[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,22,50,2220,[13,34,46,58,70,82,94,105,117,129,141,153,165,172,184,196,208,219,231,243,255,267,279,291,303,314,326,338,350,362,374,386,398,410,422,433,444,456,468,479,491,503,515,527,535,547,559,570,582,594],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},51301,1,"单选题","下列各项中，不属于建设工程规划管理主要内容的是( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","建筑管理、道路管理",false,{"key":24,"text":25,"correct":22},"B","管线管理、审定设计方案",{"key":27,"text":28,"correct":29},"C","红线管理、黄线管理",true,{"key":31,"text":32,"correct":22},"D","核发建设工程规划许可证","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},51302,"建筑设计一般按初步设计和()设计两个阶段进行。",[38,40,42,44],{"key":20,"text":39,"correct":22},"技术",{"key":24,"text":41,"correct":22},"结构",{"key":27,"text":43,"correct":22},"功能",{"key":31,"text":45,"correct":29},"施工图",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},51303,"对于申请办理施工许可证的程序，对于符合条件的，应当自收到申请之日起（）日内办理施工许可证。",[50,52,54,56],{"key":20,"text":51,"correct":22},"5",{"key":24,"text":53,"correct":22},"10",{"key":27,"text":55,"correct":29},"15",{"key":31,"text":57,"correct":22},"20",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},51304,"建设单位开工前，需要向（ ）申请领取施工许可证。",[62,64,66,68],{"key":20,"text":63,"correct":22},"县级以上人民政府工商行政管理部门",{"key":24,"text":65,"correct":29},"县级以上人民政府建设行政管理部门",{"key":27,"text":67,"correct":22},"市级以上人民政府建设行政管理部门",{"key":31,"text":69,"correct":22},"省级以上人民政府建设行政管理部门",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},51305,"规划地块内各类建筑基底面积占该规划地块用地面积的比例称为( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"容积率",{"key":24,"text":77,"correct":22},"绿地率",{"key":27,"text":79,"correct":22},"建筑限高",{"key":31,"text":81,"correct":29},"建筑密度",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},51306,"下列各项中，不属于住宅设计总的要求所要贯彻的原则的有( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"美观",{"key":24,"text":89,"correct":29},"豪华",{"key":27,"text":91,"correct":22},"舒适",{"key":31,"text":93,"correct":22},"安全",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},51307,"为居民创造一个卫生、安静的居住环境，是居住区规划设计的()要求。",[98,100,102,104],{"key":20,"text":99,"correct":29},"环境",{"key":24,"text":101,"correct":22},"使用",{"key":27,"text":103,"correct":22},"经济",{"key":31,"text":87,"correct":22},{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":27,"analysis":33},51308,"不属于房地产开发项目编制修建性详细规划的重要依据有( )。",[109,111,113,115],{"key":20,"text":110,"correct":22},"容积率、建筑密度",{"key":24,"text":112,"correct":22},"绿地率、建筑高度",{"key":27,"text":114,"correct":29},"管线设置、公园个数",{"key":31,"text":116,"correct":22},"居住人口密度、建筑后退",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},51309,"目前住宅结构形式不包括( )。",[121,123,125,127],{"key":20,"text":122,"correct":29},"居室结构",{"key":24,"text":124,"correct":22},"全装配式结构",{"key":27,"text":126,"correct":22},"大模结构",{"key":31,"text":128,"correct":22},"装配整体式结构",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":20,"analysis":33},51310,"下列各项中，不属于全装配式结构特点的是( )。",[133,135,137,139],{"key":20,"text":134,"correct":29},"造价低",{"key":24,"text":136,"correct":22},"受季节影响小",{"key":27,"text":138,"correct":22},"工厂化程度高",{"key":31,"text":140,"correct":22},"可以利用工业废料",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