[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":615},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,30,50,2220,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,273,285,297,309,321,333,345,357,369,381,393,405,417,429,441,453,465,477,489,501,511,523,535,547,559,571,583,591,603],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},51707,1,"单选题","建设工程监理中最常用的一种协调方法是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","交谈协调法",false,{"key":24,"text":25,"correct":22},"B","访问协调法",{"key":27,"text":28,"correct":22},"C","书面协调法",{"key":30,"text":31,"correct":32},"D","会议协调法",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},51708,"工程监理单位在实施监理过程中，发现工程存在安全事故隐患且情况严重时应（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"要求施工单位整改",{"key":24,"text":41,"correct":22},"立即报告建设单位或有关主管部门",{"key":27,"text":43,"correct":32},"要求施工单位暂停施工，并应及时报告建设单位",{"key":30,"text":45,"correct":22},"立即报告建设单位和有关主管部门",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},51709,"在工程项目目标控制措施中，实施其他各类措施的前提和保障的措施是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"经济措施",{"key":24,"text":53,"correct":22},"技术措施",{"key":27,"text":55,"correct":32},"组织措施",{"key":30,"text":57,"correct":22},"协调措施",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},51710,"在工程施工合同中，承包人需要履行的一般义务不包括（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"按法律规定和合同约定完成工程，并在保修期内承担保修义务",{"key":24,"text":65,"correct":22},"按照施工合同约定负责施工场地及其周边环境与生态的保护工作",{"key":27,"text":67,"correct":32},"应按合同约定及时组织竣工验收",{"key":30,"text":69,"correct":22},"按照法律规定和合同约定编制竣工资料，完成竣工资料立卷及归档",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},51711,"工程施工合同中的发包人在合同履行中发生下列（ ）行为，属承包人违约。",[74,76,78,80],{"key":20,"text":75,"correct":22},"因发包人原因未能在计划开工日期前7天内下达开工通知的",{"key":24,"text":77,"correct":22},"因发包人原因未能按合同约定支付合同价款的",{"key":27,"text":79,"correct":32},"承包人在缺陷责任期及保修期内，未能在合理期限对工程缺陷进行修复",{"key":30,"text":81,"correct":22},"发包人提供的材料、工程设备的规格、数量或质量不符合合同约定",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},51712,"工程勘察合同生效后，发包人无故要求终止或解除合同，完成计划工作量超过50%的，发包人应支付勘察人合同价款的（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"50%",{"key":24,"text":89,"correct":32},"100%",{"key":27,"text":91,"correct":22},"60%",{"key":30,"text":93,"correct":22},"80%",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},51713,"发包人在工程勘察合同履行中发生（ ）的，属发包人违约。",[98,100,102,104],{"key":20,"text":99,"correct":32},"未按合同约定支付勘察费用",{"key":24,"text":101,"correct":22},"转包、违法分包",{"key":27,"text":103,"correct":22},"未按合同计划完成勘察，从而造成工程损失",{"key":30,"text":105,"correct":22},"勘察文件不符合法律及合同约定",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},51714,"关于国民经济评价和财务评价区别的说法，错误的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"财务评价是从财务角度考察，国民经济评价是从国家整体角度考察",{"key":24,"text":113,"correct":32},"财务评价采用影子价格，国民经济评价采用现行价格",{"key":27,"text":115,"correct":22},"财务评价采用的是官方汇率，国民经济评价采用影子汇率和社会折现率",{"key":30,"text":117,"correct":22},"财务评价只计算项目直接发生的效益与费用，国民经济评价对项目引起的间接效益与费用，也要进行计算和分析",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},51715,"关于影子价格的说法，错误的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"是反映投入物与产出物真实经济价值的价格",{"key":24,"text":125,"correct":22},"是反映市场供求状况和资源稀缺程度，使资源得到合理配置的价格",{"key":27,"text":127,"correct":22},"用来从全社会角度衡量商品或生产要素投入或产出的成本与效益",{"key":30,"text":129,"correct":32},"是用来进行财务评价的价格",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},51716,"下列属于工程项目财务盈利能力的动态指标的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