[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":712},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,35,50,2220,[13,38,53,67,82,97,112,126,140,155,164,179,192,201,215,224,238,247,261,276,291,306,321,335,349,364,378,387,402,416,430,445,460,474,489,501,515,529,544,558,572,586,600,614,628,642,656,671,685,699],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},51985,2,"多选题","根据我国《建筑法》，下列单位中，需要取得相应资质才能从事相应建筑活动的有()。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","材料供货单位",false,{"key":24,"text":25,"correct":26},"B","工程监理单位",true,{"key":28,"text":29,"correct":26},"C","勘察单位",{"key":31,"text":32,"correct":22},"D","建设单位",{"key":34,"text":35,"correct":26},"E","设计单位","BCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},51986,"根据《建筑业企业资质管理规定》，建筑企业资质包括()等序列。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"设计施工总承包",{"key":24,"text":45,"correct":26},"施工总承包",{"key":28,"text":47,"correct":22},"施工分包",{"key":31,"text":49,"correct":26},"专业承包",{"key":34,"text":51,"correct":26},"劳务分包","BDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":36,"analysis":37},51987,"下列条件中，属于领取建筑工程施工许可证必备条件的有()。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"完成了项目可行性报告",{"key":24,"text":60,"correct":26},"取得了建设工程规划许可证",{"key":28,"text":62,"correct":26},"已经办理了建筑工程用地批准手续",{"key":31,"text":64,"correct":22},"取得了建设工程销售许可证",{"key":34,"text":66,"correct":26},"有保证工程质量和安全的具体措施",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},51988,"具有个人执业资格的建设工程专业人员履行执业职责时，需要在工作成果文件上()。",[71,73,75,77,79],{"key":20,"text":72,"correct":26},"签字",{"key":24,"text":74,"correct":22},"接受委托方签字",{"key":28,"text":76,"correct":26},"加盖执业专用章",{"key":31,"text":78,"correct":22},"接受公证机构签字",{"key":34,"text":80,"correct":22},"接受执业保险机构签章","AC",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},51993,"组织论是一门学科，它主要研究系统的( )。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"组织结构模式",{"key":24,"text":89,"correct":26},"组织分工",{"key":28,"text":91,"correct":26},"工作流程组织",{"key":31,"text":93,"correct":22},"职能组织结构",{"key":34,"text":95,"correct":22},"管理职能分工","ABC",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},51994,"下列关于合作体和联合体的陈述中，正确的有( )。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"合作体在合同结构上与联合体不一样",{"key":24,"text":104,"correct":22},"联合体中任何一家公司倒闭，其他成员不必承担其经济责任",{"key":28,"text":106,"correct":26},"联合体是一种临时性的组织",{"key":31,"text":108,"correct":26},"合作体各方都没有足够的力量完成特定的任务",{"key":34,"text":110,"correct":26},"合作体各方按照合同约定各自承担民事责任","CDE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":125,"analysis":37},51995,"建设项目工程总承包的方式主要有( )。",[116,118,120,121,123],{"key":20,"text":117,"correct":26},"设计-施工总承包",{"key":24,"text":119,"correct":22},"采购施工总承包",{"key":28,"text":45,"correct":22},{"key":31,"text":122,"correct":22},"勘察设计总承包",{"key":34,"text":124,"correct":26},"设计采购施工总承包","AE",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":96,"analysis":37},51996,"在下列建设工程项目实施的阶段中，属于设计阶段建设监理工作的有( )。",[130,132,134,136,138],{"key":20,"text":131,"correct":26},"编制设计要求文件",{"key":24,"text":133,"correct":26},"拟订和商谈设计委托合同",{"key":28,"text":135,"correct":26},"参与设计协调工作",{"key":31,"text":137,"correct":22},"做好记录、协调、检查、分析工作",{"key":34,"text":139,"correct":22},"做好动态控制工作，保证质量目标、进度目标、造价目标、安全目标、节约目标的实现",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":154,"analysis":37},51997,"设计阶段投资控制的主要工作包括( )。