[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-36":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":733},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,36,50,2220,[13,38,53,68,83,98,112,127,141,155,170,185,200,215,230,243,257,271,285,299,313,327,340,355,369,382,397,411,425,439,454,468,483,497,511,525,539,553,567,582,596,610,624,638,652,666,681,690,704,719],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},52060,2,"多选题","以下关于勘察、设计单位的质量责任和义务的说法中，正确的有()。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","应依法取得相应等级的资质证书",true,{"key":24,"text":25,"correct":26},"B","不必严格按照工程建设的强制性标准进行勘察和设计",false,{"key":28,"text":29,"correct":22},"C","勘察单位提供的勘察成果必须真实、准确",{"key":31,"text":32,"correct":26},"D","设计单位可对建设工程的设计自行修改",{"key":34,"text":35,"correct":26},"E","设计单位没有向施工单位详细说明审查合格的施工图设计文件的义务","AC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},52061,"下列工作中，属于施工方施工阶段质量控制主要工作的有()。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"组织并完成施工现场的“三通一平\"工作，包括提供工程地质和地下管线资料，提供水准点和坐标控制点等",{"key":24,"text":45,"correct":22},"编制项目质量计划及施工组织设计文件，建立和完善质量保证体系",{"key":28,"text":47,"correct":26},"组织图纸会审和技术交底",{"key":31,"text":49,"correct":22},"组织原材料、构配件、半成品和工程设备的现场检查、验收和测试",{"key":34,"text":51,"correct":22},"组织工序交接检查、隐蔽工程验收和技术复核工作","BDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},52062,"施工阶段业主方的质量控制工作主要包括().",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"组织并完成施工现场的“三通一平”工作",{"key":24,"text":60,"correct":22},"组织图纸会审核技术交底",{"key":28,"text":62,"correct":26},"审查编制施工组织设计文件",{"key":31,"text":64,"correct":22},"审查分包单位资质条件",{"key":34,"text":66,"correct":26},"组织原材料、半成品和设备的现场检查、验收和测试","ABD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},52063,"回访的方式一般有()。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"季节性回访",{"key":24,"text":75,"correct":22},"技术性回访",{"key":28,"text":77,"correct":26},"每月定期回访",{"key":31,"text":79,"correct":26},"不定期回访",{"key":34,"text":81,"correct":22},"保修期满前回访","ABE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},52064,"单位工程施工质量验收合格的条件是()。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"所含检验批质量抽样检验合格且资料完整",{"key":24,"text":90,"correct":22},"所含分部工程质量验收均合格且有关安全和功能检测资料完整",{"key":28,"text":92,"correct":22},"主要功能项目抽查结果符合相关专业质量验收规范规定且质量控制资料完整",{"key":31,"text":94,"correct":22},"观感质量验收符合要求",{"key":34,"text":96,"correct":26},"通过建设行政管理部门备案审查","BCD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":52,"analysis":37},52065,"施工阶段工程质量控制的内容和措施包括（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"编制施工组织设计",{"key":24,"text":105,"correct":22},"严格进行材料试验",{"key":28,"text":107,"correct":26},"组织技术交底",{"key":31,"text":109,"correct":22},"实施工序质量监控",{"key":34,"text":111,"correct":22},"积累施工技术资料",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},52066,"工程质量包含()。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"工序质量",{"key":24,"text":119,"correct":22},"分项工程质量",{"key":28,"text":121,"correct":22},"分部工程质量",{"key":31,"text":123,"correct":22},"单位工程质量",{"key":34,"text":125,"correct":26},"方案设计质量","ABCD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":52,"analysis":37},52067,"下列关于质量管理的说法中，符合工程质量管理原则的有()。",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"工程施工以追求多快好省为原则",{"key":24,"text":134,"correct":22},"质量第一，好中求快，好中求省",{"key":28,"text":136,"correct":26},"依靠检查，保证工程质量",{"key":31,"text":138,"correct":22},"一切用数据说话，掌握提高工程质量的客观规律",{"key":34,"text":140,"correct":22},"树立为用户服务的思想，保证工程质量",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":126,"analysis":37},52068,"建设单位的下列行为中，不符合其质量责任和义务的有()。