[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,3,50,2220,[13,34,46,58,70,82,94,103,115,127,139,151,163,171,183,195,207,219,230,242,254,266,278,290,302,314,326,338,350,362,374,386,398,410,422,434,446,458,470,482,492,504,516,528,539,550,562,574,586,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},49512,1,"单选题","下列工作中，建设单位在编制设计任务书之前应完成的是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","拆迁",false,{"key":24,"text":25,"correct":26},"B","建设项目可行性研究",true,{"key":28,"text":29,"correct":22},"C","指定投资计划",{"key":31,"text":32,"correct":22},"D","选择建筑师","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},49514,"下列各项工作中，属于施工阶段施工方项目管理工作的是()。",[38,40,42,44],{"key":20,"text":39,"correct":26},"编制施工成本计划，设定目标成本",{"key":24,"text":41,"correct":22},"组织并完成施工现场的“三通一平”工作",{"key":28,"text":43,"correct":22},"落实项目施工阶段的总体部署，进行施工总进度目标论证",{"key":31,"text":45,"correct":22},"建立独立平行的监测体系，对工程质量的全过程进行独立平行监测",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},49516,"工作流程图反映了一个组织系统中各项工作之间的逻辑关系，工作流程图中的箭线表示（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"工作",{"key":24,"text":53,"correct":22},"判别条件",{"key":28,"text":55,"correct":26},"逻辑关系",{"key":31,"text":57,"correct":22},"工作执行者",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},49517,"下列关于总包与分包的说法不正确的是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"总包应对建设单位负直接责任",{"key":24,"text":65,"correct":26},"分包应对建设单位负全部责任",{"key":28,"text":67,"correct":22},"分包只对总包负责",{"key":31,"text":69,"correct":22},"建设单位与分包单位不发生任何直接关系",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},49519,"控制工程项目目标最重要的措施是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"经济措施",{"key":24,"text":77,"correct":22},"技术措施",{"key":28,"text":79,"correct":26},"组织措施",{"key":31,"text":81,"correct":22},"协调措施",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},49521,"施工联合体承包某项工程，如联合体中一家公司倒闭，则联合体其他成员()。",[86,88,90,92],{"key":20,"text":87,"correct":26},"必须承担其经济责任",{"key":24,"text":89,"correct":22},"不承担其经济责任",{"key":28,"text":91,"correct":22},"视联合体内部约定决定是否承担其经济责任",{"key":31,"text":93,"correct":22},"按照与业主签订的承包合同决定是否承担其经济责任",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},49523,"工作流程图反映了一个组织系统中各项工作之间的逻辑关系，工作流程图中菱形框表示()。",[98,99,100,101],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":22},{"key":31,"text":102,"correct":22},"工作的执行者",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":24,"analysis":33},49524,"在国际上，民用建筑项目工程总承包的招标多数采用()的方式。",[107,109,111,113],{"key":20,"text":108,"correct":22},"项目构造描述",{"key":24,"text":110,"correct":26},"项目功能描述",{"key":28,"text":112,"correct":22},"施工图设计与工程量清单",{"key":31,"text":114,"correct":22},"费率招标",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":28,"analysis":33},49526,"提出申请建设项目选址意见书申请的是()。",[119,121,123,125],{"key":20,"text":120,"correct":22},"监理单位",{"key":24,"text":122,"correct":22},"施工单位",{"key":28,"text":124,"correct":26},"建设单位",{"key":31,"text":126,"correct":22},"设计单位",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":24,"analysis":33},49528,"项目是一种()的任务。",[131,133,135,137],{"key":20,"text":132,"correct":22},"常规性、可重复性和一次性",{"key":24,"text":134,"correct":26},"非常规性、非重复性和一次性",{"key":28,"text":136,"correct":22},"非常规性、非重复性和多次性",{"key":31,"text":138,"correct":22},"常规性、可重复性和多次性",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