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"在可行性研究的基础上，进行项目总投资目标的分析和论证",{"key":24,"text":147,"correct":26},"审核施工图预算，必要时调整总投资计划",{"key":28,"text":149,"correct":26},"编制项目总投资分解规划，并在设计过程中控制其执行",{"key":31,"text":151,"correct":26},"采用价值工程方法，在充分满足功能的条件考虑进一步挖掘节约投资的潜力",{"key":34,"text":153,"correct":22},"审核招标文件和合同文件中有关投资的条款","BCD",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":96,"analysis":37},51999,"在下列建设工程项目实施的阶段中，属于设计阶段建设监理工作的有()。",[159,160,161,162,163],{"key":20,"text":131,"correct":26},{"key":24,"text":133,"correct":26},{"key":28,"text":135,"correct":26},{"key":31,"text":137,"correct":22},{"key":34,"text":139,"correct":22},{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":178,"analysis":37},52000,"为确保某在建的超高层建筑施工过程的安全，建设项目参与各方面都采取了积极的安全控制措施。下列工作中，属于施工方安全控制的有（）。",[168,170,172,174,176],{"key":20,"text":169,"correct":26},"检查各类施工持证上岗人员的资格",{"key":24,"text":171,"correct":26},"施工作业人员操作前，组织安全技术交底",{"key":28,"text":173,"correct":22},"申领施工许可证",{"key":31,"text":175,"correct":26},"依法办理从事危险作业职工的意外伤害保险",{"key":34,"text":177,"correct":26},"对施工工程中的洞口、临边、高空作业采取安全防护措施","ABDE",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":154,"analysis":37},52001,"下列工作中，属于业主方设计阶段投资控制主要工作的有()。",[183,185,186,188,190],{"key":20,"text":184,"correct":22},"编写设计任务书中有关投资控制的内容",{"key":24,"text":149,"correct":26},{"key":28,"text":187,"correct":26},"审核项目总概算，在总概算内进行设计深化",{"key":31,"text":189,"correct":26},"采用价值工程方法，在充分满足项目功能的条件下考虑进一步挖掘节约投资的潜力",{"key":34,"text":191,"correct":22},"审核各类工程付款和材料设备采购款的支付申请",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":154,"analysis":37},52002,"设计阶段投资控制的主要工作包括()。",[196,197,198,199,200],{"key":20,"text":145,"correct":22},{"key":24,"text":147,"correct":26},{"key":28,"text":149,"correct":26},{"key":31,"text":151,"correct":26},{"key":34,"text":153,"correct":22},{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":178,"analysis":37},52003,"建设工程监理工作性质的特点有( )。",[205,207,209,211,213],{"key":20,"text":206,"correct":26},"服务性",{"key":24,"text":208,"correct":26},"科学性",{"key":28,"text":210,"correct":22},"经济性",{"key":31,"text":212,"correct":26},"独立性",{"key":34,"text":214,"correct":26},"公正性",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":125,"analysis":37},52004,"建设项目工程总承包的方式主要有()。",[219,220,221,222,223],{"key":20,"text":117,"correct":26},{"key":24,"text":119,"correct":22},{"key":28,"text":45,"correct":22},{"key":31,"text":122,"correct":22},{"key":34,"text":124,"correct":26},{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":52,"analysis":37},52005,"某市要新建一个体育馆，向全社会公开招标。一家擅长大跨度钢结构施工和吊装的施工单位，与一家擅长体育馆设计的设计单位组成联合体投标，并最后中标。关于该项目的说法，正确的有（）。",[228,230,232,234,236],{"key":20,"text":229,"correct":22},"该项目采用的施工平行发包模式",{"key":24,"text":231,"correct":26},"该项目采用的是建设项目工程总承包模式",{"key":28,"text":233,"correct":22},"设计单位应按合同的约定对项目设计的进度、质量等向施工单位负责",{"key":31,"text":235,"correct":26},"施工单位可以将该项目的幕墙工程发包给具有相应资质的幕墙专业工程施工单位",{"key":34,"text":237,"correct":26},"设计与施工过程的组成集成，有利于促进设计与施工的紧密结合，以达到项目建设增值的目的。",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":111,"analysis":37},52006,"下列关于合作体和联合体的陈述中，正确的有()。",[242,243,244,245,246],{"key":20,"text":102,"correct":22},{"key":24,"text":104,"correct":22},{"key":28,"text