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"暗示承包商降低工程质量标准",{"key":24,"text":148,"correct":22},"要求承包商使用不合格建筑材料",{"key":28,"text":150,"correct":22},"暗示承包商使用不合格建筑材料",{"key":31,"text":152,"correct":22},"要求承包商违反工程建设强制性标准",{"key":34,"text":154,"correct":26},"将工程发包给具有相应资质等级的单位",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},52069,"在工程施工过程中，施工单位不得( ).",[159,161,163,165,167],{"key":20,"text":160,"correct":26},"分包工程",{"key":24,"text":162,"correct":26},"租赁施工机械",{"key":28,"text":164,"correct":22},"使用未经检验的建筑材料",{"key":31,"text":166,"correct":22},"自行进行隐蔽工程验收",{"key":34,"text":168,"correct":22},"擅自修改工程设计","CDE",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},52070,"工程施工组织设计中主要包括()。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"施工程序、施工顺序",{"key":24,"text":177,"correct":22},"保证质量、安全生产",{"key":28,"text":179,"correct":22},"季节性施工",{"key":31,"text":181,"correct":26},"进度保证及现场管理",{"key":34,"text":183,"correct":22},"防止环境污染","ABCE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},52071,"质量事故处罚方式有哪些( )",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"罚款",{"key":24,"text":192,"correct":26},"拘留",{"key":28,"text":194,"correct":22},"停业整顿",{"key":31,"text":196,"correct":22},"降低资质等级",{"key":34,"text":198,"correct":22},"吊销资质证书","ACDE",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},52082,"下列定额中，属于按编制程序和用途分类的有（）。",[204,206,208,210,212],{"key":20,"text":205,"correct":26},"国家定额",{"key":24,"text":207,"correct":22},"施工定额",{"key":28,"text":209,"correct":22},"预算定额",{"key":31,"text":211,"correct":26},"建筑工程定额",{"key":34,"text":213,"correct":26},"设备安装工程定额","BC",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":229,"analysis":37},52083,"下列时间中，属于工人工作时间中必须消耗时间的有()。",[219,221,223,225,227],{"key":20,"text":220,"correct":22},"有效工作时间",{"key":24,"text":222,"correct":26},"停工时间",{"key":28,"text":224,"correct":22},"休息时间",{"key":31,"text":226,"correct":26},"偶然时间",{"key":34,"text":228,"correct":22},"不可避免的中断时间","ACE",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":242,"analysis":37},52084,"下列工人工作时间中，属于有效工作时间的有（）。",[234,235,237,239,240],{"key":20,"text":224,"correct":26},{"key":24,"text":236,"correct":22},"基本工作时间",{"key":28,"text":238,"correct":22},"准备与结束工作时间",{"key":31,"text":222,"correct":26},{"key":34,"text":241,"correct":22},"辅助工作时间","BCE",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":82,"analysis":37},52085,"编制定额应简明适用，是指()。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"项目齐全，便于使用",{"key":24,"text":250,"correct":22},"粗细适度，步距大小适当",{"key":28,"text":252,"correct":26},"技术工艺先进",{"key":31,"text":254,"correct":26},"组织合理",{"key":34,"text":256,"correct":22},"计算方法简便，易于掌握",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":126,"analysis":37},52086,"与周转性材料消耗有关的因素包括()。