},49530,"施工项目管理的目标不包括()。",[143,145,147,149],{"key":20,"text":144,"correct":22},"成本目标",{"key":24,"text":146,"correct":26},"控制目标",{"key":28,"text":148,"correct":22},"进度目标",{"key":31,"text":150,"correct":22},"质量目标",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":20,"analysis":33},49531,"建设工程项目生产过程的总组织者是()。",[155,157,159,161],{"key":20,"text":156,"correct":26},"工程业主方",{"key":24,"text":158,"correct":22},"工程总承包方",{"key":28,"text":160,"correct":22},"工程设计方",{"key":31,"text":162,"correct":22},"工程施工方",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":20,"analysis":33},49533,"建设工程竣工验收的组织者是()。",[167,168,169,170],{"key":20,"text":124,"correct":26},{"key":24,"text":126,"correct":22},{"key":28,"text":120,"correct":22},{"key":31,"text":122,"correct":22},{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":20,"analysis":33},49535,"建设项目相关利益方的项目管理中，作为建设项目管理核心的是（）。",[175,177,179,181],{"key":20,"text":176,"correct":26},"业主方的项目管理",{"key":24,"text":178,"correct":22},"建设项目工程总承包方的项目管理",{"key":28,"text":180,"correct":22},"施工方的项目管理",{"key":31,"text":182,"correct":22},"工程监理方的项目管理",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":31,"analysis":33},49537,"关于工程项目特点的说法，正确的是（）。",[187,189,191,193],{"key":20,"text":188,"correct":22},"工程项目的安全、质量、进度和费用目标可以随时调整",{"key":24,"text":190,"correct":22},"工程项目具有重复性",{"key":28,"text":192,"correct":22},"工程项目具有多次性",{"key":31,"text":194,"correct":26},"工程项目具有明确的建设任务",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":28,"analysis":33},49539,"可行性研究是在()经批准后进行的。",[199,201,203,205],{"key":20,"text":200,"correct":22},"初步设计",{"key":24,"text":202,"correct":22},"投资方案",{"key":28,"text":204,"correct":26},"项目建议书",{"key":31,"text":206,"correct":22},"项目开工报告",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":28,"analysis":33},49540,"在我国的建设程序中，项目的设计、施工，直至项目交付使用称为()。",[211,213,215,217],{"key":20,"text":212,"correct":22},"项目动用(使用)阶段",{"key":24,"text":214,"correct":22},"项目全寿命周期",{"key":28,"text":216,"correct":26},"项目实施阶段",{"key":31,"text":218,"correct":22},"项目决策阶段",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":24,"analysis":33},49542,"建设单位要申请建设用地规划许可证须先取得()。",[223,224,226,228],{"key":20,"text":204,"correct":22},{"key":24,"text":225,"correct":26},"设计方案批复",{"key":28,"text":227,"correct":22},"可行性研究报告批复",{"key":31,"text":229,"correct":22},"建设用地批准书",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":20,"analysis":33},49544,"一个工程项目往往是由多个相互关联的子项目构成的系统，其中一个子项目的失败有可能影响整个项目的功能的实现。这说明工程项目具有()的特点。",[234,236,238,240],{"key":20,"text":235,"correct":26},"整体性",{"key":24,"text":237,"correct":22},"唯一性",{"key":28,"text":239,"correct":22},"单件性",{"key":31,"text":241,"correct":22},"复杂性",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":20,"analysis":33},49546,"施工项目的控制目标不包括()目标。",[246,248,250,252],{"key":20,"text":247,"correct":26},"人员控制",{"key":24,"text":249,"correct":22},"进度控制",{"key":28,"text":251,"correct":22},"质量控制",{"key":31,"text":253,"correct":22},"成本控制",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":28,"analysis":33},49547,"()是按一个设计意图在一个总体设计范围内，由一个或几个单项工程所组成，在经济上实行统一核算，行政上实行统一管理的建设单位。",[258,260,262,264],{"key":20,"text":259,"correct":22},"单项工程",{"key":24,"text":261,"correct":22},"单位工程",{"key":28,"text":263,"correct":26},"建设项目",{"key":31,"text":265,