":106,"correct":26},{"key":31,"text":108,"correct":26},{"key":34,"text":110,"correct":26},{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":36,"analysis":37},52007,"关于施工平行发包的特点，下列说法正确的有()。",[251,253,255,257,259],{"key":20,"text":252,"correct":22},"业主合同管理工作量较小",{"key":24,"text":254,"correct":26},"对业主而言，要等最后一份合同签订后才知道整个工程的总投资",{"key":28,"text":256,"correct":26},"可缩短建设周期",{"key":31,"text":258,"correct":22},"不符合质量控制上的“他人控制”原则",{"key":34,"text":260,"correct":26},"业主要承担类似于施工总承包管理的角色",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":275,"analysis":37},52008,"关于工程项目内涵的说法，正确的有()。",[265,267,269,271,273],{"key":20,"text":266,"correct":26},"工程项目是将投资转化为固定资产的经济活动过程",{"key":24,"text":268,"correct":26},"工程项目是一种既有投资行为又有建设行为的项目",{"key":28,"text":270,"correct":22},"工程项目在经济上实行统一核算，行政上实行独立管理",{"key":31,"text":272,"correct":22},"主体工程与其附属配套工程分期建设的，属于两个工程项目",{"key":34,"text":274,"correct":26},"工程项目是指为了特定目标而进行的投资建设活动","ABE",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":290,"analysis":37},52009,"不能称做“项目”的生产活动及其成果的特性有()。",[280,282,284,286,288],{"key":20,"text":281,"correct":26},"大批量的",{"key":24,"text":283,"correct":22},"单件性的",{"key":28,"text":285,"correct":22},"投资一次性的",{"key":31,"text":287,"correct":26},"重复的",{"key":34,"text":289,"correct":26},"资源浪费的","ADE",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":305,"analysis":37},52010,"建设项目在建设中实行()。",[295,297,299,301,303],{"key":20,"text":296,"correct":22},"统一分配",{"key":24,"text":298,"correct":26},"统一核算",{"key":28,"text":300,"correct":22},"统一招标",{"key":31,"text":302,"correct":22},"统一安排",{"key":34,"text":304,"correct":26},"统一管理","BE",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":320,"analysis":37},52011,"建设项目投资决策阶段形成的成果有( )。",[310,312,314,316,318],{"key":20,"text":311,"correct":22},"项目总体规划设计",{"key":24,"text":313,"correct":22},"建设工程规划许可",{"key":28,"text":315,"correct":26},"项目建议书",{"key":31,"text":317,"correct":26},"可行性研究报告",{"key":34,"text":319,"correct":22},"项目设计任务书","CD",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":96,"analysis":37},52012,"总体规划设计要求可以在()中载明。",[325,327,329,331,333],{"key":20,"text":326,"correct":26},"建设项目选址意见书",{"key":24,"text":328,"correct":26},"核发的规划设计要求",{"key":28,"text":330,"correct":26},"土地批租时的土地出让合同文本",{"key":31,"text":332,"correct":22},"建设工程规划许可证",{"key":34,"text":334,"correct":22},"建设工程施工许可证",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":125,"analysis":37},52013,"建设项目配套建设申请包括()。",[339,341,343,345,347],{"key":20,"text":340,"correct":26},"建设项目供电申请",{"key":24,"text":342,"correct":22},"建设项目市容环境卫生申请",{"key":28,"text":344,"correct":22},"河道管理范围内的建设项目申请",{"key":31,"text":346,"correct":22},"建设项目民防设施申请",{"key":34,"text":348,"correct":26},"建设项目道路管线掘路申请",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":363,"analysis":37},52014,"在网络平台上进行项目管理，工作的主要内容是围绕工程项目信息处理进行的一些任务，概括起来可以分为()。",[353,355,357,359,361],{"key":20,"text":354,"correct":26},"文档管理",{"key":24,"text":356,"correct":22},"合同管理",{"key":28,"text":358,"correct":26},"信息沟通",{"key":31,"text":360,"correct":22},"信息共享",{"key":34,"text":362,"correct":26},"协同工作","ACE",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":36,"analysis":37},52015,"监理工程师对建设工程施工过程实施监理的主要形式有（）。",[368,370,372,374,376],{"key":20,"text":369,"correct":22},"颁发证书",