[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-38":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":701},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,38,50,2220,[13,38,53,68,83,98,113,128,142,157,172,186,201,213,226,241,253,268,281,295,305,317,332,344,356,370,384,399,414,429,443,455,467,479,491,503,517,529,542,557,569,583,594,608,622,634,649,663,677,689],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},52196,2,"多选题","根据工程项目计划管理的需要，工程项目进度计划应包括( )。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","工程项目年度计划",true,{"key":24,"text":25,"correct":22},"B","工程项目前期工作计划",{"key":27,"text":28,"correct":29},"C","成本控制计划",false,{"key":31,"text":32,"correct":29},"D","资源安排计划 .",{"key":34,"text":35,"correct":22},"E","工程项目建设总进度计划","ABE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},52197,"进行工程项目进度管理的意义在于可以使工程项目( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"按预定时间交付使用，及时发挥投资效益",{"key":24,"text":45,"correct":29},"以最快的速度完成，获得最大的投资收益",{"key":27,"text":47,"correct":29},"以最快的速度完成，使工程成本最低",{"key":31,"text":49,"correct":29},"资源需要量大大减少，使工程总成本最低",{"key":34,"text":51,"correct":22},"资源得到合理安排，降低工程成本","AE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},52198,"在确定流水步距时应遵循的原则是( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"流水步距应为常数",{"key":24,"text":60,"correct":22},"保证工程质量. 满足安全生产要求",{"key":27,"text":62,"correct":22},"每个专业队均能连续施I",{"key":31,"text":64,"correct":29},"各个专业工作队的人员必须相等",{"key":34,"text":66,"correct":22},"满足施工顺序要求","BCE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},52199,"流水施工的基本方式有( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"全等节拍流水施工",{"key":24,"text":75,"correct":29},"特定节拍流水施工",{"key":27,"text":77,"correct":22},"成倍节拍流水施I",{"key":31,"text":79,"correct":22},"分别流水施工",{"key":34,"text":81,"correct":29},"均匀节拍流水施工","ACD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},52200,"与运用横道图编制进度计划相比，运用网络图编制进度计划的优越性主要有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":29},"编制方法简单明了",{"key":24,"text":90,"correct":22},"能全面清洗的表达各项工作之间相互制约. 相互依赖的关系。",{"key":27,"text":92,"correct":22},"可采用计算机技术及相关软件对进度计划实行动态管理",{"key":31,"text":94,"correct":22},"能够进行各种时间参数的计算并对进度计划进行优化",{"key":34,"text":96,"correct":29},"可形象直接地反映进度与资源消耗量之间的关系","BCD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},52201,"在工程实施过程中，进度拖延的原因通常有( )。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"制定工期及相关计划的失误",{"key":24,"text":105,"correct":22},"工程变更",{"key":27,"text":107,"correct":29},"未采取加快进度的技术措施",{"key":31,"text":109,"correct":22},"管理过程中的失误",{"key":34,"text":111,"correct":22},"资金不到位和停工待料","ABDE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},52202,"工程进度计划的主要作用有( )。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"为工程项目实施过程中的进度控制提供依据. 指南",{"key":24,"text":120,"correct":22},"为工程项目实施过程中的劳动力和各种资源配置提供依据",{"key":27,"text":122,"correct":22},"为工程项目实施有关各方在时间上的协调配合提供依据",{"key":31,"text":124,"correct":29},"为实现最短的建设周期提供保障",{"key":34,"text":126,"correct":22},"为高效地完成工程建设提供保障","ABCE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":67,"analysis":37},52203,"施工段是表达流水施工的空间参数。