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"材料一次使用量",{"key":24,"text":264,"correct":22},"材料周转次数",{"key":28,"text":266,"correct":22},"材料周转使用量",{"key":31,"text":268,"correct":22},"周转材料残值回收量",{"key":34,"text":270,"correct":26},"材料消耗量",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":82,"analysis":37},52087,"施工定额由()相对独立的部分组成。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"劳动定额",{"key":24,"text":278,"correct":22},"机械定额",{"key":28,"text":280,"correct":26},"取费定额",{"key":31,"text":282,"correct":26},"工器具定额",{"key":34,"text":284,"correct":22},"材料定额",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":184,"analysis":37},52088,"人工幅度差公式中包含()。",[289,291,293,295,297],{"key":20,"text":290,"correct":22},"基本用工",{"key":24,"text":292,"correct":22},"辅助用工",{"key":28,"text":294,"correct":22},"超运距用工",{"key":31,"text":296,"correct":26},"其他用工",{"key":34,"text":298,"correct":22},"人工幅度差系数",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":82,"analysis":37},52089,"下列建筑物的组成部分或构造措施中，应按其外墙勒脚以上结构外围水平面积、外墙上口外边线所围水平面积或水平投影面积的1／2计算建筑面积的有()。",[303,305,307,309,311],{"key":20,"text":304,"correct":22},"高度不足2.20m的单层建筑物",{"key":24,"text":306,"correct":22},"层高不足2.20m的半地下室",{"key":28,"text":308,"correct":26},"建筑物内的变形缝",{"key":31,"text":310,"correct":26},"建筑物通道",{"key":34,"text":312,"correct":22},"建筑物的阳台",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":184,"analysis":37},52090,"下列各项属于工程建设定额特点的有()。",[317,319,321,323,325],{"key":20,"text":318,"correct":22},"科学性",{"key":24,"text":320,"correct":22},"时效性",{"key":28,"text":322,"correct":22},"稳定性",{"key":31,"text":324,"correct":26},"多变性",{"key":34,"text":326,"correct":22},"系统性",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":214,"analysis":37},52091,"劳动定额的表现形式有( )。",[331,333,335,337,338],{"key":20,"text":332,"correct":26},"概算指标",{"key":24,"text":334,"correct":22},"时间定额",{"key":28,"text":336,"correct":22},"产量定额",{"key":31,"text":209,"correct":26},{"key":34,"text":339,"correct":26},"概算定额",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":354,"analysis":37},52092,"下列各项建筑组成部分中，不计算建筑面积的有()。",[344,346,348,350,352],{"key":20,"text":345,"correct":26},"阳台",{"key":24,"text":347,"correct":22},"用于检修、消防等的室外爬梯",{"key":28,"text":349,"correct":26},"地下室",{"key":31,"text":351,"correct":22},"突出外墙的构件、配件",{"key":34,"text":353,"correct":26},"室内楼梯间","BD",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":368,"analysis":37},52093,"按建筑自然层计算建筑面积的有()。",[359,360,362,364,366],{"key":20,"text":353,"correct":22},{"key":24,"text":361,"correct":22},"电梯井",{"key":28,"text":363,"correct":26},"室外爬梯",{"key":31,"text":365,"correct":22},"垃圾道",{"key":34,"text":367,"correct":22},"管道井","ABDE",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":97,"analysis":37},52094,"下列建筑物的组成部分中，属于不计算建筑面积范围的有( )。",[373,375,377,378,380],{"key":20,"text":374,"correct":26},"建筑物的外墙外侧保温层",{"key":24,"text":376,"correct":22},"屋顶水箱",{"key":28,"text":363,"correct":22},{"key":31,"text":379,"correct":22},"独立烟囱",{"key":34,"text":381,"correct":26},"建筑物内的管道井",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":396,"analysis":37},52095,"下列人工消耗量中，属于人工幅度差用工的有()。",[386,388,390,392,394],{"key":20,"text":387,"correct":26},"砌筑墙体工程的砌砖用工量",{"key":24,"text":389,"correct":26},"筛砂子的用工量",{"key":28,"text":391,"correct":22},"隐蔽工程验收影响的操作时间",{"key":31,"text":393,"correct":22},"土建工程与安装工程的交叉中不可避免的停歇时间",{"key":34,"text":395,"correct":26},"砌筑墙体工程的交叉中不可避免的停歇时间","CD",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":410,"analysis":37},52096,"下列各项建筑工程组成部分中，应计算全面积的有()。",[401,403,404,406,408],{"key":20,"text":402,"correct":22},"建筑物有围护结构的层高在2．