[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,16,50,2220,[13,34,46,58,70,82,94,106,118,130,142,154,166,174,186,198,210,222,234,246,258,270,282,294,306,318,330,342,353,365,377,389,401,413,425,437,449,461,473,485,497,509,521,533,545,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},50998,1,"单选题","通过分部分项工程实际消耗与预算计划的对比，可以（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","计算该分部分项工程的实际成本",false,{"key":24,"text":25,"correct":22},"B","调整该分部分项工程的成本计划",{"key":27,"text":28,"correct":22},"C","把实际消耗控制在预算计划之内",{"key":30,"text":31,"correct":32},"D","发现成本费用偏差和偏差的原因",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},50999,"降低工程项目变动成本的关键是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"降低固定成本的绝对值",{"key":24,"text":41,"correct":22},"减少施工管理人员",{"key":27,"text":43,"correct":22},"增加施工作业人员",{"key":30,"text":45,"correct":32},"降低单位分项工程的消耗定额",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},51000,"工程成本核算的基础是( )。",[50,52,54,56],{"key":20,"text":51,"correct":32},"会计核算",{"key":24,"text":53,"correct":22},"业务核算",{"key":27,"text":55,"correct":22},"统计核算",{"key":30,"text":57,"correct":22},"资金核算",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},51001,"固定成本的特点有( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"工程量与固定费用无关",{"key":24,"text":65,"correct":22},"与工程量成正比",{"key":27,"text":67,"correct":32},"与工程量增减变化无直接关系",{"key":30,"text":69,"correct":22},"工程量完成的越多，分摊的固定费用就越多",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},51002,"工程成本分析的重点内容是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"分析计划成本执行情况",{"key":24,"text":77,"correct":32},"找出影响工程经济效益的主要因素",{"key":27,"text":79,"correct":22},"找出控制工程成本的改进措施",{"key":30,"text":81,"correct":22},"分析技术组织措施的节约效果",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},51003,"工程成本是指企业以施工项目作为成本核算对象的施工过程中所耗费的( )的货币形式。",[86,88,90,92],{"key":20,"text":87,"correct":22},"生产资料转移的价值",{"key":24,"text":89,"correct":22},"劳动力所创造的价值",{"key":27,"text":91,"correct":32},"生产资料转移的价值和劳动力所创造的价值",{"key":30,"text":93,"correct":22},"以上都不是",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},51004,"某施工企业2000年固定成本为1 200元，单位产值变动成本率为O．72，如产值实现8000元，其实际成本将达到( )元。",[98,100,102,104],{"key":20,"text":99,"correct":22},"6 750",{"key":24,"text":101,"correct":22},"6 096",{"key":27,"text":103,"correct":22},"5 670",{"key":30,"text":105,"correct":32},"6 960",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},51005,"以工程成本发生时间划分的成本形式是( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"项目工程成本和企业工程成本",{"key":24,"text":113,"correct":22},"直接成本和间接成本",{"key":27,"text":115,"correct":22},"固定成本和变动成本",{"key":30,"text":117,"correct":32},"预算成本. 计划成本和实际成本",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},51006,"工程成本管理的环节包括( )。",[122,124,126,128],{"key":20,"text":123,"correct":22},"预测. 计划和控制",{"key":24,"text":125,"correct":22},"预测. 计划. 控制和核算",{"key":27,"text":127,"correct":22},"预测. 计划. 控制. 核算和分析",{"key":30,"text":129,"correct":32},"预测. 计划. 控制. 核算. 