{"key":24,"text":371,"correct":26},"巡视检查",{"key":28,"text":373,"correct":26},"施工旁站",{"key":31,"text":375,"correct":22},"图纸会审",{"key":34,"text":377,"correct":26},"平行检查",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":96,"analysis":37},52016,"组织论是一门学科，它主要研究系统的()。",[382,383,384,385,386],{"key":20,"text":87,"correct":26},{"key":24,"text":89,"correct":26},{"key":28,"text":91,"correct":26},{"key":31,"text":93,"correct":22},{"key":34,"text":95,"correct":22},{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":401,"analysis":37},52017,"关于建设项目相关专业专项审查的说法，正确的有（）。",[391,393,395,397,399],{"key":20,"text":392,"correct":26},"专业专项审查包括项目市容环境卫生审查和消防审查",{"key":24,"text":394,"correct":26},"专业专项审查一般从设计进行",{"key":28,"text":396,"correct":22},"专业专项审查只需在施工阶段进行",{"key":31,"text":398,"correct":26},"专业专项审查包括项目抗震设防审查",{"key":34,"text":400,"correct":22},"专业专项审查只需在竣工阶段进行","ABD",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":290,"analysis":37},52028,"下列选项中，属于工程进度管理组织措施的有()。",[406,408,410,412,414],{"key":20,"text":407,"correct":26},"建立进度管理工作制度",{"key":24,"text":409,"correct":22},"采取加快工程进度的施工方法",{"key":28,"text":411,"correct":22},"合同工期与进度计划的协调",{"key":31,"text":413,"correct":26},"确定进度目标及责任落实",{"key":34,"text":415,"correct":26},"分析影响进度目标实现的风险因素",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":275,"analysis":37},52029,"工程施工中组织流水作业可以带来的经济效果有()。",[420,422,424,426,428],{"key":20,"text":421,"correct":26},"缩短工期",{"key":24,"text":423,"correct":26},"提高劳动生产效率",{"key":28,"text":425,"correct":22},"节省劳动力",{"key":31,"text":427,"correct":22},"减少材料用量",{"key":34,"text":429,"correct":26},"降低工程成本",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":444,"analysis":37},52030,"流水施工的基本方式有()。",[434,436,438,440,442],{"key":20,"text":435,"correct":26},"全等节拍流水施工",{"key":24,"text":437,"correct":22},"特定节拍流水施工",{"key":28,"text":439,"correct":26},"成倍节拍流水施工",{"key":31,"text":441,"correct":26},"分别流水施工",{"key":34,"text":443,"correct":22},"均匀节拍流水施工","ACD",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":459,"analysis":37},52031,"流水施工组织方式具有的特点有()。",[449,451,453,455,457],{"key":20,"text":450,"correct":26},"充分利用工作面，施工工期较短",{"key":24,"text":452,"correct":26},"为文明施工和进行现场的科学管理创造有利条件",{"key":28,"text":454,"correct":26},"专业队及其工人能连续作业",{"key":31,"text":456,"correct":26},"有利于资源供应的组织工作",{"key":34,"text":458,"correct":22},"具有很好的稳定性和时效性","ABCD",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":178,"analysis":37},52032,"在工程实施过程中，进度拖延的原因通常有()。",[464,466,468,470,472],{"key":20,"text":465,"correct":26},"制定工期及相关计划的失误",{"key":24,"text":467,"correct":26},"工程变更",{"key":28,"text":469,"correct":22},"未采取加快进度的技术措施",{"key":31,"text":471,"correct":26},"管理过程中的失误",{"key":34,"text":473,"correct":26},"资金不到位和停工待料",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":488,"analysis":37},52033,"为保证工程项目进度目标的顺利实现，应开展的主要工作有()。",[478,480,482,484,486],{"key":20,"text":479,"correct":26},"检查各层次的进度计划，形成严密的计划保证系统",{"key":24,"text":481,"correct":22},"控制外部环境和条件变化",{"key":28,"text":483,"correct":26},"签订责任状",{"key":31,"text":485,"correct":26},"做好工程进度记录、填写工程进度统计表",{"key":34,"text":487,"correct":26},"做好工程建设中的调度工作","ACDE",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":363,"analysis":37},52034,"下列措施中，属于进度管理合同措施的有()。",[493,495,496,498,499],{"key