[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,33,50,2220,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,201,213,223,235,247,256,268,280,292,304,316,328,340,352,364,374,383,391,402,411,423,432,444,456,468,480,492,504,516,528,538,550,562,574,586],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},51858,1,"单选题","工程造价管理的原则之一是推行以（ ）为重点的全过程造价控制。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","设计阶段",true,{"key":24,"text":25,"correct":26},"B","投资决策阶段",false,{"key":28,"text":29,"correct":26},"C","招投标阶段",{"key":31,"text":32,"correct":26},"D","施工阶段","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},51859,"把灰浆泵由一个工作地点转移到另一个工作地点时的工作中断时间，属于机械工作时间消耗中的（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"多余工作时间",{"key":24,"text":41,"correct":26},"低负荷下的工作时间",{"key":28,"text":43,"correct":26},"不可避免的无负荷工作时间",{"key":31,"text":45,"correct":22},"不可避免的中断工作时间",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},51860,"下列工人工作时间中，属于有效工作时间的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"辅助工作时间",{"key":24,"text":53,"correct":26},"休息时间",{"key":28,"text":55,"correct":26},"多余时间",{"key":31,"text":57,"correct":26},"偶然时间",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},51861,"工人工作时间中的休息时间属于（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"停工时间",{"key":24,"text":65,"correct":26},"不可避免中断时间",{"key":28,"text":67,"correct":22},"必需消耗的时间",{"key":31,"text":69,"correct":26},"损失时间",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},51862,"编制施工定额时，应遵循（ ）的原则。",[74,76,78,80],{"key":20,"text":75,"correct":26},"地区先进",{"key":24,"text":77,"correct":26},"企业先进",{"key":28,"text":79,"correct":26},"行业先进",{"key":31,"text":81,"correct":22},"平均先进",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},51863,"工人必需消耗的工作时间包括有效工作时间、不可避免的中断时间和（ ）时间。",[86,88,90,92],{"key":20,"text":87,"correct":22},"休息",{"key":24,"text":89,"correct":26},"多余",{"key":28,"text":91,"correct":26},"偶然",{"key":31,"text":93,"correct":26},"停工",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},51864,"下列工程进度控制的措施中，属于进度控制合同措施的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"编制进度计划和进度控制工作流程",{"key":24,"text":101,"correct":26},"建立工期超前或延误的奖惩制度",{"key":28,"text":103,"correct":22},"选用适当的工程发承包模式",{"key":31,"text":105,"correct":26},"分析比较实际进度与计划进度",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},51865,"收集工程实际进度的有关数据、资料，经加工整理后与计划进度进行比较，提供进度比较分析报告，这是进度控制措施中的（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"组织措施",{"key":24,"text":113,"correct":26},"技术措施",{"key":28,"text":115,"correct":22},"信息管理措施",{"key":31,"text":117,"correct":26},"经济措施",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},51866,"工程施工可以根据施工特点采用不同的施工组织方式，其中有利于资源供应的组织方式是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"平行施工和搭接施工",{"key":24,"text":125,"correct":26},"平行施工和依次施工",{"key":28,"text":127,"correct":22},"依次施工和流水施工",{"key":31,"text":129,"correct":26},"流水施工和平行施工",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},51867,"流水作业的组织方式通常被建设工程施工所采用，是因其具有（ ）的特点。",[134,136,138,140],{"key":20,"text":135,"correct":26},"单位时间内所投入的资源量相同",{"key":24,"text":137,"correct":22},"各专业工作队能够连续施工",{"key":28,"text":139,"correct":26},"施工现场的组织和管理工作简单",{"key":31,"text":141,"correct":26},"与依次施工作业的工期相同",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},51868,"依次施工组织方式的特点是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"单位时间内投入的资源量相等",{"key":24,"text":149,"correct":26},"能充分利用工作面，缩短工期",{"key":28,"text":151,"correct":26},"能提高劳动生产效率",{"key":31,"text":153,"correct":22},"施工现场组织、管理比较简单",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},51869,"某基础工程的土方开挖量为450m3，土方工程的产量定额为1.2m3\u002F工日，要求15天完成，则完成土方开挖的专业工作队人数至少需要（ ）人。",[158,160,162,164],{"key":20,"text":159,"correct":26},"22",{"key":24,"text":161,"correct":22},"25",{"key":28,"text":163,"correct":26},"32",{"key":31,"text":165,"correct":26},"36",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},51870,"某专业工作队在一个施工段上完成一个施工过程的持续时间被称为（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"流水节拍",{"key":24,"text":173,"correct":26},"流水步距",{"key":28,"text":175,"correct":26},"技术间歇",{"key":31,"text":177,"correct":26},"平行搭接",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},51871,"某工程项目的基础工程可以分解为挖基槽、砌基础、回填土三个施工过程，各施工过程的流水节拍均为5天，其中砌基础、回填土两项工作之间需要有2天技术间歇时间，若施工段数等于参加流水作业的施工过程数，则其流水施工工期是（ ）天。",[182,184,186,188],{"key":20,"text":183,"correct":26},"17",{"key":24,"text":185,"correct":26},"23",{"key":28,"text":187,"correct":22},"27",{"key":31,"text":189,"correct":26},"30",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},51872,"流水施工的工艺参数是指参与流水施工的（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"施工段数",{"key":24,"text":197,"correct":22},"施工过程数目",{"key":28,"text":199,"correct":26},"搭接间距",{"key":31,"text":175,"correct":26},{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":28,"analysis":33},51873,"工程项目施工可以采用不同的组织方式，其中有利于资源均衡使用的组织方式是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":26},"依次施工",{"key":24,"text":208,"correct":26},"平行施工",{"key":28,"text":210,"correct":22},"流水施工",{"key":31,"text":212,"correct":26},"搭接施工",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},51874,"某工程项目的主体工程和装饰工程均可分为四段组织流水作业，其流水节拍分别为5周、6周、6周、5周和4周、5周、5周、4周，若组织分别流水施工，则其流水施工工期是（ ）周。",[217,218,220,221],{"key":20,"text":185,"correct":26},{"key":24,"text":219,"correct":22},"26",{"key":28,"text":189,"correct":26},{"key":31,"text":222,"correct":26},"40",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":28,"analysis":33},51875,"某工程项目基础工程和主体工程均可分为四段组织流水作业，其流水节拍分别为3周、4周、3周、4周和4周、2周、4周、3周，则两个分部工程之间的流水步距是（ ）周。",[227,229,231,233],{"key":20,"text":228,"correct":26},"2",{"key":24,"text":230,"correct":26},"3",{"key":28,"text":232,"correct":22},"4",{"key":31,"text":234,"correct":26},"5",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":31,"analysis":33},51876,"某工程项目主体工程和装饰工程均可分为四个施工段组织流水作业，其流水节拍分别为4周、5周、4周、4周和4周、3周、4周、4周，则该两个分部工程的流水施工工期是（ ）周。",[239,241,243,245],{"key":20,"text":240,"correct":26},"15",{"key":24,"text":242,"correct":26},"16",{"key":28,"text":244,"correct":26},"19",{"key":31,"text":246,"correct":22},"21",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":28,"analysis":33},51877,"某工程项目的主体工程可以分解为 A、 B、 C、D四个施工过程，各施工过程的流水节拍均为5周，若施工中分四个施工段组织流水作业，其中 B、C工作之间有1周技术间歇时间，则其流水施工工期是（ ）周。",[251,252,253,254],{"key":20,"text":246,"correct":26},{"key":24,"text":189,"correct":26},{"key":28,"text":165,"correct":22},{"key":31,"text":255,"correct":26},"42",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":24,"analysis":33},51878,"工程进度计划执行的跟踪检查中，收集数据的主要方式是（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":26},"进度计划偏差预测",{"key":24,"text":263,"correct":22},"工程进度报表和现场实地检查",{"key":28,"text":265,"correct":26},"专家调查法",{"key":31,"text":267,"correct":26},"实际进度与计划进度进行对比",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":24,"analysis":33},51879,"将工程项目计划累计完成工程量曲线与其实施过程中各检查时点累计完成实际工程量曲线绘制在同一直角坐标系中，进行实际进度与计划进度相比较的方法是（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":26},"横道图比较法",{"key":24,"text":275,"correct":22},"S曲线比较法",{"key":28,"text":277,"correct":26},"香蕉曲线比较法",{"key":31,"text":279,"correct":26},"前锋线比较法",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":20,"analysis":33},51880,"通过压缩关键工作的持续时间来调整进度计划，以下属于组织措施是（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"增加工作面，组织更多的施工队伍",{"key":24,"text":287,"correct":26},"实施强有力的组织调度",{"key":28,"text":289,"correct":26},"对所采用的技术措施给予经济补偿",{"key":31,"text":291,"correct":26},"采用更先进的施工机械",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},51881,"影响建设工程进度的不利因素中，最大的干扰因素是（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":22},"人为因素",{"key":24,"text":299,"correct":26},"技术因素",{"key":28,"text":301,"correct":26},"资金因素",{"key":31,"text":303,"correct":26},"机具因素",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},51882,"下列影响建设工程进度的因素中，属于组织管理因素的是（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":22},"合同签订时遗漏条款、表达失当",{"key":24,"text":311,"correct":26},"节假日交通、市容整顿的限制",{"key":28,"text":313,"correct":26},"有关方拖欠资金，资金不到位",{"key":31,"text":315,"correct":26},"不可靠技术的应用",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":20,"analysis":33},51883,"用来安排自勘察设计准备开始至施工图设计完成的整个勘察设计过程中所包含的各阶段工作进度，以确保勘察设计进度控制总目标的实现的是（ ）。",[320,322,324,326],{"key":20,"text":321,"correct":22},"勘察设计总进度计划",{"key":24,"text":323,"correct":26},"勘察设计作业进度计划",{"key":28,"text":325,"correct":26},"阶段性勘察设计进度计划",{"key":31,"text":327,"correct":26},"勘察工作进度计划",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":31,"analysis":33},51884,"关于工程进度控制措施的说法，正确的是（ ）。",[332,334,336,338],{"key":20,"text":333,"correct":26},"工程进度控制的主要措施是组织和技术措施",{"key":24,"text":335,"correct":26},"经济和合同措施是工程进度控制措施中的关键措施",{"key":28,"text":337,"correct":26},"工程进度控制措施在当代主要是指信息管理措施",{"key":31,"text":339,"correct":22},"工程进度控制措施包括组织、技术、经济、合同和信息管理措施",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},51885,"关于采用网络图法编制工程进度计划特点的说法，错误的是（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":22},"简单明了、形象直观",{"key":24,"text":347,"correct":26},"清楚地表达各项工作之间相互联系、相互制约的逻辑关系",{"key":28,"text":349,"correct":26},"能够通过时间参数的计算，找出影响工程进度的关键工作和关键战略",{"key":31,"text":351,"correct":26},"能够利用电子计算机技术和有关项目管理软件对工程进度计划进行绘制",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":31,"analysis":33},51886,"下列工程进度控制措施中，属于经济措施的是（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":26},"评选设计方案",{"key":24,"text":359,"correct":26},"编制进度管理目标体系",{"key":28,"text":361,"correct":26},"选择合同结构",{"key":31,"text":363,"correct":22},"编制资源需求计划",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":28,"analysis":33},51887,"某分部工程可划分为甲、乙、丙三个施工过程，其流水节拍分别为6周、12周和9周，若组织成倍节拍流水施工，其流水步距是（ ）周。",[368,370,371,372],{"key":20,"text":369,"correct":26},"1",{"key":24,"text":228,"correct":26},{"key":28,"text":230,"correct":22},{"key":31,"text":373,"correct":26},"6",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":28,"analysis":33},51888,"某工程项目的一层主体结构分为支模板、扎钢筋、浇混凝土三个主要施工过程，其流水节拍分别为6天、4天和2天，若组织成倍节拍流水施工，且施工段数与专业工作队总数相等，则其流水施工工期是（ ）天。",[378,380,381,382],{"key":20,"text":379,"correct":26},"12",{"key":24,"text":242,"correct":26},{"key":28,"text":159,"correct":22},{"key":31,"text":219,"correct":26},{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},51889,"某工程项目的基础工程可以分解为 A、 B、 C、D四个施工过程，各施工过程的流水节拍均为3天，施工中分四个施工段组织流水作业，其中 C、D工作之间需要2天技术间歇时间，则其流水施工工期是（ ）天。",[387,388,389,390],{"key":20,"text":246,"correct":26},{"key":24,"text":185,"correct":22},{"key":28,"text":161,"correct":26},{"key":31,"text":187,"correct":26},{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":31,"analysis":33},51890,"某单层工业厂房的主体结构工程有吊装立柱、吊装屋架、安装屋面板三个主要的施工过程，其流水节拍分别为4周、4周和2周，若组织成倍节拍流水施工，且取其施工段数等于专业工作队总数，则该主体结构工程的流水施工工期是（ ）周。",[395,397,399,400],{"key":20,"text":396,"correct":26},"10",{"key":24,"text":398,"correct":26},"14",{"key":28,"text":242,"correct":26},{"key":31,"text":401,"correct":22},"18",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":28,"analysis":33},51891,"某工程项目的屋面工程可以分解为 A、 B、 C、D四个施工过程组织流水作业，各施工过程的流水节拍均为3天，其中 C、D工作之间有1天技术间歇时间，若取施工段数等于施工过程数，则屋面工程的流水施工工期是（ ）天。",[406,408,409,410],{"key":20,"text":407,"correct":26},"13",{"key":24,"text":401,"correct":26},{"key":28,"text":159,"correct":22},{"key":31,"text":161,"correct":26},{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":28,"analysis":33},51892,"关于流水施工中确定流水步距时应遵循原则的说法，正确的是（ ）。",[415,417,419,421],{"key":20,"text":416,"correct":26},"流水步距应取常数",{"key":24,"text":418,"correct":26},"各个专业工作队的人员相等",{"key":28,"text":420,"correct":22},"各专业工作队均能连续作业",{"key":31,"text":422,"correct":26},"各专业工作队的工作持续时间相等",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":31,"analysis":33},51893,"下列流水施工的主要参数中，属于工艺参数的是（ ）。",[427,428,429,431],{"key":20,"text":195,"correct":26},{"key":24,"text":175,"correct":26},{"key":28,"text":430,"correct":26},"搭接长度",{"key":31,"text":197,"correct":22},{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":28,"analysis":33},51894,"为确保工程进度目标的顺利实现，必须认真制订进度控制措施。下列各项进度控制措施中，属于技术措施的是（ ）。",[436,438,440,442],{"key":20,"text":437,"correct":26},"编制进度计划和进度控制的工作流程",{"key":24,"text":439,"correct":26},"对应急赶工给予相应的赶工费用补偿",{"key":28,"text":441,"correct":22},"选择对实现进度目标有利的设计方案",{"key":31,"text":443,"correct":26},"推行CM承发包模式，并协调合同工期与进度计划之间的关系",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":31,"analysis":33},51895,"建设单位编制（也可委托咨询单位编制）的进度计划不包括（ ）。",[448,450,452,454],{"key":20,"text":449,"correct":26},"工程项目前期工作计划",{"key":24,"text":451,"correct":26},"工程建设总进度计划",{"key":28,"text":453,"correct":26},"工程项目年度计划",{"key":31,"text":455,"correct":22},"工程项目月度计划",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":20,"analysis":33},51896,"施工单位应当为施工现场从事危险作业的人员办理（ ）。",[460,462,464,466],{"key":20,"text":461,"correct":22},"意外伤害保险",{"key":24,"text":463,"correct":26},"第三者责任险",{"key":28,"text":465,"correct":26},"职业责任保险",{"key":31,"text":467,"correct":26},"雇主责任险",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":33},51897,"工程监理单位在实施监理过程中，发现存在安全事故隐患时应（ ）。",[472,474,476,478],{"key":20,"text":473,"correct":22},"要求施工单位整改或暂停施工",{"key":24,"text":475,"correct":26},"立即报告建设单位或有关主管部门",{"key":28,"text":477,"correct":26},"要求施工单位暂停施工",{"key":31,"text":479,"correct":26},"立即报告建设单位和有关主管部门",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":28,"analysis":33},51898,"施工单位在施工现场从事危险作业人员的意外伤害保险费应由（ ）支付。",[484,486,488,490],{"key":20,"text":485,"correct":26},"作业人员",{"key":24,"text":487,"correct":26},"监理单位",{"key":28,"text":489,"correct":22},"施工单位",{"key":31,"text":491,"correct":26},"建设单位",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":24,"analysis":33},51899,"施工企业计提安全生产费用的依据是建筑安装的（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":26},"实际成本",{"key":24,"text":499,"correct":22},"工程造价",{"key":28,"text":501,"correct":26},"设计概算",{"key":31,"text":503,"correct":26},"建设投资",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":31,"analysis":33},51900,"建筑企业各项安全管理制度应明确规定的内容中，不包括（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":26},"工作内容",{"key":24,"text":511,"correct":26},"责任人（部门）的职责和权限",{"key":28,"text":513,"correct":26},"基本工作程序及标准",{"key":31,"text":515,"correct":22},"安全技术装备参数",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},51901,"安全生产中“三宝”是指（ ）。",[520,522,524,526],{"key":20,"text":521,"correct":26},"安全教育、管理、检查",{"key":24,"text":523,"correct":22},"安全帽、安全带、安全网",{"key":28,"text":525,"correct":26},"机具的防漏电、防尘、防事故",{"key":31,"text":527,"correct":26},"安全生产的布置、检查、总结",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},51902,"实行施工总承包的，生产安全事故应由（ ）负责上报。",[532,534,536,537],{"key":20,"text":533,"correct":26},"分包单位",{"key":24,"text":535,"correct":22},"总承包单位",{"key":28,"text":491,"correct":26},{"key":31,"text":489,"correct":26},{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},51903,"下列施工环境保护措施中，不属于大气污染的防治措施的是（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":26},"施工现场主要道路进行硬化处理",{"key":24,"text":545,"correct":26},"土方和建筑垃圾运输必须采用封闭式运输车辆或采取覆盖措施",{"key":28,"text":547,"correct":26},"施工现场严禁焚烧各类废弃物",{"key":31,"text":549,"correct":22},"工现场存放的化学溶剂应设置专用库房，地面应进行防渗漏处理",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":24,"analysis":33},51904,"公共建筑的装饰性构件造价占建筑总造价的比例不应（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":26},"大于2%",{"key":24,"text":557,"correct":22},"大于1%",{"key":28,"text":559,"correct":26},"小于2%",{"key":31,"text":561,"correct":26},"小于1%",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":31,"analysis":33},51905,"工程监理单位应当审查施工组织设计中的安全技术措施是否符合工程建设的（ ）。",[566,568,570,572],{"key":20,"text":567,"correct":26},"国家标准",{"key":24,"text":569,"correct":26},"行业标准",{"key":28,"text":571,"correct":26},"地方标准",{"key":31,"text":573,"correct":22},"强制性标准",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},51906,"关于安全生产责任，设计单位应在设计文件中注明涉及施工安全的重点部位和环节，并提出（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":26},"防范生产安全事故的技术方案",{"key":24,"text":581,"correct":22},"防范生产安全事故的指导意见",{"key":28,"text":583,"correct":26},"安全生产专项施工方案编制大纲",{"key":31,"text":585,"correct":26},"安全生产专项方案编制要求",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":20,"analysis":33},51907,"工程建设中，负责提供建设工程有关安全施工措施资料并申请领取施工许可证的是（ ）。",[590,591,593,595],{"key":20,"text":491,"correct":22},{"key":24,"text":592,"correct":26},"施工企业",{"key":28,"text":594,"correct":26},"监理机构",{"key":31,"text":596,"correct":26},"项目经理",[598,601,604,607,610,612],{"id":599,"name":600,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":602,"name":603,"category":7,"favorite":8},30,"经济师",{"id":605,"name":606,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":608,"name":609,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":611,"category":7,"favorite":8},"(初级)保险专业",{"id":613,"name":614,"category":7,"favorite":8},51,"(初级)财政税收"]