20m以上的架空走廊",{"key":24,"text":312,"correct":26},{"key":28,"text":405,"correct":26},"有永久顶盖无围护结构的层高在2．20m以上的车棚",{"key":31,"text":407,"correct":22},"层高在2．20m以上的大厅",{"key":34,"text":409,"correct":26},"宽度超过2．10m的雨棚","AD",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":126,"analysis":37},52101,"分部分项工程量清单包括()。",[415,417,419,421,423],{"key":20,"text":416,"correct":22},"项目编码",{"key":24,"text":418,"correct":22},"项目名称",{"key":28,"text":420,"correct":22},"计量单位",{"key":31,"text":422,"correct":22},"工程量",{"key":34,"text":424,"correct":26},"工程量计算规则",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":97,"analysis":37},52102,"工程量清单的主要组成部分有()。",[429,431,433,435,437],{"key":20,"text":430,"correct":26},"分部分项工程量清单计价表",{"key":24,"text":432,"correct":22},"分部分项工程量清单",{"key":28,"text":434,"correct":22},"措施项目清单",{"key":31,"text":436,"correct":22},"其他项目清单",{"key":34,"text":438,"correct":26},"计算规则",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":453,"analysis":37},52103,"下列关于工程价款的调整,说法正确的是( )。",[443,445,447,449,451],{"key":20,"text":444,"correct":22},"招标工程在投标截止日前28天之后因国家法律、法规发生变化影响到工程造价的，应按规定调整合同价款。",{"key":24,"text":446,"correct":26},"若施工图纸与工程量清单项目特征描述不符，应按工程量清单项目特征确定的综合单价结算",{"key":28,"text":448,"correct":26},"因不可抗力事件导致的第三方人员伤亡，由承包人承担责任",{"key":31,"text":450,"correct":26},"因不可抗力事件导致的施工现场清理费用，由承包人承担",{"key":34,"text":452,"correct":22},"若施工期内市场价格波动超出一定幅度时，应按合同约定调整工程价款","AE",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":229,"analysis":37},52104,"下列各项费用中，属于规费项目清单内容的有()。",[458,460,462,464,466],{"key":20,"text":459,"correct":22},"工程排污费",{"key":24,"text":461,"correct":26},"总承包服务费",{"key":28,"text":463,"correct":22},"社会保障费",{"key":31,"text":465,"correct":26},"教育费附加",{"key":34,"text":467,"correct":22},"住房公积金",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":482,"analysis":37},52106,"下列成本费用中，可以列入工程成本的有( )。",[472,474,476,478,480],{"key":20,"text":473,"correct":26},"企业赞助支出",{"key":24,"text":475,"correct":26},"对外投资支出",{"key":28,"text":477,"correct":26},"违约金支出",{"key":31,"text":479,"correct":22},"其他直接费用",{"key":34,"text":481,"correct":22},"周转材料摊销","DE",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":97,"analysis":37},52118,"工程成本可分为()。",[487,489,491,493,495],{"key":20,"text":488,"correct":26},"实际成本降低额",{"key":24,"text":490,"correct":22},"计划成本",{"key":28,"text":492,"correct":22},"实际成本",{"key":31,"text":494,"correct":22},"预算成本",{"key":34,"text":496,"correct":26},"概算成本",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":36,"analysis":37},52119,"量本利分析法中的保本点是指()。",[501,503,505,507,509],{"key":20,"text":502,"correct":22},"预算成本线与实际成本线的交点",{"key":24,"text":504,"correct":26},"固定成本线与变动成本线的交点",{"key":28,"text":506,"correct":22},"工程成本盈亏分界点",{"key":31,"text":508,"correct":26},"预算成本线的起点",{"key":34,"text":510,"correct":26},"实际成本线的起点",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":82,"analysis":37},52120,"成本核算的作用有()。",[515,517,519,521,523],{"key":20,"text":516,"correct":22},"反映施工项目各项费用的支出，严格遵守成本计算规则",{"key":24,"