"correct":22},"分项工程",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":28,"analysis":33},49549,"下列建设项目相关方的项目管理中，属于业主方项目管理的是()。",[270,272,274,276],{"key":20,"text":271,"correct":22},"橱柜供应方的项目管理",{"key":24,"text":273,"correct":22},"玻璃幕墙施工分包方的项目管理",{"key":28,"text":275,"correct":26},"房地产项目开发方的项目管理",{"key":31,"text":277,"correct":22},"保障房设计方的项目管理",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":28,"analysis":33},49551,"一个工程项目必须在一个()范围内，由一个或若干个互有内在联系的单项工程所组成。",[282,284,286,288],{"key":20,"text":283,"correct":22},"项目建议书批复",{"key":24,"text":285,"correct":22},"项目可行性研究批复",{"key":28,"text":287,"correct":26},"总体设计或初步设计",{"key":31,"text":289,"correct":22},"承包合同",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":24,"analysis":33},49554,"工程项目管理中所表述的“自项目开始至项目完成”指的是项目的（）。",[294,296,298,300],{"key":20,"text":295,"correct":22},"决策阶段",{"key":24,"text":297,"correct":26},"实施阶段",{"key":28,"text":299,"correct":22},"使用阶段",{"key":31,"text":301,"correct":22},"全寿命周期",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":31,"analysis":33},49556,"工程项目信息管理制度可以用()规定。",[306,308,310,312],{"key":20,"text":307,"correct":22},"信息流程图、信息编码、信息卡和信息申请表",{"key":24,"text":309,"correct":22},"信息结构图、信息类别、信息卡和信息处理表",{"key":28,"text":311,"correct":22},"信息流程图、信息类别、信息卡和信息申请表",{"key":31,"text":313,"correct":26},"信息结构图、信息编码、信息卡和信息处理表",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":20,"analysis":33},49559,"关于我国工程项目管理信息化应用现状的说法，正确的是( )",[318,320,322,324],{"key":20,"text":319,"correct":26},"我国工程项目管理信息化程度依然不高",{"key":24,"text":321,"correct":22},"我国工程项目管理信息化应用水平比较高",{"key":28,"text":323,"correct":22},"我国工程项目管理信息化总体上处在全面应用水平",{"key":31,"text":325,"correct":22},"我国工程项目管理普遍依靠信息化手段进行科学决策",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":31,"analysis":33},49561,"下列选项中，属于项目管理网络平台系统软件的组织设定的是()。",[330,332,334,336],{"key":20,"text":331,"correct":22},"基本组织结构模式设定",{"key":24,"text":333,"correct":22},"项目结构设定",{"key":28,"text":335,"correct":22},"合同结构设定",{"key":31,"text":337,"correct":26},"用户权限设定",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":20,"analysis":33},49564,"下列各项工作中，属于施工阶段业主方项目管理工作的是（）。",[342,344,346,348],{"key":20,"text":343,"correct":26},"组织施工难点、重点项目的施工方案专题研究",{"key":24,"text":345,"correct":22},"编制施工组织设计",{"key":28,"text":347,"correct":22},"组织原材料、构配件的现场检查",{"key":31,"text":349,"correct":22},"制定现场安全和文明施工措施",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":31,"analysis":33},49566,"下列不属于项目经理方面内容的是()。",[354,356,358,360],{"key":20,"text":355,"correct":22},"施工安全管理",{"key":24,"text":357,"correct":22},"施工成本控制",{"key":28,"text":359,"correct":22},"施工进度控制",{"key":31,"text":361,"correct":26},"施工招标管理",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":31,"analysis":33},49569,"下列监理工作任务中，属于施工阶段质量控制主要任务的是()。",[366,368,370,372],{"key":20,"text":367,"correct":22},"审查施工单位选择分包单位的资质",{"key":24,"text":369,"correct":22},"审核施工单位申报的月度和季度计量表",{"key":28,"text":371,"correct":22},"监督施工单位严格按照施工合同规定的工期组织施工",{"key":31,"text":373,"correct":26},"对隐蔽工程在隐蔽前进行检查和签证",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":28,"analysis":33},49571,"监理工程师应当按照工程监理规范的要求，采取()，对建设工程实施监理。",[378,380,382,384],{"key":20,"text":379,"correct":22},"项目策划、实施和监控等方法",{"key":24,"text":381,"correct":22},"组织、管理和经济等手段",{"key":28,"text":383,"correct":26},