":20,"text":494,"correct":26},"实行分段设计、分段发包、分段施工、缩短建设工期",{"key":24,"text":407,"correct":22},{"key":28,"text":497,"correct":26},"协调合同工期与进度计划的关系",{"key":31,"text":413,"correct":22},{"key":34,"text":500,"correct":26},"加强索赔管理",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":125,"analysis":37},52035,"进行工程项目进度管理的意义在于可以使工程项目()。",[505,507,509,511,513],{"key":20,"text":506,"correct":26},"按预定时间交付使用，及时发挥投资效益",{"key":24,"text":508,"correct":22},"以最快的速度完成，获得最大的投资收益",{"key":28,"text":510,"correct":22},"以最快的速度完成，使工程成本最低",{"key":31,"text":512,"correct":22},"资源需要量大大减少，使工程总成本最低",{"key":34,"text":514,"correct":26},"资源得到合理安排，降低工程成本",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":275,"analysis":37},52036,"根据工程项目计划管理的需要，工程项目进度计划应包括()。",[519,521,523,525,527],{"key":20,"text":520,"correct":26},"工程项目年度计划",{"key":24,"text":522,"correct":26},"工程项目前期工作计划",{"key":28,"text":524,"correct":22},"成本控制计划",{"key":31,"text":526,"correct":22},"资源安排计划、",{"key":34,"text":528,"correct":26},"工程项目建设总进度计划",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":543,"analysis":37},52037,"工程进度计划的主要作用有()。",[533,535,537,539,541],{"key":20,"text":534,"correct":26},"为工程项目实施过程中的进度控制提供依据、指南",{"key":24,"text":536,"correct":26},"为工程项目实施过程中的劳动力和各种资源配置提供依据",{"key":28,"text":538,"correct":26},"为工程项目实施有关各方在时间上的协调配合提供依据",{"key":31,"text":540,"correct":22},"为实现最短的建设周期提供保障",{"key":34,"text":542,"correct":26},"为高效地完成工程建设提供保障","ABCE",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":154,"analysis":37},52038,"与运用横道图编制进度计划相比，运用网络图编制进度计划的优越性主要有（）。",[548,550,552,554,556],{"key":20,"text":549,"correct":22},"编制方法简单明了",{"key":24,"text":551,"correct":26},"能全面清洗的表达各项工作之间相互制约、相互依赖的关系。",{"key":28,"text":553,"correct":26},"可采用计算机技术及相关软件对进度计划实行动态管理",{"key":31,"text":555,"correct":26},"能够进行各种时间参数的计算并对进度计划进行优化",{"key":34,"text":557,"correct":22},"可形象直接地反映进度与资源消耗量之间的关系",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":36,"analysis":37},52039,"施工段是表达流水施工的空间参数。合理划分施工段的基本要求有()。",[562,564,566,568,570],{"key":20,"text":563,"correct":22},"每个施工过程在各个施工段上的劳动量均应相等",{"key":24,"text":565,"correct":26},"施工段的分界线应尽可能设在对结构整体性影响较小的部位",{"key":28,"text":567,"correct":26},"每个施工段要有足够的工作面，以充分发挥专业工人和机械设备的生产效率",{"key":31,"text":569,"correct":22},"每个施工段要有足够的工作面，以满足同一施工段内组织多个专业工作队同时施工的要求",{"key":34,"text":571,"correct":26},"施工段的数目应与主导施工过程相协调",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":36,"analysis":37},52040,"在确定流水步距时应遵循的原则是()。",[576,578,580,582,584],{"key":20,"text":577,"correct":22},"流水步距应为常数",{"key":24,"text":579,"correct":26},"保证工程质量、满足安全生产要求",{"key":28,"text":581,"correct":26},"每个专业队均能连续施工",{"key":31,"text":583,"correct":22},"各个专业工作队的人员必须相等",{"key":34,"text":585,"correct":26},"满足施工顺序要求",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":363,"analysis":37},52041,"工程实际进度与计划进度的比较方法主要有( )。",[590,592,594,596,598],{"key":20,"text":591,"correct":26},"横道图比较法",{"key":24,"text":593,"correct":22},"直方图比较法",{"key":28,"text":595,"correct":26},"S型曲线比较法",{"key":31,"text":597,"correct":22},"工程预算比较法",{"key":34,"text":599,"correct":26},"网络计划图上比较法",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":52,"analysis":37},52045,"下列关于质量管理的说法中，符合工程质量管理原则的有( )。",[604,606,608,610,612],{"key":20,"text":605,"correct":22},"工程施工以追求多快好省为原则",{"key":24,"text":607,