[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":593},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,31,50,2220,[13,34,46,58,70,82,94,106,118,130,142,154,166,175,187,199,208,216,228,240,252,263,275,287,299,311,323,335,343,355,365,377,389,401,410,422,434,446,458,469,481,493,505,517,529,537,546,558,570,582],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},51757,1,"单选题","（ ）阶段是决定工程质量的关键环节。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","前期策划与决策",false,{"key":24,"text":25,"correct":26},"B","工程勘察设计",true,{"key":28,"text":29,"correct":22},"C","工程施工",{"key":31,"text":32,"correct":22},"D","工程竣工验收","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},51758,"工程质量的特点不包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"影响因素多",{"key":24,"text":41,"correct":26},"质量波动小",{"key":28,"text":43,"correct":22},"质量隐蔽性",{"key":31,"text":45,"correct":22},"质量终检局限性",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},51759,"工程质量管理体系运行的有效管理方法是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"检查与考核",{"key":24,"text":53,"correct":22},"审核与评估",{"key":28,"text":55,"correct":26},"PDCA循环",{"key":31,"text":57,"correct":22},"QCDS控制",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},51760,"关于建设工程施工图设计文件审查的说法，正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"施工图设计文件由建设单位进行审查",{"key":24,"text":65,"correct":22},"施工图设计文件由勘察设计企业招标确定的审查机构进行审查",{"key":28,"text":67,"correct":26},"施工图审查应当坚持先勘察、后设计的原则",{"key":31,"text":69,"correct":22},"施工图设计文件审查的内容仅限于是否符合工程建设强制性标准",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},51761,"建设单位应当自工程竣工验收合格之日起（ ）日内，向工程所在地县级以上地方人民政府建设行政主管部门备案。",[74,76,78,80],{"key":20,"text":75,"correct":22},"7",{"key":24,"text":77,"correct":26},"15",{"key":28,"text":79,"correct":22},"20",{"key":31,"text":81,"correct":22},"25",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},51762,"建设行政主管部门可以将建设工程质量监督管理工作委托（ ）具体实施。",[86,88,90,92],{"key":20,"text":87,"correct":26},"工程质量监督机构",{"key":24,"text":89,"correct":22},"建设工程监理单位",{"key":28,"text":91,"correct":22},"工程质量检测机构",{"key":31,"text":93,"correct":22},"质量体系认证单位",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},51763,"申请办理施工许可证的前提条件是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"施工人员已经进场",{"key":24,"text":101,"correct":22},"取得建设工程竣工备案证",{"key":28,"text":103,"correct":22},"施工机械已经进场",{"key":31,"text":105,"correct":26},"取得建设工程规划许可证",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},51764,"（ ）应当自工程竣工验收合格之日起15日内，向工程所在地县级以上地方人民政府建设行政主管部门备案。",[110,112,114,116],{"key":20,"text":111,"correct":22},"施工单位",{"key":24,"text":113,"correct":26},"建设单位",{"key":28,"text":115,"correct":22},"监理单位",{"key":31,"text":117,"correct":22},"建设工程质量监督部门",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},51765,"建设工程勘察、设计文件内容需要作重大修改的，建设单位应当报经（ ）批准后，方可修改。",[122,124,126,128],{"key":20,"text":123,"correct":26},"原审批机关",{"key":24,"text":125,"correct":22},"原勘察、设计单位",{"key":28,"text":127,"correct":22},"勘察、设计阶段的监理单位",{"key":31,"text":129,"correct":22},"施工阶段的监理单位",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},51766,"城镇市政基础设施工程的建设单位在开工前应当向工程所在地（ ）申请领取施工许可证。",[134,136,138,140],{"key":20,"text":135,"correct":22},"县级以上人民政府土地行政主管部门",{"key":24,"text":137,"correct":26},"县级以上地方人民政府住房城乡建设主管部门",{"key":28,"text":139,"correct":22},"县级以上人民政府房产管理部门",{"key":31,"text":141,"correct":22},"县级以上人民政府发展改革部门",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},51767,"关于勘察、设计单位的质量责任的说法，正确的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"设计单位可以自行把设计任务分包给具有相应资质的其他设计单位",{"key":24,"text":149,"correct":22},"设计文件应指定建筑材料、专用设备的生产厂和供应商",{"key":28,"text":151,"correct":26},"设计文件应符合国家规定的设计深度要求并注明工程的合理使用年限",{"key":31,"text":153,"correct":22},"应将施工图设计文件报县级以上人民政府建设行政主管部门审查",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},51769,"关于建设单位质量责任的说法，正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"建设单位必须将工程发包给具有最高资质等级的单位",{"key":24,"text":161,"correct":26},"建设单位必须按合同约定采购建筑材料",{"key":28,"text":163,"correct":22},"建设单位可以将建设工程肢解发包",{"key":31,"text":165,"correct":22},"建设工程发包单位可以使承包方以低于成本的价格竞标",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},51770,"关于工程设计单位质量责任的说法，正确的是（ ）。",[170,171,172,173],{"key":20,"text":147,"correct":22},{"key":24,"text":149,"correct":22},{"key":28,"text":151,"correct":26},{"key":31,"text":174,"correct":22},"设计单位应当就施工图设计文件向施工单位作出详细说明",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":24,"analysis":33},51771,"（ ）应当对原始取样、记录的真实性和准确性负责，对原始记录、测试报告、土工试验成果等各项作业资料验收签字。",[179,181,183,185],{"key":20,"text":180,"correct":22},"建设单位项目负责人",{"key":24,"text":182,"correct":26},"勘察单位项目负责人",{"key":28,"text":184,"correct":22},"设计单位项目负责人",{"key":31,"text":186,"correct":22},"项目总监理工程师",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},51772,"设计单位应考虑施工安全操作和防护的需要，在设计文件中（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"注明涉及施工安全的相关法律和法规",{"key":24,"text":194,"correct":26},"注明涉及施工安全的重点部位和环节",{"key":28,"text":196,"correct":22},"提供施工安全生产保证计划",{"key":31,"text":198,"correct":22},"提供施工安全技术措施方案",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},51773,"（ ）必须组织做好隐蔽工程的验收工作，参加地基基础、主体结构等分部工程的验收，参加单位工程和工程竣工验收。",[203,205,206,207],{"key":20,"text":204,"correct":26},"施工项目负责人",{"key":24,"text":186,"correct":22},{"key":28,"text":180,"correct":22},{"key":31,"text":182,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":24,"analysis":33},51774,"（ ）必须按规定报告质量安全事故，立即启动应急预案，保护事故现场，开展应急救援。",[212,213,214,215],{"key":20,"text":180,"correct":22},{"key":24,"text":204,"correct":26},{"key":28,"text":186,"correct":22},{"key":31,"text":182,"correct":22},{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":31,"analysis":33},51775,"（ ）是施工阶段质量控制的重点。",[220,222,224,226],{"key":20,"text":221,"correct":22},"测量控制",{"key":24,"text":223,"correct":22},"计量控制",{"key":28,"text":225,"correct":22},"关键部位和关键工序质量控制",{"key":31,"text":227,"correct":26},"工序质量控制",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":24,"analysis":33},51776,"关于施工技术交底的说法，错误的是（ ）。",[232,234,236,238],{"key":20,"text":233,"correct":22},"施工技术交底要求进行书面技术交底",{"key":24,"text":235,"correct":26},"施工技术交底是施工作业人员向施工单位负责人交底",{"key":28,"text":237,"correct":22},"技术交底书应由施工项目技术人员编制",{"key":31,"text":239,"correct":22},"每一分部工程开工前均应进行作业技术交底",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":31,"analysis":33},51777,"成品保护措施不包括（ ）。",[244,246,248,250],{"key":20,"text":245,"correct":22},"包裹",{"key":24,"text":247,"correct":22},"覆盖",{"key":28,"text":249,"correct":22},"封闭",{"key":31,"text":251,"correct":26},"检查",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":28,"analysis":33},51778,"（ ）应及时向建设单位提交质量事故书面报告，并应将完整的质量事故处理记录整理归档。",[256,257,259,261],{"key":20,"text":111,"correct":22},{"key":24,"text":258,"correct":22},"事故调查组",{"key":28,"text":260,"correct":26},"项目监理机构",{"key":31,"text":262,"correct":22},"事故单位",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":24,"analysis":33},51779,"房屋建筑的单位工程完工后应由（ ）。",[267,269,271,273],{"key":20,"text":268,"correct":22},"建设单位组织进行竣工预验收",{"key":24,"text":270,"correct":26},"总监理工程师组织进行竣工预验收",{"key":28,"text":272,"correct":22},"施工单位组织进行竣工验收",{"key":31,"text":274,"correct":22},"总监理工程师组织进行竣工验收",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":20,"analysis":33},51780,"（ ）是工程验收的最小单位，是分项工程乃至整个建筑工程质量验收的基础。",[279,281,283,285],{"key":20,"text":280,"correct":26},"检验批",{"key":24,"text":282,"correct":22},"主控项目",{"key":28,"text":284,"correct":22},"分项工程",{"key":31,"text":286,"correct":22},"一般项目",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":20,"analysis":33},51781,"划分工程质量事故等级的依据是事故造成的（ ）。",[291,293,295,297],{"key":20,"text":292,"correct":26},"人员伤亡或直接经济损失",{"key":24,"text":294,"correct":22},"人员伤亡和直接经济损失",{"key":28,"text":296,"correct":22},"人员伤亡或全部经济损失",{"key":31,"text":298,"correct":22},"人员伤亡和全部经济损失",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":28,"analysis":33},51782,"建设工程发生质量事故，有关单位应当在（ ）向当地建设行政主管部门和其他有关部门报告。",[303,305,307,309],{"key":20,"text":304,"correct":22},"1小时内",{"key":24,"text":306,"correct":22},"12小时内",{"key":28,"text":308,"correct":26},"24小时内",{"key":31,"text":310,"correct":22},"48小时内",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":24,"analysis":33},51783,"住房和城乡建设主管部门逐级上报事故情况时，每级上报时间不得超过（ ）。",[315,317,319,321],{"key":20,"text":316,"correct":22},"1小时",{"key":24,"text":318,"correct":26},"2小时",{"key":28,"text":320,"correct":22},"12小时",{"key":31,"text":322,"correct":22},"24小时",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":28,"analysis":33},51784,"抗震等级、抗辐射污染、抗自然灾害等能力是否能达到特定要求，主要体现了建筑工程质量的（ ）。",[327,329,331,333],{"key":20,"text":328,"correct":22},"适用性",{"key":24,"text":330,"correct":22},"耐久性",{"key":28,"text":332,"correct":26},"安全性",{"key":31,"text":334,"correct":22},"可靠性",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":28,"analysis":33},51785,"（ ）是形成工程实体质量的决定性环节。",[339,340,341,342],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":22},{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":31,"analysis":33},51786,"关于工程质量特点的说法，正确的是（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"影响工程质量的因素较少",{"key":24,"text":350,"correct":22},"工程质量的波动小",{"key":28,"text":352,"correct":22},"工程项目最终验收时容易发现隐蔽的质量缺陷",{"key":31,"text":354,"correct":26},"工程项目最终验收时难以发现隐蔽的质量缺陷",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},51787,"建设单位工程质量验收的组织者是（ ）。",[359,360,362,363],{"key":20,"text":113,"correct":26},{"key":24,"text":361,"correct":22},"工程监理单位",{"key":28,"text":111,"correct":22},{"key":31,"text":364,"correct":22},"质量监督机构",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":28,"analysis":33},51788,"关于监理单位质量责任的说法，正确的是（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"监理单位代表施工单位对施工质量实施监督",{"key":24,"text":372,"correct":22},"监理单位代表施工单位进行竣工验收",{"key":28,"text":374,"correct":26},"监理单位代表建设单位对施工质量实施监理",{"key":31,"text":376,"correct":22},"监理单位代表建设单位进行竣工验收",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":31,"analysis":33},51789,"在办理工程质量监督手续前，建设单位不得（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"进行施工招标",{"key":24,"text":384,"correct":22},"签订监理合同",{"key":28,"text":386,"correct":22},"组织施工图审查",{"key":31,"text":388,"correct":26},"领取施工许可证",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},51790,"施工总承包单位应对其依法分包工程的施工质量问题承担（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":22},"主要责任",{"key":24,"text":396,"correct":22},"次要责任",{"key":28,"text":398,"correct":22},"关键责任",{"key":31,"text":400,"correct":26},"连带责任",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":28,"analysis":33},51791,"（ ）必须在起重机械安装、拆卸，模板支架搭设等危险性较大分部分项工程施工期间现场带班。",[405,406,407,409],{"key":20,"text":180,"correct":22},{"key":24,"text":186,"correct":22},{"key":28,"text":408,"correct":26},"施工项目经理",{"key":31,"text":182,"correct":22},{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":31,"analysis":33},51792,"下列不属于工程概算的是（ ）。",[414,416,418,420],{"key":20,"text":415,"correct":22},"建设项目总概算",{"key":24,"text":417,"correct":22},"各单项工程综合概算",{"key":28,"text":419,"correct":22},"各单位工程概算",{"key":31,"text":421,"correct":26},"修正概算",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":28,"analysis":33},51793,"在计价过程中，施工图预算的编制阶段是（ ）。",[426,428,430,432],{"key":20,"text":427,"correct":22},"初步设计阶段",{"key":24,"text":429,"correct":22},"技术设计阶段",{"key":28,"text":431,"correct":26},"施工图设计阶段",{"key":31,"text":433,"correct":22},"施工阶段",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":28,"analysis":33},51794,"关于合同价的说法，错误的是（ ）。",[438,440,442,444],{"key":20,"text":439,"correct":22},"合同价在工程发承包阶段确定",{"key":24,"text":441,"correct":22},"合同价属于市场价格",{"key":28,"text":443,"correct":26},"合同价等同于最终结算的实际工程造价",{"key":31,"text":445,"correct":22},"合同价的内涵可能由于计价方式的不同而会有所不同",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},51795,"在工程计价的特征中，将工程计价逐步深化、逐步细化和逐步接近实际造价的过程，是指（ ）。",[450,452,454,456],{"key":20,"text":451,"correct":22},"计价的单件性",{"key":24,"text":453,"correct":26},"计价的多次性",{"key":28,"text":455,"correct":22},"计价的组合性",{"key":31,"text":457,"correct":22},"计价方法的多样性",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":20,"analysis":33},51796,"（ ）是指在初步设计阶段，根据设计意图，通过编制工程概算文件，预先测算的工程造价。",[462,464,466,467],{"key":20,"text":463,"correct":26},"工程概算",{"key":24,"text":465,"correct":22},"投资估算",{"key":28,"text":421,"correct":22},{"key":31,"text":468,"correct":22},"竣工决算",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":31,"analysis":33},51797,"下列工作中，属于工程发承包阶段造价管理工作内容的是（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":22},"处理工程变更",{"key":24,"text":476,"correct":22},"审核工程概算",{"key":28,"text":478,"correct":22},"进行工程计量",{"key":31,"text":480,"correct":26},"编制工程量清单",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":31,"analysis":33},51798,"控制工程造价最有效的手段是（ ）。",[485,487,489,491],{"key":20,"text":486,"correct":22},"控制经营费用",{"key":24,"text":488,"correct":22},"控制设计阶段",{"key":28,"text":490,"correct":22},"主动控制",{"key":31,"text":492,"correct":26},"技术与经济相结合",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":24,"analysis":33},51799,"投资估算指标通常是以（ ）为计算对象，根据已建工程或现有工程的价格数据和资料，经分析、归纳和整理编制而成的。",[497,499,501,503],{"key":20,"text":498,"correct":22},"以扩大的分部分项工程",{"key":24,"text":500,"correct":26},"以独立的单项工程或完整的工程项目",{"key":28,"text":502,"correct":22},"以整个建筑物和构筑物",{"key":31,"text":504,"correct":22},"以建筑物或构筑物各个分部分项工程",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":20,"analysis":33},51800,"施工定额的研究对象是（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":26},"工序",{"key":24,"text":512,"correct":22},"扩大的分部分项工程",{"key":28,"text":514,"correct":22},"整个建筑物和构筑物",{"key":31,"text":516,"correct":22},"分部分项工程",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":31,"analysis":33},51801,"工程建设定额中，分项最细、定额子目最多的定额是（ ）。",[521,523,525,527],{"key":20,"text":522,"correct":22},"概算定额",{"key":24,"text":524,"correct":22},"概算指标",{"key":28,"text":526,"correct":22},"预算定额",{"key":31,"text":528,"correct":26},"施工定额",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":31,"analysis":33},51802,"（ ）是编制初步设计概算和修正概算时，计算劳动、施工机具台班、材料需要量及确定工程概算造价所使用的定额。",[533,534,535,536],{"key":20,"text":528,"correct":22},{"key":24,"text":526,"correct":22},{"key":28,"text":524,"correct":22},{"key":31,"text":522,"correct":26},{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":31,"analysis":33},51803,"概算指标是按一定计量单位规定的，比（ ）更综合扩大的分部工程或单位工程的劳动、材料和机械台班的消耗量标准和造价指标。",[541,542,544,545],{"key":20,"text":526,"correct":22},{"key":24,"text":543,"correct":22},"企业定额",{"key":28,"text":528,"correct":22},{"key":31,"text":522,"correct":26},{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":20,"analysis":33},51804,"将建设工程定额分为劳动定额、材料消耗定额和施工机具台班消耗定额，是按（ ）进行的分类。",[550,552,554,556],{"key":20,"text":551,"correct":26},"生产要素消耗内容",{"key":24,"text":553,"correct":22},"编制程序和用途",{"key":28,"text":555,"correct":22},"编制单位和适用范围",{"key":31,"text":557,"correct":22},"投资费用性质",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},51805,"劳动定额的工人工作时间中，为保证基本工作能顺利完成所消耗的时间，被称为工人的（ ）工作时间。",[562,564,566,568],{"key":20,"text":563,"correct":22},"基本",{"key":24,"text":565,"correct":26},"辅助",{"key":28,"text":567,"correct":22},"准备",{"key":31,"text":569,"correct":22},"有效",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":31,"analysis":33},51806,"下列时间中，属于损失时间的是（ ）。",[574,576,578,580],{"key":20,"text":575,"correct":22},"休息时间",{"key":24,"text":577,"correct":22},"不可避免中断时间",{"key":28,"text":579,"correct":22},"辅助工作时间",{"key":31,"text":581,"correct":26},"停工时间",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":20,"analysis":33},51807,"编制机械台班消耗定额时，汽车装货和卸货时停车消耗的机械工作时间属于（ ）。",[586,587,589,591],{"key":20,"text":577,"correct":26},{"key":24,"text":588,"correct":22},"有效工作时间",{"key":28,"text":590,"correct":22},"不可避免的无负荷工作时间",{"key":31,"text":592,"correct":22},"多余工作时间",[594,597,600,602,605,607],{"id":595,"name":596,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":598,"name":599,"category":7,"favorite":8},30,"经济师",{"id":9,"name":601,"category":7,"favorite":8},"(初级)银行从业资格",{"id":603,"name":604,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":606,"category":7,"favorite":8},"(初级)保险专业",{"id":608,"name":609,"category":7,"favorite":8},51,"(初级)财政税收"]