分析和考核",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":30,"analysis":33},51007,"工程直接成本是指施工过程中直接耗费的( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"构成工程实体的各项支出",{"key":24,"text":137,"correct":22},"有助于工程形成的各项支出",{"key":27,"text":139,"correct":22},"构成工程实体和部分有助于工程形成的各项支出",{"key":30,"text":141,"correct":32},"构成工程实体和有助于工程形成的各项支出",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},51008,"某施工企业在进行工程成本分析时发现机械使用费超支，若想进一步分析超支的具体原因，应采用的分析方法是( )。",[146,148,150,152],{"key":20,"text":147,"correct":22},"对比分析法",{"key":24,"text":149,"correct":22},"平衡分析法",{"key":27,"text":151,"correct":32},"因素分析法",{"key":30,"text":153,"correct":22},"盈亏平衡法",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},51009,"下列关于工程成本核算的说法中，正确的是( )。",[158,160,162,164],{"key":20,"text":159,"correct":22},"工程成本核算与会计核算是并行的两个过程",{"key":24,"text":161,"correct":22},"工程成本核算不受施工企业现行会计制度的约束",{"key":27,"text":163,"correct":22},"工程成本核算的主要总账科目为“生产成本”",{"key":30,"text":165,"correct":32},"工程成本核算要以“谁受益. 谁负担”为准则，将费用计人成本核算对象",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},51010,"按生产费用与工程量的关系划分的工程成本形式是( )。",[170,171,172,173],{"key":20,"text":117,"correct":22},{"key":24,"text":115,"correct":32},{"key":27,"text":113,"correct":22},{"key":30,"text":111,"correct":22},{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},51011,"建立工程成本管理体系的目的是( )。",[178,180,182,184],{"key":20,"text":179,"correct":22},"不断改善工程管理",{"key":24,"text":181,"correct":32},"实现预定的工程目标成本",{"key":27,"text":183,"correct":22},"采用经济. 技术. 组织等降本措施",{"key":30,"text":185,"correct":22},"挖掘降本潜力",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":20,"analysis":33},51012,"采用“按实计算分级编制”方法编制工程项目施工成本计划时，应首先要求成本责任部门或岗位提出( )。",[190,192,194,196],{"key":20,"text":191,"correct":32},"分管成本项目的降低成本计划",{"key":24,"text":193,"correct":22},"分管成本项目的资金计划",{"key":27,"text":195,"correct":22},"分部分项工程的降低成本计划",{"key":30,"text":197,"correct":22},"分部分项工程的资金计划",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":20,"analysis":33},51013,"工程项目成本核算遵循( )。",[202,204,206,208],{"key":20,"text":203,"correct":32},"权责发生制",{"key":24,"text":205,"correct":22},"实际发生制",{"key":27,"text":207,"correct":22},"收益发生制",{"key":30,"text":209,"correct":22},"预算发生制",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":30,"analysis":33},51014,"已知某竣工建筑工程项目人工费成本资料如下： (1)主体工程：结算人工费日单价为40元，总用工数为lO 000工日，实际人工费日单价为45元，总用工数为15 000工日； (2)装饰工程：结算人工费日单价为50元，总用工数为10 000工日，实际人工费日单价为70元，总用工数为10 300工日。 根据以上资料，回答63-66题： 主体工程因用工数变动影响而造成人工费超支额为( )元。",[214,216,218,220],{"key":20,"text":215,"correct":22},"100 000",{"key":24,"text":217,"correct":22},"159 000",{"key":27,"text":219,"correct":22},"180 000",{"key":30,"text":221,"correct":32},"200 000",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},51015,"主体工程因人工费日单价影响而造成人工费超支额为( )元。",[226,228,230,232],{"key":20,"text":227,"correct":22},"73 000",{"key":24,"text":229,"correct":32},"75 000",{"key":27,"text":231,"correct":22},"76 000",{"key":30,"text":233,"correct":22},"77 000",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":20,"analysis":33},51016,"装饰工程因用工数变动影响而造成人工费超支额为( )元。",[238,240,242,244],{"key":20,"text":239,"correct":32},"15 000",{"key":24,"text":241,"correct":22},"16 000",{"key":27,"text":243,"correct":22},"17 000",{"key":30,"text":245,"correct":22},"18 000",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":30,"analysis":33},51017,"核算月度成本时，对由当期工程成本承担而尚未支付的材料费应（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"在支付后计入成本",{"key":24,"text":253,"correct":22},"在当期部分计入工程成本",{"key":27,"text":255,"correct":22},"在成本中摊销",{"key":30,"text":257,"correct":32},"在当期全部计入工程成本",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":30,"analysis":33},51018,"( )是实现成本目标责任制的保证和实现决策目标的重要手段。",[262,264,266,268],{"key":20,"text":263,"correct":22},"成本预测",{"key":24,"text":265,"correct":22},"成本计划",{"key":27,"text":267,"correct":22},"成本控制",{"key":30,"text":269,"correct":32},"成本考核",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":20,"analysis":33},51019,"从主观原因分析，造成工程项目成本失控的关键是( )。",[274,276,278,280],{"key":20,"text":275,"correct":32},"成本责任不到位. 