[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":603},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,15,50,2220,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,200,212,220,231,243,255,267,279,291,303,315,327,339,349,361,373,385,397,409,421,433,445,457,469,481,490,502,514,526,538,549,561,571,583,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},50941,1,"单选题","劳动定额的工人工作时间中，为保证基本工作能顺利完成所消耗的时间，称为工人的( )工作时间。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","基本",false,{"key":24,"text":25,"correct":26},"B","辅助",true,{"key":28,"text":29,"correct":22},"C","准备",{"key":31,"text":32,"correct":22},"D","有效","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},50944,"一塔式起重机吊装楼板至三层，每次吊装1块。每次吊装的各组成部分延续时间如下：挂钩时的停车50秒，将楼板送至12米高度35秒，起重机回转悬臂40秒，将楼板放于安装地点30秒，摘钩时的停车50秒，回转悬臂放下吊索以便再次提升65秒，总计270秒。该机械在8 小时工作班内纯工作6.5小时。 根据以上资料，回答下列问题： 该起重机纯工作l小时应完成吊装楼板( )块。",[38,40,42,44],{"key":20,"text":39,"correct":22},"12．33",{"key":24,"text":41,"correct":26},"13．33",{"key":28,"text":43,"correct":22},"14．33",{"key":31,"text":45,"correct":22},"15．33",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},50946,"某施工队在200个工日内完成了800立方米的工程，但有400立方米不符合质量要求。 根据所学知识，回答问题。 上述施工队的时间定额为()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"0.25工日\u002F立方米",{"key":24,"text":53,"correct":26},"0.5工日\u002F立方米",{"key":28,"text":55,"correct":22},"2工日\u002F立方米",{"key":31,"text":57,"correct":22},"4工日\u002F立方米",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},50948,"（ ）的工程建设项目，必须采用工程量清单计价。",[62,64,66,68],{"key":20,"text":63,"correct":22},"国家重点建设",{"key":24,"text":65,"correct":22},"利用外国政府或国际组织贷款. 援助资金",{"key":28,"text":67,"correct":26},"全部使用国有资金投资或国有资金投资为主",{"key":31,"text":69,"correct":22},"关系社会公共利益. 公众安全",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},50951,"《建设工程工程量清单计价规范》（GB50500—2008）规定，分部分项工程量清单的项目编码用（ ）位阿拉伯数字表示。",[74,76,78,80],{"key":20,"text":75,"correct":22},"9",{"key":24,"text":77,"correct":22},"10",{"key":28,"text":79,"correct":22},"11",{"key":31,"text":81,"correct":26},"12",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},50953,"在工程量清单计价模式下，下列各项因不可抗力导致的损失或费用中，应由承包人承担的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"工程本身损害导致的损失",{"key":24,"text":89,"correct":22},"工程所需清理费用",{"key":28,"text":91,"correct":26},"承包人机械设备损坏的损失",{"key":31,"text":93,"correct":22},"因工程损害导致第三方人员伤亡的相应费用",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},50954,"采用工程量清单方式招标，招标工程量清单必须作为招标文件的组成部分，其准确性、完整性由( )负责。",[98,100,102,104],{"key":20,"text":99,"correct":26},"招标人",{"key":24,"text":101,"correct":22},"投标人",{"key":28,"text":103,"correct":22},"招标机构",{"key":31,"text":105,"correct":22},"投标单位",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},50955,"下列说法不正确的是（ ）",[110,112,114,116],{"key":20,"text":111,"correct":22},"经承发包双方确认调整的合同价款，作为追加（减）合同价款， 与工程进度款或结算款同期支付；",{"key":24,"text":113,"correct":26},"招标工程以合同签订前28天为基准日，其后因国家法律法规变化的，应调整合同价款；",{"key":28,"text":115,"correct":22},"因承包人原因导致工期延误的，在合同工程原定竣工时间之后，合同价款调增的不予调整，合同价款调减的予以调整；",{"key":31,"text":117,"correct":22},"如果承发包双方就合同价格和工期调整无法达成一致时，双方可在合同约定中由总监工程师承担商定与确定的组织和实施责任。",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},50956,"下列项目中，不属于规费项目清单内容的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"工程排污费",{"key":24,"text":125,"correct":22},"危险作业意外伤害保险",{"key":28,"text":127,"correct":26},"劳动保险费",{"key":31,"text":129,"correct":22},"医疗保险费",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},50957,"下列关于工程计价争议处理的说法中，错误的是( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"发. 