"correct":26},"质量第一，好中求快，好中求省",{"key":28,"text":609,"correct":22},"依靠检查，保证工程质量",{"key":31,"text":611,"correct":26},"一切用数据说话，掌握提高工程质量的客观规律",{"key":34,"text":613,"correct":26},"树立为用户服务的思想，保证工程质量",{"id":615,"libraryId":5,"type":15,"typeLabel":16,"stem":616,"options":617,"answer":543,"analysis":37},52051,"工程施工组织设计中主要包括( )。",[618,620,622,624,626],{"key":20,"text":619,"correct":26},"施工程序、施工顺序",{"key":24,"text":621,"correct":26},"保证质量、安全生产",{"key":28,"text":623,"correct":26},"季节性施工",{"key":31,"text":625,"correct":22},"进度保证及现场管理",{"key":34,"text":627,"correct":26},"防止环境污染",{"id":629,"libraryId":5,"type":15,"typeLabel":16,"stem":630,"options":631,"answer":178,"analysis":37},52054,"工程质量通常体现在()方面。",[632,634,636,638,640],{"key":20,"text":633,"correct":26},"适用性",{"key":24,"text":635,"correct":26},"可靠性",{"key":28,"text":637,"correct":22},"时效性",{"key":31,"text":639,"correct":26},"外观质量",{"key":34,"text":641,"correct":26},"环境协调",{"id":643,"libraryId":5,"type":15,"typeLabel":16,"stem":644,"options":645,"answer":363,"analysis":37},52055,"工程质量的特点有()。",[646,648,650,652,654],{"key":20,"text":647,"correct":26},"影响因素多和质量波动大",{"key":24,"text":649,"correct":22},"工程造价大和施工周期长",{"key":28,"text":651,"correct":26},"质量变异大和质量隐蔽性",{"key":31,"text":653,"correct":22},"工程使用寿命长",{"key":34,"text":655,"correct":26},"最终检验局限大",{"id":657,"libraryId":5,"type":15,"typeLabel":16,"stem":658,"options":659,"answer":670,"analysis":37},52056,"除人的因素外，影响工程质量的主要因素还包括（）。",[660,662,664,666,668],{"key":20,"text":661,"correct":22},"建筑市场",{"key":24,"text":663,"correct":26},"工艺施工方法",{"key":28,"text":665,"correct":26},"材料设备构件",{"key":31,"text":667,"correct":26},"施工机械设备",{"key":34,"text":669,"correct":26},"工程环境","BCDE",{"id":672,"libraryId":5,"type":15,"typeLabel":16,"stem":673,"options":674,"answer":178,"analysis":37},52057,"工程质量管理应遵循的原则有（）。",[675,677,679,681,683],{"key":20,"text":676,"correct":26},"质量第一",{"key":24,"text":678,"correct":26},"预防为主",{"key":28,"text":680,"correct":22},"优质优价",{"key":31,"text":682,"correct":26},"为用户服务",{"key":34,"text":684,"correct":26},"一切用数据说话",{"id":686,"libraryId":5,"type":15,"typeLabel":16,"stem":687,"options":688,"answer":670,"analysis":37},52058,"下列()是建设工程竣工验收必须具备的条件。",[689,691,693,695,697],{"key":20,"text":690,"correct":22},"有业主签署的工程保修书",{"key":24,"text":692,"correct":26},"有完整的技术档案和施工管理材料",{"key":28,"text":694,"correct":26},"有工程使用的主要建筑材料的进场试验报告",{"key":31,"text":696,"correct":26},"完成了建设工程设计和合同约定的各项内容",{"key":34,"text":698,"correct":26},"有设计单位签署的质量合格文件",{"id":700,"libraryId":5,"type":15,"typeLabel":16,"stem":701,"options":702,"answer":711,"analysis":37},52059,"施工单位在隐蔽工程隐蔽前，应当通知()。",[703,705,706,708,709],{"key":20,"text":704,"correct":26},"质量监督机构",{"key":24,"text":32,"correct":26},{"key":28,"text":707,"correct":22},"质量检测机构",{"key":31,"text":35,"correct":22},{"key":34,"text":710,"correct":22},"政府主管部门","AB",[713,717,720,723,726,728],{"id":714,"name":715,"category":7,"favorite":716},109,"发布证券研究报告业务",1,{"id":718,"name":719,"category":7,"favorite":8},30,"经济师",{"id":721,"name":722,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":724,"name":725,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":727,"category":7,"favorite":8},"(初级)保险专业",{"id":729,"name":730,"category":7,"favorite":8},51,"(初级)财政税收"]