合理划分施工段的基本要求有( )。",[132,134,136,138,140],{"key":20,"text":133,"correct":29},"每个施工过程在各个施工段上的劳动量均应相等",{"key":24,"text":135,"correct":22},"施工段的分界线应尽可能设在对结构整体性影响较小的部位",{"key":27,"text":137,"correct":22},"每个施工段要有足够的工作面，以充分发挥专业工人和机械设备的生产效率",{"key":31,"text":139,"correct":29},"每个施工段要有足够的工作面，以满足同一施工段内组织多个专业工作队同时施工的要求",{"key":34,"text":141,"correct":22},"施工段的数目应与主导施工过程相协调",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},52204,"下列选项中，属于工程进度管理组织措施的有( )。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"建立进度管理工作制度",{"key":24,"text":149,"correct":29},"采取加快工程进度的施工方法",{"key":27,"text":151,"correct":29},"合同工期与进度计划的协调",{"key":31,"text":153,"correct":22},"确定进度目标及责任落实",{"key":34,"text":155,"correct":22},"分析影响进度目标实现的风险因素","ADE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},52205,"流水施工将给项目带来显著的经济效果，主要体现在( )。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"缩短施工工期",{"key":24,"text":164,"correct":22},"降低工程成本",{"key":27,"text":166,"correct":29},"提高工程质量",{"key":31,"text":168,"correct":22},"提高劳动生产率",{"key":34,"text":170,"correct":29},"可以使工程成本最低","ABD",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":36,"analysis":37},52206,"在组织流失施工时，划分流水施工段的基本要求有（ ）",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"分段施工应保证拟建项目结构整体的完整性",{"key":24,"text":179,"correct":22},"组织连续. 均衡施工，各流水段的工程量应大致相等",{"key":27,"text":181,"correct":29},"流水施工段的数量应与参与流水施工的施工过程数相等",{"key":31,"text":183,"correct":29},"参加流水施工的各个施工过程的持续时间必须相同",{"key":34,"text":185,"correct":22},"流水施工段的划分应保证工人施工有足够的工作面",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":200,"analysis":37},52207,"工程实际进度与计划进度的比较方法主要有( )。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"横道图比较法",{"key":24,"text":193,"correct":29},"直方图比较法",{"key":27,"text":195,"correct":22},"S型曲线比较法",{"key":31,"text":197,"correct":29},"工程预算比较法",{"key":34,"text":199,"correct":22},"网络计划图上比较法","ACE",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":82,"analysis":37},52208,"某工程项目分解为基础工程、主体工程、屋面工程、装饰工程四个施工过程，划分为四个施工段组织流水作业，每一施工过程由一个专业工作队负责施工。各施工过程在各个施工段上的流水节拍如下表所示 回答72-75题; 根据该工程项目各施工过程时间参数的特征，下列关于该工程项目流水施工的说法中，正确的是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"该工程项目适宜采用分别流水组织施工",{"key":24,"text":208,"correct":29},"该工程项目适宜采用成倍节拍组织流水施工",{"key":27,"text":210,"correct":22},"组织该工程项目流水施工应使相邻专业工作队在开工时间上最大限度地搭接",{"key":31,"text":212,"correct":22},"组织该工程项目流水施工的关键问题是确定相邻专业工作队之间的流水步距",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":225,"analysis":37},52209,"该工程项目流水施工特点为（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":29},"每个专业工作队都能连续施工，所有施工段上无空闲时间",{"key":24,"text":220,"correct":22},"每个专业工作队都能连续施工。有些施工段上可能有空闲",{"key":27,"text":222,"correct":29},"施工段上无空闲时间，但专业工作队不能连续施工",{"key":31,"text":224,"correct":22},"一般情况下，相邻施工过程之间的流水步距不相等","BD",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":240,"analysis":37},52210,"流水施工组织方式具有的特点有( )。",[230,232,234,236,238],{"key":20,"text":231,"correct":22},"充分利用工作面，施工工期较短",{"key":24,"text":233,"correct":22},"为文明施工和进行现场的科学管理创造有利条件",{"key":27,"text":235,"correct":22},"专业队及其工人能连续作业",{"key":31,"text":237,"correct":22},"有利于资源供应的组织工作",{"key":34,"text":239,"correct":29},"具有很好的稳定性和时效性","ABCD",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":200,"analysis":37},52211,"下列措施中，属于进度管理合同措施的有( )。",[245,247,248,250,251],{"key":20,"text":246,"correct":22},"实行分段设计. 分段发包. 分段施工. 