":32},"项目投资财务内部收益率",{"key":24,"text":137,"correct":22},"项目息税前利润",{"key":27,"text":139,"correct":22},"投资回收期",{"key":30,"text":141,"correct":22},"利润总额",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},51717,"国家发展改革委项目审批、核准或者核报国务院审批、核准项目的重要依据是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":32},"评估主体作出的社会稳定风险评估报告",{"key":24,"text":149,"correct":22},"项目单位组织编制的社会稳定风险分析篇章",{"key":27,"text":151,"correct":22},"工程咨询机构提出的评估咨询意见",{"key":30,"text":153,"correct":22},"社会安全主管部门审查意见",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},51718,"可行性研究的作用不包括（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"作为工程项目建设立项的依据",{"key":24,"text":161,"correct":32},"作为制定施工进度计划的依据",{"key":27,"text":163,"correct":22},"作为筹集项目建设资金的依据",{"key":30,"text":165,"correct":22},"作为编制工程设计文件的依据",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},51719,"当项目经济效益费用比（ ）时，表明项目资源配置的经济效率达到可被接受的水平。",[170,172,174,176],{"key":20,"text":171,"correct":32},"大于1",{"key":24,"text":173,"correct":22},"小于1",{"key":27,"text":175,"correct":22},"等于1",{"key":30,"text":177,"correct":22},"大于或等于1",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},51720,"（ ）是项目可行性研究的核心部分，主要解决项目的经济“合理性”问题。",[182,184,186,188],{"key":20,"text":183,"correct":22},"市场研究",{"key":24,"text":185,"correct":22},"技术研究",{"key":27,"text":187,"correct":32},"经济评价",{"key":30,"text":189,"correct":22},"设备研究",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},51721,"对于采用投资补助、转贷和贷款贴息方式的政府投资项目，则只审批（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":32},"资金申请报告",{"key":24,"text":197,"correct":22},"项目建议书",{"key":27,"text":199,"correct":22},"可行性研究报告",{"key":30,"text":201,"correct":22},"开工报告",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},51722,"政府对确需支持的经营性项目，主要采取（ ）方式投入。",[206,208,210,212],{"key":20,"text":207,"correct":22},"间接投资",{"key":24,"text":209,"correct":22},"投资补助",{"key":27,"text":211,"correct":32},"资本金注入",{"key":30,"text":213,"correct":22},"贷款贴息",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},51723,"实行备案管理的项目，如果企业未按规定备案告知，下列措施正确的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":32},"备案机关责令限期改正",{"key":24,"text":221,"correct":22},"对企业处项目总投资额0.1%以上0.5%以下的罚款",{"key":27,"text":223,"correct":22},"处5万元以上罚款",{"key":30,"text":225,"correct":22},"责任人属于国家工作人员的，依法给予处分",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},51724,"对关系国家安全、涉及全国重大生产力布局、战略性资源开发和重大公共利益的企业投资项目，实行（ ）管理。",[230,232,234,236],{"key":20,"text":231,"correct":22},"备案",{"key":24,"text":233,"correct":32},"核准",{"key":27,"text":235,"correct":22},"登记",{"key":30,"text":237,"correct":22},"注册",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},51725,"根据《国务院关于投资体制改革的决定》（国发［2004］20号），政府投资项目实行（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"备案制",{"key":24,"text":245,"correct":32},"审批制",{"key":27,"text":247,"correct":22},"核准制",{"key":30,"text":249,"correct":22},"开工报告制",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},51726,"实行核准管理的项目，企业未按规定办理核准手续的，对企业处项目总投资额（ ）的罚款。",[254,256,258,260],{"key":20,"text":255,"correct":22},"0.1%",{"key":24,"text":257,"correct":32},"0.1%以上0.5%以下",{"key":27,"text":259,"correct":22},"0.5%",{"key":30,"text":261,"correct":22},"0.5%以上1%以下",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},51727,"工程项目财务评价中的敏感性分析，通常会选择（ ）指标。",[266,267,269,271],{"key":20,"text":135,"correct":32},{"key":24,"text":268,"correct":22},"经济净现值",{"key":27,"text":270,"correct":22},"经济内部收益率",{"key":30,"text":272,"correct":22},"财务净现值",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},51728,"详细可行性研究的投资估算误差应更小，一般应控制在（ ）以内。",[277,279,281,283],{"key":20,"text":278,"correct":32},"±10%",{"key":24,"text":280,"correct":22},"±15%",{"key":27,"text":282,"correct":22},"±20%",{"key":30,"text":284,"correct":22},"±30%",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":30,"analysis":33},51729,"评估主体作出的社会稳定风险评估报告是国家发展改革委审批、核准或者核报国务院审批、核准项目的重要依据。