管理混乱",{"key":24,"text":277,"correct":22},"成本核算失真. 滞后",{"key":27,"text":279,"correct":22},"计划成本编制不科学. 不及时",{"key":30,"text":281,"correct":22},"成本分析走过场. 没抓住主要原因",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},51020,"下列各项原则中，核算工程成本或划分工程成本费用界限应遵循的是（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":32},"权责发生制原则",{"key":24,"text":289,"correct":22},"资金收付制原则",{"key":27,"text":291,"correct":22},"收支同步原则",{"key":30,"text":293,"correct":22},"以收定支原则",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":27,"analysis":33},51021,"制定工程成本控制标准是指( )。",[298,300,302,304],{"key":20,"text":299,"correct":22},"规定各项工程成本开支和各种资源消耗的降低额",{"key":24,"text":301,"correct":22},"规定工程成本和相应资源消耗的降低率",{"key":27,"text":303,"correct":32},"规定各项工程成本开支和各种资源消耗的数量界限",{"key":30,"text":305,"correct":22},"规定工程成本和相应资源消耗的差异额",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":27,"analysis":33},51022,"工程成本管理的目的是( )。",[310,312,314,316],{"key":20,"text":311,"correct":22},"采取措施降低工程实际成本",{"key":24,"text":313,"correct":22},"组织工程成本核算和分析",{"key":27,"text":315,"correct":32},"将实际成本控制在计划成本之内",{"key":30,"text":317,"correct":22},"强化对工程成本责任的检查和考核",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},51023,"按工程成本发生的经济性质将成本分为( )。",[322,324,326,328],{"key":20,"text":323,"correct":22},"变动成本. 固定成本",{"key":24,"text":325,"correct":32},"直接成本. 间接成本",{"key":27,"text":327,"correct":22},"计划成本. 实际成本",{"key":30,"text":329,"correct":22},"企业成本. 项目工程成本",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":27,"analysis":33},51024,"项目计划成本的编制依据是( )。",[334,336,338,340],{"key":20,"text":335,"correct":22},"投标价",{"key":24,"text":337,"correct":22},"合同价",{"key":27,"text":339,"correct":32},"预算成本",{"key":30,"text":341,"correct":22},"施工图预算",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},51025,"某工程人工费结算收入为84万元，实际支出为91.7万元，则人工成本降低率为( )。",[346,348,350,351],{"key":20,"text":347,"correct":22},"7．69％",{"key":24,"text":349,"correct":32},"-8．33％",{"key":27,"text":347,"correct":22},{"key":30,"text":352,"correct":22},"8．33％",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":30,"analysis":33},51026,"项目成本降低额是考核项目成本目标的依据，其内容是指( )的差额。",[357,359,361,363],{"key":20,"text":358,"correct":22},"预算成本与目标成本",{"key":24,"text":360,"correct":22},"计划成本与目标成本",{"key":27,"text":362,"correct":22},"预算成本与实际成本",{"key":30,"text":364,"correct":32},"计划成本与实际成本",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":27,"analysis":33},51027,"某建筑公司，去年预算成本76642.905元，施工产值为81535.00万元，实际成本为75110万元。其中变动成本为60353.8万元，固定成本为14756.20万元，根据今年的经营形势，预计固定成本将增加708万元，可实现产值90000万元，试分析计算：(保留2位小数 预算成本与产值比例为()。",[369,371,373,375],{"key":20,"text":370,"correct":22},"0．91",{"key":24,"text":372,"correct":22},"0．83",{"key":27,"text":374,"correct":32},"0．94",{"key":30,"text":376,"correct":22},"0．95",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":20,"analysis":33},51028,"某建筑公司，去年预算成本76642.905元，施工产值为81535.00万元，实际成本为75110万元。