":406,"correct":32},"固定成本线与变动成本线的交点",{"key":27,"text":408,"correct":22},"工程成本盈亏分界点",{"key":30,"text":410,"correct":32},"预算成本线的起点",{"key":61,"text":412,"correct":32},"实际成本线的起点",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":427,"analysis":34},52274,"工程成本管理的基础工作主要指( )。",[417,419,421,423,425],{"key":20,"text":418,"correct":32},"技术节约措施",{"key":24,"text":420,"correct":22},"定额管理",{"key":27,"text":422,"correct":32},"压缩成本支出",{"key":30,"text":424,"correct":22},"材料物资的计量. 验收和保管",{"key":61,"text":426,"correct":22},"各项原始记录","BDE",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":104,"analysis":34},52275,"工程成本管理要求划分好本期成本与下期成本的界限，为此需要遵循的会计原则有（ ）。",[432,434,436,438,440],{"key":20,"text":433,"correct":32},"历史成本原则",{"key":24,"text":435,"correct":22},"成本与收入配比原则",{"key":27,"text":437,"correct":22},"责权发生制原则",{"key":30,"text":439,"correct":32},"可比性原则",{"key":61,"text":441,"correct":32},"一贯性原则",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":456,"analysis":34},52276,"工程成本核算应区分收益性支出和资本性支出。下列支出中，属于资本性支出的有（ ）。",[446,448,450,452,454],{"key":20,"text":447,"correct":32},"机械使用费支出",{"key":24,"text":449,"correct":32},"企业财务费支出",{"key":27,"text":451,"correct":32},"企业管理费用支出",{"key":30,"text":453,"correct":22},"购买无形资产的支出",{"key":61,"text":455,"correct":22},"更新固定资产的支持","DE",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":471,"analysis":34},52277,"工程项目成本控制程序的环节有( )。",[461,463,465,467,469],{"key":20,"text":462,"correct":22},"制定控制标准",{"key":24,"text":464,"correct":32},"建立控制制度",{"key":27,"text":466,"correct":22},"实施成本监督",{"key":30,"text":468,"correct":22},"确定成本差异",{"key":61,"text":470,"correct":22},"消除成本差异","ACDE",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":63,"analysis":34},52278,"在进行工程成本核算时，需要正确划分的成本费用的界限有( )。",[476,478,480,482,484],{"key":20,"text":477,"correct":22},"工程成本与期间费用的界限",{"key":24,"text":479,"correct":22},"各个成本核算对象应负担的成本的界限",{"key":27,"text":481,"correct":22},"已完工程和未完工程的成本的界限",{"key":30,"text":483,"correct":22},"本期工程和不属于本期工程的成本的界限",{"key":61,"text":485,"correct":32},"变动成本和固定成本的界限",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":90,"analysis":34},52279,"施工过程中控制工程成本的方法主要有( )",[490,492,494,496,498],{"key":20,"text":491,"correct":22},"编制并落实工程成本计划",{"key":24,"text":493,"correct":22},"建立月度资金收支计划管理制度",{"key":27,"text":495,"correct":32},"控制投标报价的让利幅度",{"key":30,"text":497,"correct":32},"及时办理经济技术签证",{"key":61,"text":499,"correct":22},"实施施工成本跟踪考核",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":90,"analysis":34},52280,"成本核算的作用有( )。",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"反映施工项目各项费用的支出，严格遵守成本计算规则",{"key":24,"text":507,"correct":22},"分配和归集各种生产费用，计算施工项目的实际成本",{"key":27,"text":509,"correct":32},"是增加利润的重要途径",{"key":30,"text":511,"correct":32},"是落实成本责任制的依据",{"key":61,"text":513,"correct":22},"反映本计划的执行情况，为挖掘降低成本的潜力提供可靠的资料",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":90,"analysis":34},52281,"下列各项中，可作为工程项目成本控制方法的是( )。",[518,520,522,524,526],{"key":20,"text":519,"correct":22},"编制成本计划，控制项目施工成本",{"key":24,"text":521,"correct":22},"建立月度资金收支计划",{"key":27,"text