text":518,"correct":22},"分配和归集各种生产费用，计算施工项目的实际成本",{"key":28,"text":520,"correct":26},"是增加利润的重要途径",{"key":31,"text":522,"correct":26},"是落实成本责任制的依据",{"key":34,"text":524,"correct":22},"反映本计划的执行情况，为挖掘降低成本的潜力提供可靠的资料",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":214,"analysis":37},52121,"在利用因素分析法进行分析时，一定要按构成因素的顺序依次替代，一般应()。",[529,531,533,535,537],{"key":20,"text":530,"correct":26},"先计算次要因素，后计算主要因素",{"key":24,"text":532,"correct":22},"先变动数量指标，后变动质量指标",{"key":28,"text":534,"correct":22},"先计算主要因素，后计算次要因素",{"key":31,"text":536,"correct":26},"先变动质量指标，后变动数量指标",{"key":34,"text":538,"correct":26},"先计算外部因素，后计算内部因素",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":214,"analysis":37},52122,"工程成本管理要求划分好本期成本与下期成本的界限，为此需要遵循的会计原则有（ ）。",[543,545,547,549,551],{"key":20,"text":544,"correct":26},"历史成本原则",{"key":24,"text":546,"correct":22},"成本与收入配比原则",{"key":28,"text":548,"correct":22},"责权发生制原则",{"key":31,"text":550,"correct":26},"可比性原则",{"key":34,"text":552,"correct":26},"一贯性原则",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":566,"analysis":37},52123,"影响工程成本的因素有()。",[557,558,560,562,564],{"key":20,"text":422,"correct":22},{"key":24,"text":559,"correct":26},"物资预算定额含量",{"key":28,"text":561,"correct":26},"活劳动预算定额含量",{"key":31,"text":563,"correct":22},"完成单位工程量的物资和活劳动消耗数量",{"key":34,"text":565,"correct":22},"物资和活劳动的单价","ADE",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":581,"analysis":37},52124,"工程直接成本包括()。",[571,573,575,577,579],{"key":20,"text":572,"correct":22},"人工费",{"key":24,"text":574,"correct":22},"材料费",{"key":28,"text":576,"correct":22},"机械使用费",{"key":31,"text":578,"correct":26},"劳动保护费",{"key":34,"text":580,"correct":26},"施工单位管理人员工资和奖金","ABC",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":52,"analysis":37},52125,"工程成本管理的基础工作主要指()。",[586,588,590,592,594],{"key":20,"text":587,"correct":26},"技术节约措施",{"key":24,"text":589,"correct":22},"定额管理",{"key":28,"text":591,"correct":26},"压缩成本支出",{"key":31,"text":593,"correct":22},"材料物资的计量、验收和保管",{"key":34,"text":595,"correct":22},"各项原始记录",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":67,"analysis":37},52126,"下列费用中，属于工程成本范围的有( )。",[600,602,604,606,608],{"key":20,"text":601,"correct":22},"周转材料摊销费",{"key":24,"text":603,"correct":22},"周转材料租赁费",{"key":28,"text":605,"correct":26},"施工机械购置费",{"key":31,"text":607,"correct":22},"施工机械台班费",{"key":34,"text":609,"correct":26},"银行贷款利息",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":82,"analysis":37},52127,"施工过程中控制工程成本的方法主要有()",[614,616,618,620,622],{"key":20,"text":615,"correct":22},"编制并落实工程成本计划",{"key":24,"text":617,"correct":22},"建立月度资金收支计划管理制度",{"key":28,"text":619,"correct":26},"控制投标报价的让利幅度",{"key":31,"text":621,"correct":26},"及时办理经济技术签证",{"key":34,"text":623,"correct":22},"实施施工成本跟踪考核",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":199,"analysis":37},52128,"工程项目成本控制程序的环节有()。",[628,630,632,634,636],{"key":20,"text":629,"correct":22},"制定控制标准",{"key":24,"text":631,"correct":26},"建立控制制度",{"key":28,"text":633,"correct":22},"实施成本监督",{"key":31,"text":635,"correct":22},"确定成本差异",{"key":34,"text":637,"correct":22},"消除成本差异",{"id":639,"libraryId":5,"type":15,"typeLabel":16,"stem":640,"options":641,"answer":482,"analysis":37},52129,"工程成本核算应区分收益性支出和资本性支出。