},51311,"下列不属于房地产开发企业申请领取施工许可证应具备的条件的是（）",[145,147,149,151],{"key":20,"text":146,"correct":22},"已经办理该建筑工程用地批准手续",{"key":24,"text":148,"correct":22},"在城市规划区的建筑工程，已经取得建设工程规划许可证",{"key":27,"text":150,"correct":22},"已经确定施工企业",{"key":31,"text":152,"correct":29},"建设工期超过一年的，到位资金达到10%的。",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":27,"analysis":33},51312,"下列各项中，制定施工方案不包括( )。",[157,159,161,163],{"key":20,"text":158,"correct":22},"施工组织与协调计划",{"key":24,"text":160,"correct":22},"建材与设备供应计划",{"key":27,"text":162,"correct":29},"工程质量控制计划",{"key":31,"text":164,"correct":22},"基础设施配套的接洽与协商计划",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":167,"answer":27,"analysis":33},51313,[168,169,170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":29},{"key":31,"text":32,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":20,"analysis":33},51314,"工程设计资质中的（）只设甲级。",[176,178,180,182],{"key":20,"text":177,"correct":29},"工程设计综合资质",{"key":24,"text":179,"correct":22},"工程设计行业资质",{"key":27,"text":181,"correct":22},"工程设计专业资质",{"key":31,"text":183,"correct":22},"工程设计专项资质",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":24,"analysis":33},51315,"下列各项中，不属于住宅室外装修一般处理方法的是( )。",[188,190,192,194],{"key":20,"text":189,"correct":22},"清水墙勾缝",{"key":24,"text":191,"correct":29},"贴墙纸",{"key":27,"text":193,"correct":22},"水刷石",{"key":31,"text":195,"correct":22},"干粘石",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":27,"analysis":33},51316,"居住人口密度等于( )。",[200,202,204,206],{"key":20,"text":201,"correct":22},"建筑基底占地内的总人口数除以建筑基底占地面积",{"key":24,"text":203,"correct":22},"建设用地内的总人口数除以建筑基底占地面积",{"key":27,"text":205,"correct":29},"建设用地内的总人口数除以建设用地面积",{"key":31,"text":207,"correct":22},"建筑基底占地内总人口数除以建设用地面积",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":24,"analysis":33},51317,"邀请招标一般应选择( )家以上单位参加投标。",[212,214,216,217],{"key":20,"text":213,"correct":22},"2",{"key":24,"text":215,"correct":29},"3",{"key":27,"text":51,"correct":22},{"key":31,"text":218,"correct":22},"7",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":27,"analysis":33},51318,"建设用地规划许可证的审批、发证机构是( )城乡规划行政主管部门。",[223,225,227,229],{"key":20,"text":224,"correct":22},"国务院",{"key":24,"text":226,"correct":22},"省、市政府",{"key":27,"text":228,"correct":29},"县及县以上政府",{"key":31,"text":230,"correct":22},"乡及乡以上政府",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":31,"analysis":33},51319,"在城市规划区内，未取得建设用地规划许可证而取得建设用地批准文件、占用土地的，批准文件无效，占用的土地由( )责令退回。",[235,237,239,241],{"key":20,"text":236,"correct":22},"省级土地管理部门",{"key":24,"text":238,"correct":22},"市级建设管理部门",{"key":27,"text":240,"correct":22},"市级规划管理部门",{"key":31,"text":242,"correct":29},"县及县级以上人民政府",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":24,"analysis":33},51320,"下列各项中，不属于建筑后退规划控制的主要目的的是( )。",[247,249,251,253],{"key":20,"text":248,"correct":22},"避免城市建设过程中产生混乱",{"key":24,"text":250,"correct":29},"保证城市的绿化和开放空间，为人们提供休憩和交流的场所",{"key":27,"text":252,"correct":22},"保证城市消防、防汛、交通等方面的安全防护距离",{"key":31,"text":254,"correct":22},"保持和拥有良好的城市景观和必要的城市公共活动空间",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":27,"analysis":33},51321,"该宗房地产开发用地的楼面地价为( )元／平方米。",[259,261,263,265],{"key":20,"text":260,"correct":22},"1 