缩短建设工期",{"key":24,"text":147,"correct":29},{"key":27,"text":249,"correct":22},"协调合同工期与进度计划的关系",{"key":31,"text":153,"correct":29},{"key":34,"text":252,"correct":22},"加强索赔管理",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":267,"analysis":37},52212,"为保证工程项目进度目标的顺利实现，应开展的主要工作有( )。",[257,259,261,263,265],{"key":20,"text":258,"correct":22},"检查各层次的进度计划，形成严密的计划保证系统",{"key":24,"text":260,"correct":29},"控制外部环境和条件变化",{"key":27,"text":262,"correct":22},"签订责任状",{"key":31,"text":264,"correct":22},"做好工程进度记录. 填写工程进度统计表",{"key":34,"text":266,"correct":22},"做好工程建设中的调度工作","ACDE",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":36,"analysis":37},52213,"工程施工中组织流水作业可以带来的经济效果有( )。",[272,274,276,278,280],{"key":20,"text":273,"correct":22},"缩短工期",{"key":24,"text":275,"correct":22},"提高劳动生产效率",{"key":27,"text":277,"correct":29},"节省劳动力",{"key":31,"text":279,"correct":29},"减少材料用量",{"key":34,"text":164,"correct":22},{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":171,"analysis":37},52214,"流水施工在工艺划分、时间排列和空间布置上的统筹安排，将给工程项目带来显著的经济效果，它主要包括以下几点（ ）。",[285,287,289,291,293],{"key":20,"text":286,"correct":22},"可以缩短施工工期",{"key":24,"text":288,"correct":22},"可以提高生产效率",{"key":27,"text":290,"correct":29},"可以降低风险",{"key":31,"text":292,"correct":22},"可以降低工程成本",{"key":34,"text":294,"correct":29},"可以统筹规划",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":171,"analysis":37},52215,"在该基础工程施工中组织流水作业能产生的经济效果为( )。",[299,300,302,304],{"key":20,"text":286,"correct":22},{"key":24,"text":301,"correct":22},"可以提高劳动生产率",{"key":27,"text":303,"correct":29},"可以减少建筑工程量",{"key":31,"text":292,"correct":22},{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":27,"analysis":37},52216,"某工程项目分解为基础工程、主体工程、层面工程、装饰工程四个施工过程，划分为四个施工段组织流水作业，每一施工过程由一个专业工作队负责施工。各施工过程在各个施工段上的流水节拍如下表所示。 该工程项目的流水施工工期为( )个月。",[309,311,313,315],{"key":20,"text":310,"correct":29},"22",{"key":24,"text":312,"correct":29},"24",{"key":27,"text":314,"correct":22},"26",{"key":31,"text":316,"correct":29},"28",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":331,"analysis":37},52217,"施工单位在隐蔽工程隐蔽前，应当通知( )。",[321,323,325,327,329],{"key":20,"text":322,"correct":22},"质量监督机构",{"key":24,"text":324,"correct":22},"建设单位",{"key":27,"text":326,"correct":29},"质量检测机构",{"key":31,"text":328,"correct":29},"设计单位",{"key":34,"text":330,"correct":29},"政府主管部门","AB",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":225,"analysis":37},52218,"双方约定工程采用固定总价合同形式，由于内承重墙体裂缝较多，大学在支付学生公寓楼的工程款时，可以选择的合理做法是( )。",[336,338,340,342],{"key":20,"text":337,"correct":29},"按固定合同总价全额付款",{"key":24,"text":339,"correct":22},"拒绝支付全部工程款",{"key":27,"text":341,"correct":29},"支付部分工程款",{"key":31,"text":343,"correct":22},"扣除修复费用后支付其余工程款",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":97,"analysis":37},52219,"关于建筑公司以使用不当超过保修期为由拒绝赔偿问题的处理，下述说法中正确的是( )。",[348,350,352,354],{"key":20,"text":349,"correct":29},"拒绝赔偿理由充分",{"key":24,"text":351,"correct":22},"双方协商解决",{"key":27,"text":353,"correct":22},"邀请中间结构进行调解",{"key":31,"text":355,"correct":22},"向人民法院提起诉讼",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":112,"analysis":37},52220,"工程质量通常体现在( )方面。",[360,362,364,366,368],{"key":20,"text":361,"correct":22},"适用性",{"key":24,"text":363,"correct":22},"可靠性",{"key":27,"text":365,"correct":29},