承包双方发生工程造价合同纠纷时，可以协商解决",{"key":24,"text":137,"correct":22},"发. 承包双方发生工程造价合同纠纷时，可以提请调解",{"key":28,"text":139,"correct":26},"调节是在自愿的基础上进行的，其结果同样具有法律约束力",{"key":31,"text":141,"correct":22},"发. 承包双方发生工程造价合同纠纷时，可以提请仲裁或诉讼",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},50958,"为完成工程项目施工，发生于该工程施工准备和施工过程中的技术、生活、安全、环境保护等方面的非工程实体项目是( )项目。",[146,148,150,152],{"key":20,"text":147,"correct":26},"措施",{"key":24,"text":149,"correct":22},"其他",{"key":28,"text":151,"correct":22},"补充",{"key":31,"text":153,"correct":22},"规费",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},50959,"下列各项因不可抗力导致的费用或伤害中，应由承包人承担的是( )。",[158,160,162,164],{"key":20,"text":159,"correct":22},"工程本身的损害",{"key":24,"text":161,"correct":22},"工程所需清理. 修复费用",{"key":28,"text":163,"correct":22},"因工程损害导致第三方人员伤亡",{"key":31,"text":165,"correct":26},"施工机械的损坏及停工损失",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},50960,"根据《建设工程量清单计价规范》(GB 50500—2008)，在工程计价中，对工程造价依据、办法以及相关政策规定发生争议事项的，由( )负责解释。",[170,172,174,176],{"key":20,"text":171,"correct":26},"工程造价管理机构",{"key":24,"text":173,"correct":22},"发包方",{"key":28,"text":175,"correct":22},"行业建设主管部门",{"key":31,"text":177,"correct":22},"承包方",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},50961,"工程量清单补充项目的编码由附录的顺序码与B和( )位阿拉伯数字组成。",[182,184,186,188],{"key":20,"text":183,"correct":26},"三",{"key":24,"text":185,"correct":22},"四",{"key":28,"text":187,"correct":22},"五",{"key":31,"text":189,"correct":22},"六",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},50962,"工程量清单应由具有编制招标文件能力的( )或受其委托具有相应资质的中介机构进行编制。",[194,196,197,199],{"key":20,"text":195,"correct":22},"招标代理机构",{"key":24,"text":101,"correct":22},{"key":28,"text":198,"correct":22},"招投标管理机构",{"key":31,"text":99,"correct":26},{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":28,"analysis":33},50963,"工程量清单计价模式下的工程费用包括分部分项工程费、措施项目费、其他项目费和( )。",[204,206,208,210],{"key":20,"text":205,"correct":22},"管理费. 税金",{"key":24,"text":207,"correct":22},"材料费. 规费",{"key":28,"text":209,"correct":26},"规费. 税金",{"key":31,"text":211,"correct":22},"管理费. 规费",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":28,"analysis":33},50964,"分部分项工程量清单项目编码以( )级编码设置。",[216,217,218,219],{"key":20,"text":183,"correct":22},{"key":24,"text":185,"correct":22},{"key":28,"text":187,"correct":26},{"key":31,"text":189,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":31,"analysis":33},50965,"根据《建设工程工程量清单计价规范》，应列入其他项目清单项目的是( )。",[224,225,227,229],{"key":20,"text":123,"correct":22},{"key":24,"text":226,"correct":22},"工程定额测定费",{"key":28,"text":228,"correct":22},"社会保障费",{"key":31,"text":230,"correct":26},"总承包服务费",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":28,"analysis":33},50966,"在编制招标控制价时，暂估价中专业工程金额应（ ）填写。",[235,237,239,241],{"key":20,"text":236,"correct":22},"工程造价管理机构发布的工程造价信息中的金额",{"key":24,"text":238,"correct":22},"省级. 