000",{"key":24,"text":262,"correct":22},"2 000",{"key":27,"text":264,"correct":29},"1350",{"key":31,"text":266,"correct":22},"4 000",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":27,"analysis":33},51322,"2014年5月1日建成时，商品房购买人的土地使用期限在不续期情况下为( )年。",[271,273,275,277],{"key":20,"text":272,"correct":22},"48",{"key":24,"text":274,"correct":22},"50",{"key":27,"text":276,"correct":29},"68",{"key":31,"text":278,"correct":22},"70",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":27,"analysis":33},51323,"房地产开发企业申请领取施工许可证时，建设工期不足一年的，到位资金原则上不得少于工程合同价的______，工期超过一年的，到位资金原则上不得少于工程合同价的______。（ ）",[283,285,287,289],{"key":20,"text":284,"correct":22},"30%；50%",{"key":24,"text":286,"correct":22},"30%；60%",{"key":27,"text":288,"correct":29},"50%；30%",{"key":31,"text":290,"correct":22},"60%，30%",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":24,"analysis":33},51324,"施工现场“三通一平”中的“三通”是指( )。",[295,297,299,301],{"key":20,"text":296,"correct":22},"通给水、排水和道路",{"key":24,"text":298,"correct":29},"通给水、电力和道路",{"key":27,"text":300,"correct":22},"通给水、电信和电力",{"key":31,"text":302,"correct":22},"通电力、燃气和道路",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":24,"analysis":33},51325,"某块土地面积为500平方米，容积率为2，楼面地价为1000元／平方米，则该块土地总价为( )万元。",[307,308,310,312],{"key":20,"text":274,"correct":22},{"key":24,"text":309,"correct":29},"100",{"key":27,"text":311,"correct":22},"400",{"key":31,"text":313,"correct":22},"800",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},51326,"房地产开发建设过程中进行协议招标，一般要求参与议标的单位不得少于( )。",[318,320,322,324],{"key":20,"text":319,"correct":22},"1家",{"key":24,"text":321,"correct":29},"2家",{"key":27,"text":323,"correct":22},"4家",{"key":31,"text":325,"correct":22},"5家",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":27,"analysis":33},51327,"（）是开发企业利用市场竞争的经济手段优选施工等单位。",[330,332,334,336],{"key":20,"text":331,"correct":22},"勘察",{"key":24,"text":333,"correct":22},"设计",{"key":27,"text":335,"correct":29},"招标",{"key":31,"text":337,"correct":22},"投标",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":27,"analysis":33},51328,"在城市、镇规划区内进行临时建设的，应当经（ ）批准。",[342,344,346,348],{"key":20,"text":343,"correct":22},"土地管理部门",{"key":24,"text":345,"correct":22},"县级以上人民政府",{"key":27,"text":347,"correct":29},"城市、县人民政府城乡规划主管部门",{"key":31,"text":349,"correct":22},"城乡规划主管部门",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":31,"analysis":33},51329,"下列各项中，不属于工程勘察的有( )。",[354,356,358,360],{"key":20,"text":355,"correct":22},"地形测量",{"key":24,"text":357,"correct":22},"工程勘察",{"key":27,"text":359,"correct":22},"地下水、地表水勘察",{"key":31,"text":361,"correct":29},"野外调查",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":24,"analysis":33},51330,"（ ）是根据建设工程的要求，对建设工程所需的技术、经济、资源、环境条件进行分析、论证，编制建设工程设计文件的活动。",[366,368,370,372],{"key":20,"text":367,"correct":22},"建设工程勘察",{"key":24,"text":369,"correct":29},"建设工程设计",{"key":27,"text":371,"correct":22},"建设工程招标",{"key":31,"text":373,"correct":22},"建设工程投标",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":27,"analysis":33},51331,"房地产开发项目的工程建设管理，主要是以( )为基础。",[378,380,382,384],{"key":20,"text":379,"correct":22},"合同管理",{"key":24,"text":381,"correct":22},"监督、控制和管理",{"key":27,"text":383