":523,"correct":32},"建立项目经理部",{"key":30,"text":525,"correct":32},"实行项目法施工",{"key":61,"text":527,"correct":22},"实施跟踪考核",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":33,"analysis":34},52282,"工程直接成本包括( )。",[532,534,536,538,540],{"key":20,"text":533,"correct":22},"人工费",{"key":24,"text":535,"correct":22},"材料费",{"key":27,"text":537,"correct":22},"机械使用费",{"key":30,"text":539,"correct":32},"施工单位检验试验费",{"key":61,"text":541,"correct":32},"施工单位管理人员工资和奖金",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":104,"analysis":34},52283,"在利用因素分析法进行分析时，一定要按构成因素的顺序依次替代，一般应( )。",[546,548,550,552,554],{"key":20,"text":547,"correct":32},"先计算次要因素，后计算主要因素",{"key":24,"text":549,"correct":22},"先变动数量指标，后变动质量指标",{"key":27,"text":551,"correct":22},"先计算主要因素，后计算次要因素",{"key":30,"text":553,"correct":32},"先变动质量指标，后变动数量指标",{"key":61,"text":555,"correct":32},"先计算外部因素，后计算内部因素",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":570,"analysis":34},52284,"要保证工程成本的真实性和准确性，应( )。",[560,562,564,566,568],{"key":20,"text":561,"correct":22},"努力提高业务人员的业务素质和思想素质",{"key":24,"text":563,"correct":32},"实行项目成本目标分解归口管理",{"key":27,"text":565,"correct":22},"加强业务部门之间的联系和协调",{"key":30,"text":567,"correct":22},"做好与成本有关的管理和消耗台账",{"key":61,"text":569,"correct":32},"落实项目目标成本责任制","ACD",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":185,"analysis":34},52285,"工程成本可分为( )。",[575,577,579,581,583],{"key":20,"text":576,"correct":32},"实际成本降低额",{"key":24,"text":578,"correct":22},"计划成本",{"key":27,"text":580,"correct":22},"实际成本",{"key":30,"text":582,"correct":22},"预算成本",{"key":61,"text":584,"correct":32},"概算成本",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":456,"analysis":34},52286,"下列成本费用中，可以列入工程成本的有( )。 下列成本费用中，可以列入工程成本的有( )。",[589,591,593,595,597],{"key":20,"text":590,"correct":32},"企业赞助支出",{"key":24,"text":592,"correct":32},"对外投资支出",{"key":27,"text":594,"correct":32},"违约金支出",{"key":30,"text":596,"correct":22},"其他直接费用",{"key":61,"text":598,"correct":22},"周转材料摊销",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":90,"analysis":34},52287,"确定该工程人工费控制重点的依据有（）。",[603,605,607,609,611],{"key":20,"text":604,"correct":22},"工日变动影响程度",{"key":24,"text":606,"correct":22},"日平均人工单价变动影响程度",{"key":27,"text":608,"correct":32},"工日数的大小",{"key":30,"text":610,"correct":32},"日平均人工单价的高低",{"key":61,"text":612,"correct":22},"人工费超支率",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":625,"analysis":34},52288,"主体与装饰工程人工费超支的主要原因为( )的变化。",[617,619,621,623],{"key":20,"text":618,"correct":22},"主体工程用工数超支",{"key":24,"text":620,"correct":32},"主体工程人工费日单价超支",{"key":27,"text":622,"correct":32},"装饰工程用工数超支",{"key":30,"text":624,"correct":22},"装饰工程人工费日单价超支","AD",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":343,"analysis":34},52289,"某建筑施工企业在进行工程成本预测和计划时，采用了量本利分析法，该企业去年年度施工产值和工程成本构成情况如下： (1)施工产值为4 250万元； (2)预算成本为3 850万元； (3)实际成本为3 750万元，其中变动成本为3 150万元，固定成本为600万元。 根据今年经营的实际情况和成本降低计划，预计今年固定成本支出将减少80万元。预计今年施工产值为5 000万元。 