其中变动成本为60353.8万元，固定成本为14756.20万元，根据今年的经营形势，预计固定成本将增加708万元，可实现产值90000万元，试分析计算：(保留2位小数 当今年产值实现90000万元，那么实际成本为()。",[381,383,385,387],{"key":20,"text":382,"correct":32},"82064.20万元",{"key":24,"text":384,"correct":22},"82064.29万元",{"key":27,"text":386,"correct":22},"82064万元",{"key":30,"text":388,"correct":22},"82065万元",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},51029,"根据历史成本的间接费用支出，结合压缩费用措施，可测算工程项目的( )。",[393,395,397,399],{"key":20,"text":394,"correct":22},"直接成本",{"key":24,"text":396,"correct":32},"间接成本",{"key":27,"text":398,"correct":22},"实际成本",{"key":30,"text":400,"correct":22},"计划成本",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":27,"analysis":33},51030,"在某地注册的一家一级资质地方建筑施工企业，计划申领相应的安全生产许可证，并根据取得安全生产许可证应当具备的安全生产条件要求，准备了以下申报资料：安全生产规章制度，主要负责人，项目负责人，专职安全生产管理人员的安全生产知识考核合格证书，特种作业人员操作资格证书，管理人员和作业人员年度安全生产教育培训考核合格资料，工伤保险和意外伤害保险合同。 回答1-5题: 该施工企业应将申报材料报送（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"县建设行政主管部门",{"key":24,"text":408,"correct":22},"地区建设行政主管部门",{"key":27,"text":410,"correct":32},"省建设行政主管部门",{"key":30,"text":412,"correct":22},"国务院建设行政主管部门",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":30,"analysis":33},51031,"安全生产管理是一门综合性的系统科学，其内容不包括( )。",[417,419,421,423],{"key":20,"text":418,"correct":22},"安全法规",{"key":24,"text":420,"correct":22},"安全技术",{"key":27,"text":422,"correct":22},"工业卫生",{"key":30,"text":424,"correct":32},"质量意识教育",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":27,"analysis":33},51032,"现行《建筑施工安全检查标准》检查评价的对象是建筑施工中( )。",[429,431,433,435],{"key":20,"text":430,"correct":22},"基础. 结构和装修阶段的施工工艺",{"key":24,"text":432,"correct":22},"人. 物和环境因素",{"key":27,"text":434,"correct":32},"易发生伤亡事故的主要环节. 部位和工艺",{"key":30,"text":436,"correct":22},"安全组织. 安全管理和安全技术",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},51033,"现行《建筑施工安全检查标准》将检查对象分为( )。",[441,443,445,447],{"key":20,"text":442,"correct":32},"十个分项",{"key":24,"text":444,"correct":22},"十七张项目检查表",{"key":27,"text":446,"correct":22},"十七张分项检查表",{"key":30,"text":448,"correct":22},"十个检查项目",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},51034,"依据《建筑施工安全检查标准》(JGJ59-2011)，施工现场安全生产情况的评价等级分为( )。",[453,455,457,459],{"key":20,"text":454,"correct":22},"合格. 基本合格. 不合格",{"key":24,"text":456,"correct":32},"优良. 合格. 不合格",{"key":27,"text":458,"correct":22},"安全. 较安全. 不安全",{"key":30,"text":460,"correct":22},"很安全. 较安全. 不安全",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},51036,"对新工人的三级安全教育是指( )。",[465,467,469,471],{"key":20,"text":466,"correct":22},"政府. 企业和班组安全教育",{"key":24,"text":468,"correct":32},"公司. 分公司(工程处)和班组安全教育",{"key":27,"text":470,"correct":22},"公司. 项目和班组安全教育",{"key":30,"text":472,"correct":22},"政府. 企业和项目安全教育",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},51037,"如该施工企业领取了安全生产许可证，其有效期为（ ）年。",[477,479,481,483],{"key":20,"text":478,"correct":22},"2",{"key":24,"text":480,"correct":32},"3",{"key":27,"text":482,"correct":22},"4",{"key":30,"text":484,"correct":22},"5",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":27,"analysis":33},51038,"工程监理单位应对建设工程安全生产承担( )。",[489,491,493,495],{"key":20,"text":490,"correct":22},"相关责任",{"key":24,"text":492,"correct":22},"连带责任",{"key":27,"text":494,"correct":32},"监理责任",{"key":30,"text":496,"correct":22},"主要责任",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},51039,"建筑施工行业是事故多发的高危行业，每年因生产安全事故造成的死亡人数居全同各行业的( )。",[501,503,505,507],{"key":20,"text":502,"correct":22},"第一位",{"key":24,"text":504,"correct":32