"时效性",{"key":31,"text":367,"correct":22},"外观质量",{"key":34,"text":369,"correct":22},"环境协调",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":240,"analysis":37},52221,"建设单位的下列行为中，不符合其质量责任和义务的有( )。",[374,376,378,380,382],{"key":20,"text":375,"correct":22},"暗示承包商降低工程质量标准",{"key":24,"text":377,"correct":22},"要求承包商使用不合格建筑材料",{"key":27,"text":379,"correct":22},"暗示承包商使用不合格建筑材料",{"key":31,"text":381,"correct":22},"要求承包商违反工程建设强制性标准",{"key":34,"text":383,"correct":29},"将工程发包给具有相应资质等级的单位",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":398,"analysis":37},52222,"下列( )是建设工程竣工验收必须具备的条件。",[388,390,392,394,396],{"key":20,"text":389,"correct":29},"有业主签署的工程保修书",{"key":24,"text":391,"correct":22},"有完整的技术档案和施工管理材料",{"key":27,"text":393,"correct":22},"有工程使用的主要建筑材料的进场试验报告",{"key":31,"text":395,"correct":22},"完成了建设工程设计和合同约定的各项内容",{"key":34,"text":397,"correct":22},"有设计单位签署的质量合格文件","BCDE",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":413,"analysis":37},52223,"下列工作中，属于施工方施工阶段质量控制主要工作的有( )。",[403,405,407,409,411],{"key":20,"text":404,"correct":29},"组织并完成施工现场的“三通一平\"工作，包括提供工程地质和地下管线资料，提供水准点和坐标控制点等",{"key":24,"text":406,"correct":22},"编制项目质量计划及施工组织设计文件，建立和完善质量保证体系",{"key":27,"text":408,"correct":29},"组织图纸会审和技术交底",{"key":31,"text":410,"correct":22},"组织原材料. 构配件. 半成品和工程设备的现场检查. 验收和测试",{"key":34,"text":412,"correct":22},"组织工序交接检查. 隐蔽工程验收和技术复核工作","BDE",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":428,"analysis":37},52224,"以下关于勘察、设计单位的质量责任和义务的说法中，正确的有( )。",[418,420,422,424,426],{"key":20,"text":419,"correct":22},"应依法取得相应等级的资质证书",{"key":24,"text":421,"correct":29},"不必严格按照工程建设的强制性标准进行勘察和设计",{"key":27,"text":423,"correct":22},"勘察单位提供的勘察成果必须真实. 准确",{"key":31,"text":425,"correct":29},"设计单位可对建设工程的设计自行修改",{"key":34,"text":427,"correct":29},"设计单位没有向施工单位详细说明审查合格的施工图设计文件的义务","AC",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":240,"analysis":37},52225,"工程质量包含( )。",[433,435,437,439,441],{"key":20,"text":434,"correct":22},"工序质量",{"key":24,"text":436,"correct":22},"分项工程质量",{"key":27,"text":438,"correct":22},"分部工程质量",{"key":31,"text":440,"correct":22},"单位工程质量",{"key":34,"text":442,"correct":29},"方案设计质量",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":97,"analysis":37},52226,"工程质量管理是指为保证提高工程质量而进行的一系列管理工作，它的目的是以尽可能低的成本，按既定的工期完成一定数量的达到质量标准的工程。它的任务就在于建立和健全质量管理体系，用企业的工作质量来保证工程实物质量。 回答43-47题: 以下属于工程质量的特点有( )。",[447,449,451,453],{"key":20,"text":448,"correct":29},"环境多变性",{"key":24,"text":450,"correct":22},"质量波动大",{"key":27,"text":452,"correct":22},"质量变异大",{"key":31,"text":454,"correct":22},"质量隐蔽性强",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":82,"analysis":37},52227,"影响工程质量的因素包括( )。",[459,461,463,465],{"key":20,"text":460,"correct":22},"环境的因素",{"key":24,"text":462,"correct":29},"技术的因素",{"key":27,"text":464,"correct":22},"方法的因素",{"key":31,"text":466,"correct":22},"材料的因素",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":82,"analysis":37},52228,"工程质量管理的原则有( )。",[471,473,475,477],{"key":20,"text":472,"correct":22},"“质量第一”是根本出发点",{"key":24,"text":474,"correct":29},"管理从严",{"key":27,"text":476,"correct":22},"以预防为主的思想",{"key":31,"text":478,"correct":22},"为用户服务的思想",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":97,"analysis":37},52229,"工程质量管理要从基础抓起，其基础工作包括( )。",[483,485,487,489],{"key":20,"text":484,"correct":29},"确定质量要求和标准",{"key":24,"text":486,"correct":22},"质量教育",{"key":27,"text":488,"correct":22},"建立健全的质量责任制",{"key":31,"text":490,"correct":22},"质量管理的标准化",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":225,"analysis":37},52230,"对工程质量的管理要形成制度，下述说法中不正确的有( )。",[495,497,499,501],{"key":20,"text":496,"correct":29},"国务院建设行政主管部门对全国的建设工程质量实施统一的监督管理",{"key":24,"text":498,"correct":22},"监管单位才有权对建设工程的质量事故进行投诉",{"key":27,"text":500,"correct":29},"工程质量检测机构的检测依据是国家部门和地区颁发的有关建设工程的法规和技术标准",{"key":31,"text":502,"correct":22},"质量认证证书的有效期一般为五年",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":413,"analysis":37},52231,"施工阶段工程质量控制的内容和措施包括（ ）。",[507,509,511,513,515],{"key":20,"text":508,"correct":29},"编制施工组织设计",{"key":24,"text":510,"correct":22},"严格进行材料试验",{"key":27,"text":512,"correct":29},"组织技术交底",{"key":31,"text":514,"correct":22},"实施工序质量监控",{"key":34,"text":516,"correct":22},"积累施工技术资料",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":171,"analysis":37},52232,"按规定，在保修期限和保修范围内，甲建筑工程公司对用户进行回访的方式有( )。",[521,523,525,527],{"key":20,"text":522,"correct":22},"季节性回访",{"key":24,"text":524,"correct":22},"技术性回访",{"key":27,"text":526,"correct":29},"维修时回访",{"key":31,"text":528,"correct":22},"保修期满前回访",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":541,"analysis":37},52233,"甲建筑工程公司在竣工交付阶段质量控制的主要工作为( )。",[533,535,537,539],{"key":20,"text":534,"correct":29},"组织竣工验收",{"key":24,"text":536,"correct":22},"做好竣工预检",{"key":27,"text":538,"correct":22},"整理竣工资料",{"key":31,"text":540,"correct":29},"执行竣工标准","BC",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":556,"analysis":37},52234,"在工程施工过程中，施工单位不得( ).",[546,548,550,552,554],{"key":20,"text":547,"correct":29},"分包工程",{"key":24,"text":549,"correct":29},"租赁施工机械",{"key":27,"text":551,"correct":22},"使用未经检验的建筑材料",{"key":31,"text":553,"correct":22},"自行进行隐蔽工程验收",{"key":34,"text":555,"correct":22},"擅自修改工程设计","CDE",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":97,"analysis":37},52235,"上述质量问题中，应由施工单位承担全部或部分维修费用的为（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":29},"1",{"key":24,"text":564,"correct":22},"2",{"key":27,"text":566,"correct":22},"3",{"key":31,"text":568,"correct":22},"4",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":67,"analysis":37},52236,"对工程进行施工技术组织措施设计主要包括( )。",[573,575,577,579,581],{"key":20,"text":574,"correct":29},"施工程序. 施工顺序",{"key":24,"text":576,"correct":22},"保证质量. 安全生产",{"key":27,"text":578,"correct":22},"季节性施工",{"key":31,"text":580,"correct":29},"进度保证及现场管理",{"key":34,"text":582,"correct":22},"防止环境污染",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":36,"analysis":37},52237,"回访的方式一般有( )。",[587,588,589,591,593],{"key":20,"text":522,"correct":22},{"key":24,"text":524,"correct":22},{"key":27,"text":590,"correct":29},"每月定期回访",{"key":31,"text":592,"correct":29},"不定期回访",{"key":34,"text":528,"correct":22},{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":97,"analysis":37},52238,"单位工程施工质量验收合格的条件是( )。",[598,600,602,604,606],{"key":20,"text":599,"correct":29},"所含检验批质量抽样检验合格且资料完整",{"key":24,"text":601,"correct":22},"所含分部工程质量验收均合格且有关安全和功能检测资料完整",{"key":27,"text":603,"correct":22},"主要功能项目抽查结果符合相关专业质量验收规范规定且质量控制资料完整",{"key":31,"text":605,"correct":22},"观感质量验收符合要求",{"key":34,"text":607,"correct":29},"通过建设行政管理部门备案审查",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":398,"analysis":37},52239,"除人的因素外，影响工程质量的主要因素还包括（ ）。",[612,614,616,618,620],{"key":20,"text":613,"correct":29},"建筑市场",{"key":24,"text":615,"correct":22},"工艺施工方法",{"key":27,"text":617,"correct":22},"材料设备构件",{"key":31,"text":619,"correct":22},"施工机械设备",{"key":34,"text":621,"correct":22},"工程环境",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":541,"analysis":37},52240,"下列关于学生公寓内承重墙体裂缝的修复和费用支出的说法中，正确的有( )。",[626,628,630,632],{"key":20,"text":627,"correct":29},"由大学另行委托其他建筑公司修复，修复费用由大学承担",{"key":24,"text":629,"correct":22},"由大学另行委托其他建筑公司修复，修复费用由大学从原建筑公司的保修金中扣除",{"key":27,"text":631,"correct":22},"由建筑公司负责修复，修复费用由建筑公司承担",{"key":31,"text":633,"correct":29},"由建筑公司负责修复，修复费用由大学承担",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":648,"analysis":37},52241,"下列各项建筑工程组成部分中，应计算全面积的有( )。",[638,640,642,644,646],{"key":20,"text":639,"correct":22},"建筑物有围护结构的层高在2．20m以上的架空走廊",{"key":24,"text":641,"correct":29},"建筑物的阳台",{"key":27,"text":643,"correct":29},"有永久顶盖无围护结构的层高在2．20m以上的车棚",{"key":31,"text":645,"correct":22},"层高在2．20m以上的大厅",{"key":34,"text":647,"correct":29},"宽度超过2．10m的雨棚","AD",{"id":650,"libraryId":5,"type":15,"typeLabel":16,"stem":651,"options":652,"answer":200,"analysis":37},52242,"下列时间中，属于工人工作时间中必须消耗时间的有( )。",[653,655,657,659,661],{"key":20,"text":654,"correct":22},"有效工作时间",{"key":24,"text":656,"correct":29},"停工时间",{"key":27,"text":658,"correct":22},"休息时间",{"key":31,"text":660,"correct":29},"偶然时间",{"key":34,"text":662,"correct":22},"不可避免的中断时间",{"id":664,"libraryId":5,"type":15,"typeLabel":16,"stem":665,"options":666,"answer":225,"analysis":37},52243,"下列各项建筑组成部分中，不计算建筑面积的有( )。",[667,669,671,673,675],{"key":20,"text":668,"correct":29},"阳台",{"key":24,"text":670,"correct":22},"用于检修. 消防等的室外爬梯",{"key":27,"text":672,"correct":29},"地下室",{"key":31,"text":674,"correct":22},"突出外墙的构件. 配件",{"key":34,"text":676,"correct":29},"室内楼梯间",{"id":678,"libraryId":5,"type":15,"typeLabel":16,"stem":679,"options":680,"answer":171,"analysis":37},52244,"工程建设定额是指在正常的施工条件下，完成一定计量单位的合格产品所必须消耗的劳动力、材料、机械设备及其资金的数量标准。 根据上述一段话回答14-18题。 上面所说的“正常的施工条件”包括( )。",[681,683,685,687],{"key":20,"text":682,"correct":22},"材料储备合理",{"key":24,"text":684,"correct":22},"劳动组织合理",{"key":27,"text":686,"correct":29},"生产工艺先进",{"key":31,"text":688,"correct":22},"机械运转正常",{"id":690,"libraryId":5,"type":15,"typeLabel":16,"stem":691,"options":692,"answer":648,"analysis":37},52245,"在工程建设中实行定额管理能( )。",[693,695,697,699],{"key":20,"text":694,"correct":22},"减少资金消耗量",{"key":24,"text":696,"correct":29},"影响工程质量",{"key":27,"text":698,"correct":29},"保证工程安全",{"key":31,"text":700,"correct":22},"生产出更好的建筑产品",[702,706,709,712,715,717],{"id":703,"name":704,"category":7,"favorite":705},109,"发布证券研究报告业务",1,{"id":707,"name":708,"category":7,"favorite":8},30,"经济师",{"id":710,"name":711,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":713,"name":714,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":716,"category":7,"favorite":8},"(初级)保险专业",{"id":718,"name":719,"category":7,"favorite":8},51,"(初级)财政税收"]