下列关于本案例量本利分析过程和结论的说法中，正确的为( )。",[630,632,634,636],{"key":20,"text":631,"correct":22},"预计今年可以保本",{"key":24,"text":633,"correct":32},"若今年固定成本保持去年水平不变，则今年将不能保本",{"key":27,"text":635,"correct":22},"若单位产值变动成本率能够降低，则保本产值也会降低",{"key":30,"text":637,"correct":32},"若今年预计的施工产值大于5 000万元，则保本产值也会增加",{"id":639,"libraryId":5,"type":15,"typeLabel":16,"stem":640,"options":641,"answer":185,"analysis":34},52290,"安全生产检查的组织形式主要有( )。",[642,644,646,648,650],{"key":20,"text":643,"correct":32},"一般工程的安全生产检查",{"key":24,"text":645,"correct":22},"定期安全生产检查",{"key":27,"text":647,"correct":22},"专业性安全生产检查",{"key":30,"text":649,"correct":22},"经常性安全生产检查",{"key":61,"text":651,"correct":32},"特殊工程的安全生产检查",{"id":653,"libraryId":5,"type":15,"typeLabel":16,"stem":654,"options":655,"answer":119,"analysis":34},52291,"为了推进建筑施工企业安全生产标准化建设，各级建设行政管理部门应( )。",[656,658,660,662,664],{"key":20,"text":657,"correct":22},"制定本地区安全生产标准化工作的实施方案",{"key":24,"text":659,"correct":22},"明确施工企业和项目的安全生产标准化工作目标",{"key":27,"text":661,"correct":22},"组织动态监管和达标确认",{"key":30,"text":663,"correct":32},"组织第三方中介机构对施工企业和项目定期评价",{"key":61,"text":665,"correct":22},"对施工企业和项目安全生产标准化绩效进行考评奖惩",{"id":667,"libraryId":5,"type":15,"typeLabel":16,"stem":668,"options":669,"answer":242,"analysis":34},52292,"为保证施工项目目标的顺利实施，项目开工前建设工程监理单位必须进行充分的施工准备，其主要内容大致可分为( )。",[670,672,674,676,678],{"key":20,"text":671,"correct":32},"施工部署",{"key":24,"text":673,"correct":22},"审查施工单位选择分包单位的资质",{"key":27,"text":675,"correct":22},"参与设计单位向施工单位的设计交底",{"key":30,"text":677,"correct":32},"工序交接",{"key":61,"text":679,"correct":22},"审查施工组织设计",{"id":681,"libraryId":5,"type":15,"typeLabel":16,"stem":682,"options":683,"answer":570,"analysis":34},52293,"该施工企业需补报的文件，资料为（ ）",[684,686,688,690],{"key":20,"text":685,"correct":22},"保证安全生产条件所需资金投入资料",{"key":24,"text":687,"correct":32},"施工机具更新计划",{"key":27,"text":689,"correct":22},"生产安全事故应急救援预案",{"key":30,"text":691,"correct":22},"危险性较大分部分工程的预防. 监控措施",{"id":693,"libraryId":5,"type":15,"typeLabel":16,"stem":694,"options":695,"answer":33,"analysis":34},52294,"如该施工企业在取得安全生产许可证前就从事建筑施工活动，将可能受到的处罚有（ ）。",[696,698,700,702],{"key":20,"text":697,"correct":22},"停止施工",{"key":24,"text":699,"correct":22},"没收违法所得",{"key":27,"text":701,"correct":22},"处以罚款",{"key":30,"text":703,"correct":32},"吊销营业执照",{"id":705,"libraryId":5,"type":15,"typeLabel":16,"stem":706,"options":707,"answer":212,"analysis":34},52295,"下列关于工程质量事故的报告，说法正确的是( )。",[708,710,712,714,716],{"key":20,"text":709,"correct":22},"较大. 重大及特别重大事故逐级上报至国务院住房和城乡建设主管部门",{"key":24,"text":711,"correct":32},"工程质量事故发生后，事故现场有关人员应当立即向监理工程师报告",{"key":27,"text":713,"correct":32},"住房和城乡建设主管部门逐级上报事故情况时，每级上报时间不得超过l小时",{"key":30,"text":715,"correct":22},"事故报告后出现新情况，以及事故发生之日起30日内伤亡人数发生变化的，应当及时补报",{"key":61,"text":717,"correct":22},"住房和城乡建设主管部门上报事故情况，应当同时报告本级人民政府",[719,723,726,729,732,734],{"id":720,"name":721,"category":7,"favorite":722},109,"发布证券研究报告业务",1,{"id":724,"name":725,"category":7,"favorite":8},30,"经济师",{"id":727,"name":728,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":730,"name":731,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":733,"category":7,"favorite":8},"(初级)保险专业",{"id":735,"name":736,"category":7,"favorite":8},51,"(初级)财政税收"]