},"第二位",{"key":27,"text":506,"correct":22},"第三位",{"key":30,"text":508,"correct":22},"第四位",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":30,"analysis":33},51040,"建设单位申领施工许可证时应提交（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"安全生产保证金",{"key":24,"text":516,"correct":22},"安全施工措施费",{"key":27,"text":518,"correct":22},"安全环保承诺报告",{"key":30,"text":520,"correct":32},"安全施工措施资料",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":27,"analysis":33},51041,"工程监理单位在实施监理过程中，发现存在严重的安全事故隐患时，应当要求施工单位( )。",[525,527,529,531],{"key":20,"text":526,"correct":22},"组织检查",{"key":24,"text":528,"correct":22},"立即报告上级部门",{"key":27,"text":530,"correct":32},"停工整改",{"key":30,"text":532,"correct":22},"开展安全教育",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":27,"analysis":33},51042,"施工安全交底、检查和验收的依据是施工组织设计（施工方案）规定的（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"施工工艺措施",{"key":24,"text":540,"correct":22},"施工进度计划",{"key":27,"text":542,"correct":32},"安全技术措施",{"key":30,"text":544,"correct":22},"资源配置计划",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":33},51043,"建设项目基础施工阶段，施工现场最易发生的两类生产安全事故为（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":32},"土方坍塌. 窒息中毒",{"key":24,"text":552,"correct":22},"土方坍塌，机械伤害",{"key":27,"text":554,"correct":22},"物体打击. 窒息中毒",{"key":30,"text":556,"correct":22},"高处坠落. 触电伤亡",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},51044,"建设单位在编制工程概算时，应确定建设工程( )。",[561,563,565,567],{"key":20,"text":562,"correct":22},"安全生产和文明施工标准",{"key":24,"text":564,"correct":32},"安全作业环境及安全施工措施所需费用",{"key":27,"text":566,"correct":22},"安全防护用具和安全防护设施单价",{"key":30,"text":568,"correct":22},"安全技术措施和专项施工方案计划",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":20,"analysis":33},51045,"申请领取施工许可证时,提供建设工程有关安全施工措施资料的单位应是( )。",[573,575,577,579],{"key":20,"text":574,"correct":32},"建设单位",{"key":24,"text":576,"correct":22},"施工总承包单位",{"key":27,"text":578,"correct":22},"设计单位",{"key":30,"text":580,"correct":22},"工程监理单位",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":20,"analysis":33},51046,"施工企业提高全员安全素质、实现安全生产的基础是（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":32},"开展安全生产教育",{"key":24,"text":588,"correct":22},"明确安全生产责任",{"key":27,"text":590,"correct":22},"制定安全技术措施",{"key":30,"text":592,"correct":22},"落实安全生产费用",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":30,"analysis":33},51047,"安全技术措施是指( )。",[597,599,601,603],{"key":20,"text":598,"correct":22},"为改进施工操作方法消除危险因素而采取的技术措施",{"key":24,"text":600,"correct":22},"为机械设备增加安全装置",{"key":27,"text":602,"correct":22},"设备安全",{"key":30,"text":604,"correct":32},"为预防伤亡事故和减轻劳动强度而采取的技术措施",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":30,"analysis":33},51048,"工程监理单位应当审查施工组织设计中的安全技术措施或者专项施工方案是否符合工程建设( )。",[609,611,613,615],{"key":20,"text":610,"correct":22},"技术标准",{"key":24,"text":612,"correct":22},"设计标准",{"key":27,"text":614,"correct":22},"验收规范",{"key":30,"text":616,"correct":32},"强制性标准",[618,621,624,627,630,632],{"id":619,"name":620,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":622,"name":623,"category":7,"favorite":8},30,"经济师",{"id":625,"name":626,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":628,"name":629,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":631,"category":7,"favorite":8},"(初级)保险专业",{"id":633,"name":634,"category":7,"favorite":8},51,"(初级)财政税收"]