下列支出中，属于资本性支出的有（）。",[642,644,646,648,650],{"key":20,"text":643,"correct":26},"机械使用费支出",{"key":24,"text":645,"correct":26},"企业财务费支出",{"key":28,"text":647,"correct":26},"企业管理费用支出",{"key":31,"text":649,"correct":22},"购买无形资产的支出",{"key":34,"text":651,"correct":22},"更新固定资产的支出",{"id":653,"libraryId":5,"type":15,"typeLabel":16,"stem":654,"options":655,"answer":126,"analysis":37},52130,"在进行工程成本核算时，需要正确划分的成本费用的界限有()。",[656,658,660,662,664],{"key":20,"text":657,"correct":22},"工程成本与期间费用的界限",{"key":24,"text":659,"correct":22},"各个成本核算对象应负担的成本的界限",{"key":28,"text":661,"correct":22},"已完工程和未完工程的成本的界限",{"key":31,"text":663,"correct":22},"本期工程和不属于本期工程的成本的界限",{"key":34,"text":665,"correct":26},"变动成本和固定成本的界限",{"id":667,"libraryId":5,"type":15,"typeLabel":16,"stem":668,"options":669,"answer":680,"analysis":37},52132,"要保证工程成本的真实性和准确性，应()。",[670,672,674,676,678],{"key":20,"text":671,"correct":22},"努力提高业务人员的业务素质和思想素质",{"key":24,"text":673,"correct":26},"实行项目成本目标分解归口管理",{"key":28,"text":675,"correct":22},"加强业务部门之间的联系和协调",{"key":31,"text":677,"correct":22},"做好与成本有关的管理和消耗台账",{"key":34,"text":679,"correct":26},"落实项目目标成本责任制","ACD",{"id":682,"libraryId":5,"type":15,"typeLabel":16,"stem":683,"options":684,"answer":482,"analysis":37},52133,"下列成本费用中，可以列入工程成本的有()。",[685,686,687,688,689],{"key":20,"text":473,"correct":26},{"key":24,"text":475,"correct":26},{"key":28,"text":477,"correct":26},{"key":31,"text":479,"correct":22},{"key":34,"text":481,"correct":22},{"id":691,"libraryId":5,"type":15,"typeLabel":16,"stem":692,"options":693,"answer":368,"analysis":37},52134,"工程安全管理的基本原则包括( )。",[694,696,698,700,702],{"key":20,"text":695,"correct":22},"管理生产同时管理安全",{"key":24,"text":697,"correct":22},"坚持“四全”动态管理",{"key":28,"text":699,"correct":26},"坚持效益兼顾公平",{"key":31,"text":701,"correct":22},"在管理中发展提高",{"key":34,"text":703,"correct":22},"必须贯彻预防为主的方针",{"id":705,"libraryId":5,"type":15,"typeLabel":16,"stem":706,"options":707,"answer":718,"analysis":37},52140,"按住房和城乡建设部有关规定，工程项目施工现场专职安全生产管理人员配备的数量应综合考虑（ ）。",[708,710,712,714,716],{"key":20,"text":709,"correct":26},"企业资质等级",{"key":24,"text":711,"correct":22},"工程施工规模",{"key":28,"text":713,"correct":22},"项目安全风险",{"key":31,"text":715,"correct":22},"施工生产需要",{"key":34,"text":717,"correct":22},"设备管理需要","BCDE",{"id":720,"libraryId":5,"type":15,"typeLabel":16,"stem":721,"options":722,"answer":566,"analysis":37},52145,"下列关于工程质量事故的报告，说法正确的是()。",[723,725,727,729,731],{"key":20,"text":724,"correct":22},"较大、重大及特别重大事故逐级上报至国务院住房和城乡建设主管部门",{"key":24,"text":726,"correct":26},"工程质量事故发生后，事故现场有关人员应当立即向监理工程师报告",{"key":28,"text":728,"correct":26},"住房和城乡建设主管部门逐级上报事故情况时，每级上报时间不得超过1小时",{"key":31,"text":730,"correct":22},"事故报告后出现新情况，以及事故发生之日起30日内伤亡人数发生变化的，应当及时补报",{"key":34,"text":732,"correct":22},"住房和城乡建设主管部门上报事故情况，应当同时报告本级人民政府",[734,738,741,744,747,749],{"id":735,"name":736,"category":7,"favorite":737},109,"发布证券研究报告业务",1,{"id":739,"name":740,"category":7,"favorite":8},30,"经济师",{"id":742,"name":743,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":745,"name":746,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":748,"category":7,"favorite":8},"(初级)保险专业",{"id":750,"name":751,"category":7,"favorite":8},51,"(初级)财政税收"]