[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-32":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":591},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,32,50,2220,[13,34,46,58,67,75,83,95,104,116,128,140,152,161,173,183,195,207,217,229,240,249,257,269,281,293,305,317,329,341,352,364,376,388,400,412,424,436,448,460,472,483,495,507,519,531,543,555,567,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},51808,1,"单选题","施工过程中，由于材料供应不及时所消耗的时间属于（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","施工本身造成的停工时间",true,{"key":24,"text":25,"correct":26},"B","非施工本身造成的停工时间",false,{"key":28,"text":29,"correct":26},"C","多余和偶然时间",{"key":31,"text":32,"correct":26},"D","不可避免的中断时间","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},51809,"施工过程中工种之间交叉作业造成的不可避免的剔凿、修复、清理等用工，属于预算定额中人工工日消耗量指标中的（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"基本用工",{"key":24,"text":41,"correct":26},"超运距用工",{"key":28,"text":43,"correct":26},"辅助用工",{"key":31,"text":45,"correct":22},"人工幅度差用工",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},51810,"下列砌筑墙体工程用工中，属于辅助用工的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"砌砖用工",{"key":24,"text":53,"correct":26},"调制砂浆用工",{"key":28,"text":55,"correct":26},"运输砖用工",{"key":31,"text":57,"correct":22},"机械土方工程配合用工",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},51811,"砌筑墙体工程中，运输砖的用工量属于（ ）。",[62,63,64,66],{"key":20,"text":39,"correct":22},{"key":24,"text":43,"correct":26},{"key":28,"text":65,"correct":26},"其他用工",{"key":31,"text":45,"correct":26},{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":20,"analysis":33},51812,"砌筑墙体工程运输砂浆的用工量属于（ ）。",[71,72,73,74],{"key":20,"text":39,"correct":22},{"key":24,"text":65,"correct":26},{"key":28,"text":43,"correct":26},{"key":31,"text":45,"correct":26},{"id":76,"libraryId":5,"type":15,"typeLabel":16,"stem":77,"options":78,"answer":24,"analysis":33},51813,"在预算定额人工消耗量指标中，施工过程中水电维修用工属于（ ）。",[79,80,81,82],{"key":20,"text":43,"correct":26},{"key":24,"text":45,"correct":22},{"key":28,"text":41,"correct":26},{"key":31,"text":39,"correct":26},{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":28,"analysis":33},51814,"扩大结构定额是指（ ）。",[87,89,91,93],{"key":20,"text":88,"correct":26},"施工定额",{"key":24,"text":90,"correct":26},"预算定额",{"key":28,"text":92,"correct":22},"概算定额",{"key":31,"text":94,"correct":26},"概算指标",{"id":96,"libraryId":5,"type":15,"typeLabel":16,"stem":97,"options":98,"answer":28,"analysis":33},51815,"概算指标是对（ ）的扩大与合并。",[99,100,101,102],{"key":20,"text":88,"correct":26},{"key":24,"text":90,"correct":26},{"key":28,"text":92,"correct":22},{"key":31,"text":103,"correct":26},"投资估算指标",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":31,"analysis":33},51816,"《建设工程工程量清单计价规范》规定，下列工程建设项目中，必须采用工程量清单计价的是（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":26},"使用亚投行贷款的",{"key":24,"text":111,"correct":26},"使用非国有资金投资的",{"key":28,"text":113,"correct":26},"全部为外资投资的",{"key":31,"text":115,"correct":22},"使用国有资金投资的",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":20,"analysis":33},51817,"工程招标控制价由（ ）根据工程量清单编制。",[120,122,124,126],{"key":20,"text":121,"correct":22},"招标人",{"key":24,"text":123,"correct":26},"投标人",{"key":28,"text":125,"correct":26},"工程造价咨询人",{"key":31,"text":127,"correct":26},"省级建设行政主管部门",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":20,"analysis":33},51818,"国有资金投资的工程建设项目实行工程量清单招标，必须编制（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"招标控制价",{"key":24,"text":135,"correct":26},"工程量清单说明",{"key":28,"text":137,"correct":26},"最低交易价",{"key":31,"text":139,"correct":26},"招标文件说明",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},51819,"实行工程量清单计价应采用（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":26},"工料单价法",{"key":24,"text":147,"correct":22},"综合单价法",{"key":28,"text":149,"correct":26},"扩大单价法",{"key":31,"text":151,"correct":26},"预算单价法",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},51820,"对于国有资金投资的发承包项目，工程款拨付和最终结算的依据之一是（ ）。",[156,158,159,160],{"key":20,"text":157,"correct":22},"工程量清单",{"key":24,"text":90,"correct":26},{"key":28,"text":88,"correct":26},{"key":31,"text":92,"correct":26},{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":24,"analysis":33},51821,"《建设工程工程量清单计价规范》（GB50500—2013）规定，下列建设工程中，属于招标人必须编制招标控制价的是（ ）。",[165,167,169,171],{"key":20,"text":166,"correct":26},"非国有资金投资的工程",{"key":24,"text":168,"correct":22},"国有资金投资的工程",{"key":28,"text":170,"correct":26},"采用工程量清单方式计价的工程",{"key":31,"text":172,"correct":26},"采用预算定额计价的工程",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":31,"analysis":33},51822,"在发生工程变更、施工索赔、增加新的工程项目等情况时，可作为工程量调整和进行工程索赔的依据是（ ）。",[177,178,180,182],{"key":20,"text":88,"correct":26},{"key":24,"text":179,"correct":26},"计价规范",{"key":28,"text":181,"correct":26},"施工规范",{"key":31,"text":157,"correct":22},{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":28,"analysis":33},51823,"分部分项工程量清单的项目编码由（ ）位阿拉伯数字组成。",[187,189,191,193],{"key":20,"text":188,"correct":26},"10",{"key":24,"text":190,"correct":26},"11",{"key":28,"text":192,"correct":22},"12",{"key":31,"text":194,"correct":26},"13",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":28,"analysis":33},51824,"编制招标工程量清单时，暂列金额应列入（ ）。",[199,201,203,205],{"key":20,"text":200,"correct":26},"暂估价",{"key":24,"text":202,"correct":26},"措施项目清单",{"key":28,"text":204,"correct":22},"其他项目清单",{"key":31,"text":206,"correct":26},"总承包服务费",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":28,"analysis":33},51825,"根据《建设工程工程量清单计价规范》，下列费用中，应列入规费项目清单的是（ ）。",[211,212,214,216],{"key":20,"text":206,"correct":26},{"key":24,"text":213,"correct":26},"计日工",{"key":28,"text":215,"correct":22},"住房公积金",{"key":31,"text":200,"correct":26},{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":31,"analysis":33},51826,"分项工程项目清单的项目名称一般以（ ）命名。",[221,223,225,227],{"key":20,"text":222,"correct":26},"项目特征",{"key":24,"text":224,"correct":26},"项目量纲",{"key":28,"text":226,"correct":26},"项目编码",{"key":31,"text":228,"correct":22},"工程实体",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":24,"analysis":33},51827,"根据《建设工程工程量清单计价规范》（GB50500—2013），下列费用中，应列入其他项目清单编制的是（ ）。",[233,235,236,238],{"key":20,"text":234,"correct":26},"工程排污费",{"key":24,"text":206,"correct":22},{"key":28,"text":237,"correct":26},"社会保险费",{"key":31,"text":239,"correct":26},"工伤保险费",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":20,"analysis":33},51828,"根据《建设工程工程量清单计价规范》，下列费用项目中，应在规费项目清单中列示的是（ ）。",[244,245,247,248],{"key":20,"text":237,"correct":22},{"key":24,"text":246,"correct":26},"暂列金额",{"key":28,"text":200,"correct":26},{"key":31,"text":206,"correct":26},{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},51829,"编制招标工程量清单时，下列费用中，属于其他项目清单的是（ ）。",[253,254,255,256],{"key":20,"text":215,"correct":26},{"key":24,"text":206,"correct":22},{"key":28,"text":237,"correct":26},{"key":31,"text":239,"correct":26},{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":28,"analysis":33},51830,"关于投标价的说法，正确的是（ ）。",[261,263,265,267],{"key":20,"text":262,"correct":26},"投标价只能由投标人编制",{"key":24,"text":264,"correct":26},"投标人的投标报价不得低于招标控制价",{"key":28,"text":266,"correct":22},"投标人的投标报价不得低于工程成本",{"key":31,"text":268,"correct":26},"投标人的投标报价可以高于招标控制价",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":28,"analysis":33},51831,"关于工程项目计划成本的说法，正确的是（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":26},"计划成本就是工程项目的预算成本",{"key":24,"text":276,"correct":26},"计划成本就是工程项目的制造成本",{"key":28,"text":278,"correct":22},"计划成本就是工程项目的目标成本",{"key":31,"text":280,"correct":26},"计划成本就是工程项目的完全成本",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":28,"analysis":33},51832,"工程的项目成本降低额和项目成本降低率（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":26},"反映了建筑行业的综合收益水平",{"key":24,"text":288,"correct":26},"依据工程的计划成本和预算成本计算",{"key":28,"text":290,"correct":22},"依据工程的计划成本和实际成本计算",{"key":31,"text":292,"correct":26},"依据工程的预算成本和实际成本计算",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":28,"analysis":33},51833,"关于工程预算成本的说法，正确的是（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":26},"工程预算成本就是工程计划成本",{"key":24,"text":300,"correct":26},"工程预算成本就是工程目标成本",{"key":28,"text":302,"correct":22},"工程预算成本反映了各地区建筑业平均成本水平",{"key":31,"text":304,"correct":26},"工程预算成本反映了施工企业内部平均成本水平",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":28,"analysis":33},51834,"下列工程成本项目中，属于间接成本的是（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":26},"材料二次搬运费",{"key":24,"text":312,"correct":26},"机械使用费",{"key":28,"text":314,"correct":22},"项目部管理人员工资、福利费",{"key":31,"text":316,"correct":26},"企业总部管理费",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":28,"analysis":33},51835,"下列费用中，不属于施工成本范围的是（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":26},"周转材料摊销费",{"key":24,"text":324,"correct":26},"周转材料租赁费",{"key":28,"text":326,"correct":22},"银行贷款利息",{"key":31,"text":328,"correct":26},"施工机械台班费",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":31,"analysis":33},51836,"施工企业生产经营中发生的管理费用和财务费用属于（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":26},"工程成本",{"key":24,"text":336,"correct":26},"制造成本",{"key":28,"text":338,"correct":26},"间接费用",{"key":31,"text":340,"correct":22},"期间费用",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":28,"analysis":33},51837,"下列施工过程发生的费用项目中，不属于施工成本范围的是（ ）。",[345,347,348,350],{"key":20,"text":346,"correct":26},"主、辅材料费",{"key":24,"text":324,"correct":26},{"key":28,"text":349,"correct":22},"建筑企业财务费用",{"key":31,"text":351,"correct":26},"生产工人的工资支付",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},51838,"施工企业的各个施工单位为施工准备所发生的费用支出属于（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":26},"直接成本",{"key":24,"text":359,"correct":22},"间接成本",{"key":28,"text":361,"correct":26},"期间成本",{"key":31,"text":363,"correct":26},"财务成本",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":28,"analysis":33},51839,"项目成本降低额和项目成本降低率用于（ ）。",[368,370,372,374],{"key":20,"text":369,"correct":26},"确定生产消耗",{"key":24,"text":371,"correct":26},"制定工程报价",{"key":28,"text":373,"correct":22},"考核项目成本管理水平",{"key":31,"text":375,"correct":26},"反映企业综合收益水平",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":24,"analysis":33},51840,"下列费用中，不属于施工成本的是（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":26},"项目部支付给生产工人的工资奖金",{"key":24,"text":383,"correct":22},"项目所属建筑企业的营业费用",{"key":28,"text":385,"correct":26},"项目部租赁周转材料的费用",{"key":31,"text":387,"correct":26},"项目所属分公司为组织工程施工发生的费用",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":20,"analysis":33},51841,"按施工成本的经济性质、现行企业财务制度规定的核算科目，施工成本由（ ）组成。",[392,394,396,398],{"key":20,"text":393,"correct":22},"直接成本和间接成本",{"key":24,"text":395,"correct":26},"固定成本和变动成本",{"key":28,"text":397,"correct":26},"预算成本和计划成本",{"key":31,"text":399,"correct":26},"概算成本和实际成本",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":24,"analysis":33},51842,"下列成本中，用作工程项目实际成本降低额和实际成本降低率计算基准的是（ ）。",[404,406,408,410],{"key":20,"text":405,"correct":26},"概算成本",{"key":24,"text":407,"correct":22},"预算成本",{"key":28,"text":409,"correct":26},"计划成本",{"key":31,"text":411,"correct":26},"实际成本",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},51843,"建设工程成本管理内容中，（ ）是目标成本的一种表达形式，是建立施工项目成本管理责任制、开展成本控制和核算的基础，也是施工成本控制的主要依据。",[416,418,420,422],{"key":20,"text":417,"correct":26},"施工成本分析",{"key":24,"text":419,"correct":22},"施工成本计划",{"key":28,"text":421,"correct":26},"施工成本控制",{"key":31,"text":423,"correct":26},"施工成本核算",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":28,"analysis":33},51844,"施工成本管理的基本流程是（ ）。",[428,430,432,434],{"key":20,"text":429,"correct":26},"成本分析→成本核算→成本预测→成本计划→成本控制→成本考核",{"key":24,"text":431,"correct":26},"成本核算→成本预测→成本考核→成本分析→成本计划→成本控制",{"key":28,"text":433,"correct":22},"成本预测→成本计划→成本控制→成本核算→成本分析→成本考核",{"key":31,"text":435,"correct":26},"成本计划→成本控制→成本预测→成本核算→成本考核→成本分析",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":28,"analysis":33},51845,"关于施工成本管理各环节关系的说法，正确的是（ ）。",[440,442,444,446],{"key":20,"text":441,"correct":26},"成本计划是成本预测的编制基础",{"key":24,"text":443,"correct":26},"成本计划能对成本控制的实施进行监督",{"key":28,"text":445,"correct":22},"成本核算是成本计划是否实现的最后检查",{"key":31,"text":447,"correct":26},"成本考核为成本分析提供依据",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":20,"analysis":33},51846,"预测构成工程实体的材料费的依据是材料价格信息、工料分析表和（ ）。",[452,454,456,458],{"key":20,"text":453,"correct":22},"技术措施",{"key":24,"text":455,"correct":26},"安全措施",{"key":28,"text":457,"correct":26},"临时设施搭设计划",{"key":31,"text":459,"correct":26},"现场平面布置计划",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":28,"analysis":33},51847,"项目经理部可控责任成本考核指标不包括（ ）。",[464,466,468,470],{"key":20,"text":465,"correct":26},"项目经理责任目标总成本降低额和降低率",{"key":24,"text":467,"correct":26},"施工计划成本实际降低额和降低率",{"key":28,"text":469,"correct":22},"项目施工成本降低额和项目施工成本降低率",{"key":31,"text":471,"correct":26},"施工责任目标成本实际降低额和降低率",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":24,"analysis":33},51848,"在工程成本预测方法中，量本利分析法是应用历史数据，利用（ ）的关系，预测目标成本的方法。",[476,478,480,481],{"key":20,"text":477,"correct":26},"预算成本与实际成本",{"key":24,"text":479,"correct":22},"产值、成本和利润",{"key":28,"text":395,"correct":26},{"key":31,"text":482,"correct":26},"产量、产值和利润",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":31,"analysis":33},51849,"量本利分析法预测目标成本趋势图中，保本点是指（ ）的交点。",[487,489,491,493],{"key":20,"text":488,"correct":26},"估算成本线与计划成本线",{"key":24,"text":490,"correct":26},"直接成本线与间接成本线",{"key":28,"text":492,"correct":26},"固定成本线与变动成本线",{"key":31,"text":494,"correct":22},"预算成本线与实际成本线",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":28,"analysis":33},51850,"编制施工成本预测时，预测工程项目人工费的主要依据是（ ）等。",[499,501,503,505],{"key":20,"text":500,"correct":26},"工程量清单、劳务单价信息",{"key":24,"text":502,"correct":26},"现场生产工人配备计划、人工单价信息",{"key":28,"text":504,"correct":22},"工料分析表、劳务单价信息",{"key":31,"text":506,"correct":26},"现场各类人员配备计划、人工单价信息",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":20,"analysis":33},51851,"量本利分析法作为一种施工成本管理方法，主要适用于施工成本的（ ）。",[511,513,515,517],{"key":20,"text":512,"correct":22},"预测",{"key":24,"text":514,"correct":26},"控制",{"key":28,"text":516,"correct":26},"核算",{"key":31,"text":518,"correct":26},"考核",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":24,"analysis":33},51852,"下列施工成本管理方法中，可用于施工成本分析的是（ ）。",[523,525,527,529],{"key":20,"text":524,"correct":26},"技术进步法",{"key":24,"text":526,"correct":22},"因素分析法",{"key":28,"text":528,"correct":26},"定率估算法",{"key":31,"text":530,"correct":26},"挣值分析法",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":28,"analysis":33},51853,"施工成本核算的对象一般为施工图预算所列的（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":26},"分项工程",{"key":24,"text":538,"correct":26},"分部工程",{"key":28,"text":540,"correct":22},"单位工程",{"key":31,"text":542,"correct":26},"单项工程",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":20,"analysis":33},51854,"下列施工成本考核指标中，属于项目成本考核指标的是（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"项目施工成本降低率",{"key":24,"text":550,"correct":26},"目标总成本降低率",{"key":28,"text":552,"correct":26},"施工责任目标成本实际降低率",{"key":31,"text":554,"correct":26},"施工计划成本实际降低率",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":31,"analysis":33},51855,"工程造价中一种重要的，也是较为典型的工程造价形式是（ ）。",[559,561,563,565],{"key":20,"text":560,"correct":26},"工程总投资",{"key":24,"text":562,"correct":26},"工程固定资产投资",{"key":28,"text":564,"correct":26},"工程流动资产投资",{"key":31,"text":566,"correct":22},"工程发承包价格",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},51856,"建筑产品的（ ）特点决定了每项工程都必须单独计算造价。",[571,573,575,577],{"key":20,"text":572,"correct":22},"单件性",{"key":24,"text":574,"correct":26},"多次性",{"key":28,"text":576,"correct":26},"组合性",{"key":31,"text":578,"correct":26},"多样性",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":20,"analysis":33},51857,"建设项目进行决策、筹集资金和合理控制造价的主要依据是（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":22},"投资估算",{"key":24,"text":586,"correct":26},"概算造价",{"key":28,"text":588,"correct":26},"预算造价",{"key":31,"text":590,"correct":26},"修正概算造价",[592,595,598,601,604,606],{"id":593,"name":594,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":596,"name":597,"category":7,"favorite":8},30,"经济师",{"id":599,"name":600,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":602,"name":603,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":605,"category":7,"favorite":8},"(初级)保险专业",{"id":607,"name":608,"category":7,"favorite":8},51,"(初级)财政税收"]