评估报告认为项目存在（ ），国家发展改革委不予审批、核准和核报。",[289,291,293,295],{"key":20,"text":290,"correct":22},"风险的",{"key":24,"text":292,"correct":22},"一定风险的",{"key":27,"text":294,"correct":22},"高风险的",{"key":30,"text":296,"correct":32},"高风险或者中风险的",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},51730,"对于可能造成重大环境影响的项目，应当编制（ ），对产生的环境影响进行全面评价。",[301,303,305,307],{"key":20,"text":302,"correct":32},"环境影响报告书",{"key":24,"text":304,"correct":22},"环境影响报告表",{"key":27,"text":306,"correct":22},"环境影响测评报告",{"key":30,"text":308,"correct":22},"环境影响登记表",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},51731,"实行核准管理的项目，开工建设只能延期一次，且延长期限最长不得超过（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":32},"1年",{"key":24,"text":316,"correct":22},"2年",{"key":27,"text":318,"correct":22},"3年",{"key":30,"text":320,"correct":22},"5年",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":20,"analysis":33},51732,"（ ）是我国计划经济体制下大中型建设工程所采用的一种基本组织形式。",[325,327,329,331],{"key":20,"text":326,"correct":32},"工程建设指挥部",{"key":24,"text":328,"correct":22},"建设项目法人",{"key":27,"text":330,"correct":22},"工程代建制",{"key":30,"text":332,"correct":22},"项目管理承包",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":27,"analysis":33},51733,"政府投资的非经营性项目应加快推行（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"代管制",{"key":24,"text":340,"correct":22},"分项委托管理模式",{"key":27,"text":342,"correct":32},"代建制",{"key":30,"text":344,"correct":22},"项目管理承包模式",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":27,"analysis":33},51734,"PMC模式下，项目管理承包商在项目前期阶段工作内容包括（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":22},"进行设计管理，协调有关技术条件",{"key":24,"text":352,"correct":22},"完成项目总体中某些部分的详细设计",{"key":27,"text":354,"correct":32},"组织项目风险识别和分析，并制定项目风险应对策略",{"key":30,"text":356,"correct":22},"实施采购管理，并为业主负责的采购提供服务",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},51735,"关于全过程工程咨询特点的说法，错误的是（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"全过程工程咨询覆盖项目投资决策、建设实施全过程集成化服务",{"key":24,"text":364,"correct":32},"全过程工程咨询主要是指管理咨询",{"key":27,"text":366,"correct":22},"全过程工程咨询强调智力性策划",{"key":30,"text":368,"correct":22},"全过程工程咨询实施多阶段集成",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":27,"analysis":33},51736,"传统的项目管理模式（DBB模式），其含义是（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":22},"建造—拥有—运营",{"key":24,"text":376,"correct":22},"建造—租赁—移交",{"key":27,"text":378,"correct":32},"设计—招标—建造",{"key":30,"text":380,"correct":22},"设计—施工总承包",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":27,"analysis":33},51737,"关于工程总承包模式的说法，错误的是（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"工程总承包单位应同时具有与工程规模相适应的工程设计资质和施工资质",{"key":24,"text":388,"correct":22},"工程总承包单位可以由具有相应资质的设计单位和施工单位组成联合体",{"key":27,"text":390,"correct":32},"工程总承包项目经理可以同时在两个工程项目担任施工项目负责人",{"key":30,"text":392,"correct":22},"工程总承包项目经理应当取得相应工程建设类注册执业资格或取得高级专业技术职称",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":27,"analysis":33},51738,"关于DB\u002FEPC模式优点的说法，错误的是（ ）。",[397,399,401,403],{"key":20,"text":398,"correct":22},"有利于缩短建设工期",{"key":24,"text":400,"correct":22},"便于建设单位提前确定工程造价",{"key":27,"text":402,"correct":32},"使工程项目责任主体多元化",{"key":30,"text":404,"correct":22},"可减轻建设单位合同管理的负担",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":30,"analysis":33},51739,"建筑工程管理（CM）模式的特点是（ ）。",[409,411,413,415],{"key":20,"text":410,"correct":22},"建设单位与分包单位直接签订合同",{"key":24,"text":412,"correct":22},"采用流水施工法施工",{"key":27,"text":414,"correct":22},"CM单位可赚取总分包之间的差价",{"key":30,"text":416,"correct":32},"采用快速路径法施工",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":27,"analysis":33},51740,"关于建筑工程管理（CM）模式的说法，错误的是（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":22},"CM模式下采用快速路径法施工",{"key":24,"text":424,"correct":22},"CM模式特别适用于实施周期长、工期要求紧迫的大型复杂工程",{"key":27,"text":426,"correct":32},"CM单位与分包单位之间的合同价是保密的",{"key":30,"text":428,"correct":22},"CM单位不赚取总包与分包之间的差价",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":30,"analysis":33},51741,"建设工程项目实施建筑工程管理（CM）模式时，代理型合同和非代理型合同的签订为（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":22},"均由建设单位与分包单位直接签订",{"key":24,"text":436,"correct":22},"均由CM单位与分包单位签订",{"key":27,"text":438,"correct":22},"代理型合同是CM单位和建设单位签订，非代理型合同是CM单位与分包单位签订",{"key":30,"text":440,"correct":32},"代理型合同是建设单位与分包单位签订，非代理型合同是CM单位与分包单位签订",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},51742,"在非代理型CM模式下，采用的合同计价形式为（ ）合同。",[445,447,449,451],{"key":20,"text":446,"correct":22},"保证最大工程费用",{"key":24,"text":448,"correct":32},"保证最大工程费用加酬金",{"key":27,"text":450,"correct":22},"固定总价",{"key":30,"text":452,"correct":22},"成本加酬金",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":30,"analysis":33},51743,"施工任务要进行多次分包，施工合同总价不是一次确定，而是采取完成一部分施工图纸就分包一部分，将施工合同总价化整为零，具有这一特点的是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"发包模式",{"key":24,"text":460,"correct":22},"分包模式",{"key":27,"text":462,"correct":22},"EPC模式",{"key":30,"text":464,"correct":32},"CM模式",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":30,"analysis":33},51744,"关于伙伴关系（Partnering）模式的说法，错误的是（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"参与Partnering模式的有关各方出于自愿",{"key":24,"text":472,"correct":22},"工程参建各方高层管理者参与并达成共识",{"key":27,"text":474,"correct":22},"Partnering模式强调资源共享",{"key":30,"text":476,"correct":32},"Partnering协议本质是法律意义上的合同",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":27,"analysis":33},51745,"在下列工程项目管理组织机构形式中，容易形成多头领导的是（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"直线职能式和直线式",{"key":24,"text":484,"correct":22},"直线式和职能式",{"key":27,"text":486,"correct":32},"职能式和矩阵式",{"key":30,"text":488,"correct":22},"矩阵式和直线职能式",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":30,"analysis":33},51746,"（ ）组织结构打破了传统的“一个员工只有一位领导”的命令统一原则，使一位员工同属于两个部门。",[493,495,497,499],{"key":20,"text":494,"correct":22},"直线式",{"key":24,"text":496,"correct":22},"职能式",{"key":27,"text":498,"correct":22},"直线职能式",{"key":30,"text":500,"correct":32},"矩阵式",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":20,"analysis":33},51747,"（ ）管理模式下，工程建设实施阶段的“外部”协调多由项目法人承担，而工程监理单位派出的项目监理机构多负责工程项目“内部”控制。",[505,507,508,509],{"key":20,"text":506,"correct":32},"建设项目法人责任制",{"key":24,"text":330,"correct":22},{"key":27,"text":332,"correct":22},{"key":30,"text":510,"correct":22},"全过程工程咨询",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":27,"analysis":33},51748,"下列不属于建设项目法人责任制优越性的是（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"有利于实现投资决策的科学化和民主化",{"key":24,"text":518,"correct":22},"有利于拓宽建设筹资渠道和分散投资风险",{"key":27,"text":520,"correct":32},"对自属设计队伍、施工队伍的调动比较灵活",{"key":30,"text":522,"correct":22},"有利于避免建设与运营相互脱节",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":27,"analysis":33},51749,"工程代建制与项目法人责任制的区别在于（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"代建单位负责资金的筹措",{"key":24,"text":530,"correct":22},"代建单位须参与全过程的项目管理",{"key":27,"text":532,"correct":32},"代建单位不负责项目运营期间的资产保值增值",{"key":30,"text":534,"correct":22},"代建单位仅适用于政府投资的经营性项目",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},51750,"PMC模式下，按照工作范围不同，项目管理承包商的风险不同，关于项目管理承包商的风险的说法，正确的是（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":32},"A．项目管理承包商承担部分工程的设计、采购、施工（EP工作时，风险最高",{"key":24,"text":542,"correct":22},"项目管理承包商只是管理EPC承包商而不承担任何EPC工作时，风险高，回报低",{"key":27,"text":544,"correct":22},"项目管理承包商只是管理EPC承包商而不承担任何EPC工作时，风险低，回报高",{"key":30,"text":546,"correct":22},"项目管理承包商作为业主顾问，风险低，回报适中",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":27,"analysis":33},51751,"关于PMC的说法，正确的是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"PMC是项目管理咨询公司代理业主或承包商进行项目管理",{"key":24,"text":554,"correct":22},"PMC模式中项目管理承包商参与项目全寿命周期管理",{"key":27,"text":556,"correct":32},"采用PMC管理模式时，绝大部分项目管理工作均由项目管理承包商承担",{"key":30,"text":558,"correct":22},"采用PMC管理模式时，项目管理承包商承担了业主的大部分风险",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},51752,"关于强矩阵制组织形式的说法，错误的是（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"项目经理全权负责项目",{"key":24,"text":566,"correct":32},"需要配备训练有素的协调人员",{"key":27,"text":568,"correct":22},"项目组成员绩效完全由项目经理进行考核",{"key":30,"text":570,"correct":22},"适用于技术复杂且时间紧迫的工程项目",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":27,"analysis":33},51753,"工程项目管理组织结构采用直线式形式的主要优点是（ ）。",[575,577,579,581],{"key":20,"text":576,"correct":22},"管理业务的专门化，减轻上层主管人员负担",{"key":24,"text":578,"correct":22},"集中领导、职责清楚，工作效率高",{"key":27,"text":580,"correct":32},"权力集中，责任分明，命令统一，决策迅速，联系简捷",{"key":30,"text":582,"correct":22},"实现了集权与分权的结合，有利于发挥各类专业人员的积极性",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":20,"analysis":33},51754,"（ ）是应用最早、最简单的一种组织结构形式。",[587,588,589,590],{"key":20,"text":494,"correct":32},{"key":24,"text":496,"correct":22},{"key":27,"text":498,"correct":22},{"key":30,"text":500,"correct":22},{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":20,"analysis":33},51755,"建设工程采用CM承包模式，由于采用分阶段发包，集中管理，实现了有条件的（ ），使设计与施工能够充分地搭接，有利于缩短建设工期。",[595,597,599,601],{"key":20,"text":596,"correct":32},"边设计，边施工",{"key":24,"text":598,"correct":22},"先设计，再施工",{"key":27,"text":600,"correct":22},"先设计，再审查",{"key":30,"text":602,"correct":22},"边设计，边审查",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":24,"analysis":33},51756,"当采用非代理型CM方式时，如果实际工程费用超过GMP，超出部分将由（ ）承担。",[607,609,611,613],{"key":20,"text":608,"correct":22},"分包商",{"key":24,"text":610,"correct":32},"CM单位",{"key":27,"text":612,"correct":22},"总承包商",{"key":30,"text":614,"correct":22},"设计单位",[616,619,621,624,627,629],{"id":617,"name":618,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":9,"name":620,"category":7,"favorite":8},"经济师",{"id":622,"name":623,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":625,"name":626,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":628,"category":7,"favorite":8},"(初级)保险专业",{"id":630,"name":631,"category":7,"favorite":8},51,"(初级)财政税收"]