"旁站、巡视和平行检验等形式",{"key":31,"text":385,"correct":22},"投资、进度和质量控制等方法",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":28,"analysis":33},49574,"在房屋建筑工程施工阶段监理中，监理人员对关键部位、关键工序的施工质量实施全过程现场跟班的监督活动，称为()。",[390,392,394,396],{"key":20,"text":391,"correct":22},"跟踪检测",{"key":24,"text":393,"correct":22},"巡视",{"key":28,"text":395,"correct":26},"旁站监理",{"key":31,"text":397,"correct":22},"平行检验",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":28,"analysis":33},49577,"建设工程总承包的主要意义在于()，以达到为项目建设增值的目的。",[402,404,406,408],{"key":20,"text":403,"correct":22},"通过总价包干，控制建设投资",{"key":24,"text":405,"correct":22},"通过“交钥匙”，提高效率和效益，确保工期和质量",{"key":28,"text":407,"correct":26},"通过设计与施工过程的组织集成，促进设计与施工的紧密结合",{"key":31,"text":409,"correct":22},"总承包单位统一对承包工程的质量、安全、工期、造价全面负责",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":24,"analysis":33},49579,"项目结构图是一个重要的组织工具，它通过树状图的方式对一个项目的结构进行逐层分解，以反映()。",[414,416,418,420],{"key":20,"text":415,"correct":22},"该项目的所有工作阶段",{"key":24,"text":417,"correct":26},"组成该项目的所有工作任务",{"key":28,"text":419,"correct":22},"项目各参与方之间的合同关系",{"key":31,"text":421,"correct":22},"项目管理各工作单位、各工作部门之间的组织关系",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},49582,"下列关于工程分包合同签订的说法中，正确的是()。",[426,428,430,432],{"key":20,"text":427,"correct":22},"工程分包合同均由业主负责签订",{"key":24,"text":429,"correct":26},"施工总承包单位与工程分包单位直接签订合同",{"key":28,"text":431,"correct":22},"工程监理单位与工程分包单位直接签订合同",{"key":31,"text":433,"correct":22},"工程造价咨询公司与工程分包单位签订合同",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":31,"analysis":33},49584,"下列组织工具图表中，用于反映组成工程项目所有工作任务的是()。",[438,440,442,444],{"key":20,"text":439,"correct":22},"组织结构图",{"key":24,"text":441,"correct":22},"工作流程图",{"key":28,"text":443,"correct":22},"管理职能分工表",{"key":31,"text":445,"correct":26},"项目结构图",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},49587,"在组织结构图中，上级工作部门对其直接下属工作部门的指令关系用()。",[450,452,454,456],{"key":20,"text":451,"correct":22},"双向箭线",{"key":24,"text":453,"correct":26},"单向箭线",{"key":28,"text":455,"correct":22},"虚箭线",{"key":31,"text":457,"correct":22},"实箭线",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":28,"analysis":33},49590,"对于由几个分包单位施工的单位工程的质量评定，下列说法正确的是()。",[462,464,466,468],{"key":20,"text":463,"correct":22},"由总包单位按相关规定检验评定分包出去的分项、分部工程的质量等级",{"key":24,"text":465,"correct":22},"分包单位应对工程质量全面负责",{"key":28,"text":467,"correct":26},"总包单位应对工程质量全面负责",{"key":31,"text":469,"correct":22},"以上说法都不正确",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},49592,"下列总承包模式中，属于总承包单位按照合同约定，承担工程项目的设计、采购、施工、试运行服务等工作，并对承包工程的质量、安全、工期、造价全面负责的模式是()。",[474,476,478,480],{"key":20,"text":475,"correct":22},"施工总承包",{"key":24,"text":477,"correct":22},"设计一施工总承包",{"key":28,"text":479,"correct":26},"EPC总承包",{"key":31,"text":481,"correct":22},"施工总承包管理",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":28,"analysis":33},49595,"业主方委托一个施工单位或由多个施工单位组成的施工联合体或施工合作体作为施工总承包管理单位，这种施工任务委托模式是()。",[486,487,489,490],{"key":20,"text":475,"correct":22},{"key":24,"text":488,"correct":22},"施工平行发包",{"key":28,"text":481,"correct":26},{"key":31,"text":491,"correct":22},"建设项目工程总承包",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":28,"analysis":33},49597,"所谓的“施工联合体”，是一种()。",[496,498,500,502],{"key":20,"text":497,"correct":22},"总承包组织",{"key":24,"text":499,"correct":22},"施工承包