,"correct":29},"项目经理负责制",{"key":31,"text":385,"correct":22},"技术活动和经济活动",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":27,"analysis":33},51332,"项目控制与监理是房地产开发过程( )阶段的工作。",[390,392,394,396],{"key":20,"text":391,"correct":22},"投资决策",{"key":24,"text":393,"correct":22},"前期准备",{"key":27,"text":395,"correct":29},"工程建设",{"key":31,"text":397,"correct":22},"市场营销",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":27,"analysis":33},51333,"下列选项中，不属于按照工程项目建设阶段划分的进度计划的是（ ）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"客观进度计划",{"key":24,"text":405,"correct":22},"总进度计划",{"key":27,"text":407,"correct":29},"企业工程进度计划",{"key":31,"text":409,"correct":22},"单位工程进度计划",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":20,"analysis":33},51334,"工程进度管理中的客观进度计划常用的表示方法是（）",[414,416,418,420],{"key":20,"text":415,"correct":29},"横道图法和网络图法",{"key":24,"text":417,"correct":22},"单项工程",{"key":27,"text":419,"correct":22},"单位工程",{"key":31,"text":421,"correct":22},"全部工程",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":27,"analysis":33},51335,"组织工程验收属于( )。",[426,428,430,432],{"key":20,"text":427,"correct":22},"组织管理",{"key":24,"text":429,"correct":22},"进度管理",{"key":27,"text":431,"correct":29},"质量管理",{"key":31,"text":379,"correct":22},{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":31,"analysis":33},51336,"下列指标中，属于房地产开发项目投资效益指标的是( )。",[437,439,441,442],{"key":20,"text":438,"correct":22},"商品房空置率",{"key":24,"text":440,"correct":22},"竣工验收合格率",{"key":27,"text":75,"correct":22},{"key":31,"text":443,"correct":29},"自有资金利润率",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":31,"analysis":33},51337,"下列阶段中不属于房地产开发项目建设过程的是( )。",[448,450,452,454],{"key":20,"text":449,"correct":22},"开发项目建设准备阶段",{"key":24,"text":451,"correct":22},"招标投资阶段",{"key":27,"text":453,"correct":22},"竣工验收阶段",{"key":31,"text":455,"correct":29},"房地产市场分析阶段",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":31,"analysis":33},51338,"下列各项不属于工程进度监理的主要任务的有( )。",[460,462,464,466],{"key":20,"text":461,"correct":22},"对项目建设周期进行具体的论证",{"key":24,"text":463,"correct":22},"编制项目总进度计划和阶段详细进度计划",{"key":27,"text":465,"correct":22},"监督阶段详细进度计划的执行",{"key":31,"text":467,"correct":29},"对取得的实际质量数据和施工单位履行质量职责的程度，与国家有关规定、技术标准进行比较，看其是否合乎要求",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":33},51339,"下列房地产开发项目管理目标中，属于约束性目标的是( )。",[472,474,476,478],{"key":20,"text":473,"correct":29},"建设工期",{"key":24,"text":475,"correct":22},"销售利润",{"key":27,"text":477,"correct":22},"投资回报率",{"key":31,"text":443,"correct":22},{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":20,"analysis":33},51340,"房地产开发项目管理中，工程量增减、索赔等事宜的处理，属于( )管理。",[483,485,487,489],{"key":20,"text":484,"correct":29},"合同",{"key":24,"text":486,"correct":22},"进度",{"key":27,"text":488,"correct":22},"费用",{"key":31,"text":490,"correct":22},"质量",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":31,"analysis":33},51341,"房地产开发企业应当对所售商品房承担质量保修责任，保修期从商品房（ ）之日起计算。",[495,497,499,501],{"key":20,"text":496,"correct":22},"预售",{"key":24,"text":498,"correct":22},"竣工",{"key":27,"text":500,"correct":22},"购买",{"key":31,"text":502,"correct":29},"交付",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":27,"analysis":33},51342,"按照企业所有制性质划分，房地产开发企业分为()。",[507,509,511,513],{"key":20,"text":508,"correct":22},"专门从亊土地和城市基础设施开发的企业和进行土地和地上构筑物综合开发的房地产开发企业",{"key":24,"text":510,"correct":22},"外资房地产开发企业和内资房地产开发企业",{"key":27,"text":512,"correct":29},"公有制的房地产开发企业和非公有制的房地产开发企业",{"key":31,"text":514,"correct":22},"房地产开发专营公司和房地产开发项目公司",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":24,"analysis":33},51343,"关于工程竣工验收和交付使用的说法错误的是（）",[519,521,523,525],{"key":20,"text":520,"correct":22},"竣工验收是施工过程的最后一道程序",{"key":24,"text":522,"correct":29},"房地产开发主管部门应当自收到竣工验收申请之日起20日内，对设计公共安全的内容进行验收。",{"key":27,"text":524,"correct":22},"开发项目竣工验收，除了对主体工程检查验收外，还应进行对附属工程及室外工程的检查验收",{"key":31,"text":526,"correct":22},"经验收合格的项目即可办理交付使用户手续。",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":27,"analysis":33},51344,"项目控制与监理是房地产开发过程（）阶段的工作。",[531,532,533,534],{"key":20,"text":391,"correct":22},{"key":24,"text":393,"correct":22},{"key":27,"text":395,"correct":29},{"key":31,"text":397,"correct":22},{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":31,"analysis":33},51345,"下列关于房地产估价的说法中，错误的是( )。",[539,541,543,545],{"key":20,"text":540,"correct":22},"房地产估价是提供价值意见",{"key":24,"text":542,"correct":22},"房地产估价会有误差",{"key":27,"text":544,"correct":22},"房地产估价既是科学又是艺术",{"key":31,"text":546,"correct":29},"房地产估价是替代市场定价",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":31,"analysis":33},51346,"价值时点本质上是由( )决定的。",[551,553,555,557],{"key":20,"text":552,"correct":22},"估价师",{"key":24,"text":554,"correct":22},"估价委托人",{"key":27,"text":556,"correct":22},"估价对象",{"key":31,"text":558,"correct":29},"估价目的",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},51347,"房地产估价本质上是评估房地产的( )。",[563,565,567,569],{"key":20,"text":564,"correct":22},"交换价值",{"key":24,"text":566,"correct":29},"价格",{"key":27,"text":568,"correct":22},"使用价值",{"key":31,"text":490,"correct":22},{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":27,"analysis":33},51348,"我国1999年发布的房地产估价国家标准的名称是( )。",[574,576,578,580],{"key":20,"text":575,"correct":22},"《房地产估价标准》",{"key":24,"text":577,"correct":22},"《房地产估价准则》",{"key":27,"text":579,"correct":29},"《房地产估价规范》",{"key":31,"text":581,"correct":22},"《房地产估价规程》",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":20,"analysis":33},51349,"一个房地产估价项目中，评估的价值所对应的时间是（ ）。",[586,588,590,592],{"key":20,"text":587,"correct":29},"价值时点",{"key":24,"text":589,"correct":22},"估价师开始估价日期",{"key":27,"text":591,"correct":22},"完成估价工作日期",{"key":31,"text":593,"correct":22},"估价作业日期",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":20,"analysis":33},51350,"不属于房地产估价作用的是( )。",[598,600,602,604],{"key":20,"text":599,"correct":29},"将房地产交易到一个更高的价格",{"key":24,"text":601,"correct":22},"促进房地产公平交易",{"key":27,"text":603,"correct":22},"建立合理的房地产市场秩序",{"key":31,"text":605,"correct":22},"将房地产价格导向正常化",[607,610,613,616,619,621],{"id":608,"name":609,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":611,"name":612,"category":7,"favorite":8},30,"经济师",{"id":614,"name":615,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":617,"name":618,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":620,"category":7,"favorite":8},"(初级)保险专业",{"id":622,"name":623,"category":7,"favorite":8},51,"(初级)财政税收"]