组织",{"key":28,"text":501,"correct":26},"临时性组织",{"key":31,"text":503,"correct":22},"半永久性组织",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":31,"analysis":33},49600,"认定建设项目属于同一个工程项目范围的标准是()。",[508,510,512,514],{"key":20,"text":509,"correct":22},"取得一份建设工程规划许可证",{"key":24,"text":511,"correct":22},"取得一份项目可行性研究批复",{"key":28,"text":513,"correct":22},"具有一个承包合同",{"key":31,"text":515,"correct":26},"具有一个总体设计或初步设计",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":28,"analysis":33},49603,"建设项目的交工验收是指（）。",[520,522,524,526],{"key":20,"text":521,"correct":22},"分部工程验收",{"key":24,"text":523,"correct":22},"分项工程验收",{"key":28,"text":525,"correct":26},"单位工程验收",{"key":31,"text":527,"correct":22},"单项工程验收",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":20,"analysis":33},49605,"城建档案的编制、验收、报送等工作的负责单位是()。",[532,534,535,537],{"key":20,"text":533,"correct":26},"城建档案管理机构",{"key":24,"text":124,"correct":22},{"key":28,"text":536,"correct":22},"档案管理机构",{"key":31,"text":538,"correct":22},"城建管理机构",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":31,"analysis":33},49608,"城市规划管理部门根据城市规划，在已确定的土地使用功能范围内，对建设项目用地选址定点提出具体意见的文件是()。",[543,544,546,548],{"key":20,"text":229,"correct":22},{"key":24,"text":545,"correct":22},"建设项目选址核准证",{"key":28,"text":547,"correct":22},"建设用地规划许可",{"key":31,"text":549,"correct":26},"建设项目选址意见书",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":28,"analysis":33},49610,"我国建设项目的设计一般分为()两个阶段。",[554,556,558,560],{"key":20,"text":555,"correct":22},"总体规划设计和施工图设计",{"key":24,"text":557,"correct":22},"技术设计和施工图设计",{"key":28,"text":559,"correct":26},"初步设计和施工图设计",{"key":31,"text":561,"correct":22},"初步设计和技术设计",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":20,"analysis":33},49612,"建设单位办理工程质量监督手续是在()。",[566,568,570,572],{"key":20,"text":567,"correct":26},"领取施工许可证或开工报告前",{"key":24,"text":569,"correct":22},"领取施工许可证或开工报告后",{"key":28,"text":571,"correct":22},"领取规划许可证前",{"key":31,"text":573,"correct":22},"勘察设计开始前",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":31,"analysis":33},49615,"建设行政主管部门不得向未取得安全生产许可证的建筑施工企业颁发()。",[578,580,582,584],{"key":20,"text":579,"correct":22},"企业资质证书",{"key":24,"text":581,"correct":22},"安全技术措施",{"key":28,"text":583,"correct":22},"专项安全施工方案",{"key":31,"text":585,"correct":26},"施工许可证",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":20,"analysis":33},49617,"不能称做“项目”的生产活动及其成果特性的是()。",[590,592,594,596],{"key":20,"text":591,"correct":26},"大批量的",{"key":24,"text":593,"correct":22},"投资一次性的",{"key":28,"text":595,"correct":22},"单件性的",{"key":31,"text":235,"correct":22},{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":24,"analysis":33},49619,"工程项目涉及的单位多，各单位之间关系协调的难度和工作量大，这导致了工程项目管理的()。",[601,603,604,605],{"key":20,"text":602,"correct":22},"明确性",{"key":24,"text":241,"correct":26},{"key":28,"text":235,"correct":22},{"key":31,"text":237,"correct":22},[607,610,613,616,619,621],{"id":608,"name":609,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":611,"name":612,"category":7,"favorite":8},30,"经济师",{"id":614,"name":615,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":617,"name":618,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":620,"category":7,"favorite":8},"(初级)保险专业",{"id":622,"name":623,"category":7,"favorite":8},51,"(初级)财政税收"]