行业建设主管部门公布的价格",{"key":28,"text":240,"correct":26},"按招标工程量清单中列出的金额",{"key":31,"text":242,"correct":22},"已标价工程量清单中列出的金额",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":20,"analysis":33},50967,"在工程计价争议处理方法中，解决争执最基本、最常见和最有效的方法为（ ）。",[247,249,251,253],{"key":20,"text":248,"correct":26},"协商",{"key":24,"text":250,"correct":22},"调解",{"key":28,"text":252,"correct":22},"仲裁",{"key":31,"text":254,"correct":22},"诉讼",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":28,"analysis":33},50968,"根据《建设工程工程量清单计价规范》，对任一招标工程量清单项目，如果因工程量偏差和工程量变更等原因导致工程量偏差超过5%，且不超过15%时，应( )。",[259,261,263,265],{"key":20,"text":260,"correct":22},"调整其综合单价",{"key":24,"text":262,"correct":22},"调整其措施费",{"key":28,"text":264,"correct":26},"执行原有的综合单价",{"key":31,"text":266,"correct":22},"调整其他项目费",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":20,"analysis":33},50969,"关于合同价款约定一般规定的说法，正确的是( )。",[271,273,275,277],{"key":20,"text":272,"correct":26},"实行工程量清单计价的工程应采用单价合同",{"key":24,"text":274,"correct":22},"招标文件与中标人投标文件不一致的地方应以招标文件为准",{"key":28,"text":276,"correct":22},"实行工程量清单计价的工程应采用总价合同",{"key":31,"text":278,"correct":22},"实行工程量清单计价的工程应采用成本加酬金合同",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":31,"analysis":33},50970,"按照我国现行财务会计制度规定，工程成本计算和分配的方法采用( )。",[283,285,287,289],{"key":20,"text":284,"correct":22},"目标成本法",{"key":24,"text":286,"correct":22},"直接成本法",{"key":28,"text":288,"correct":22},"完全成本法",{"key":31,"text":290,"correct":26},"制造成本法",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":28,"analysis":33},50971,"按成本的经济性质，工程成本由( )组成。",[295,297,299,301],{"key":20,"text":296,"correct":22},"变动成本和固定成本",{"key":24,"text":298,"correct":22},"制造成本和完全成本",{"key":28,"text":300,"correct":26},"直接成本和间接成本",{"key":31,"text":302,"correct":22},"预算成本和实际成本",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":31,"analysis":33},50972,"构成工程实体主要材料的成本属于( )。",[307,309,311,313],{"key":20,"text":308,"correct":22},"间接成本",{"key":24,"text":310,"correct":22},"变动成本",{"key":28,"text":312,"correct":22},"固定成本",{"key":31,"text":314,"correct":26},"直接成本",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":24,"analysis":33},50973,"材料二次搬运费属于（ ）。",[319,321,323,325],{"key":20,"text":320,"correct":22},"材料费",{"key":24,"text":322,"correct":26},"其他直接费",{"key":28,"text":324,"correct":22},"直接费",{"key":31,"text":326,"correct":22},"间接费",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":28,"analysis":33},50974,"工程成本管理中将实际成本与预算成本的差额称为( )。",[331,333,335,337],{"key":20,"text":332,"correct":22},"项目成本降低额",{"key":24,"text":334,"correct":22},"管理成本降低额",{"key":28,"text":336,"correct":26},"实际成本降低额",{"key":31,"text":338,"correct":22},"计划成本降低额",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":20,"analysis":33},50975,"我国现行财务会计制度规定的建筑施工企业工程成本计算和分配方法是（ ）。",[343,344,346,348],{"key":20,"text":290,"correct":26},{"key":24,"text":345,"correct":22},"变动成本法",{"key":28,"text":347,"correct":22},"间接成本法",{"key":31,"text":286,"correct":22},{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":28,"analysis":33},50976,"落实成本责任的首要前提是( )。",[353,355,357,359],{"key":20,"text":354,"correct":22},"科学地预测实际成本",{"key":24,"text":356,"correct":22},"切实做好成本分析",{"key":28,"text":358,"correct":26},"科学地编制计划成本",{"key":31,"text":360,"correct":22},"提高全员成本意识",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":20,"analysis":33},50977,"工程成本核算对象一般是( )。",[365,367,369,371],{"key":20,"text":366,"correct":26},"单位工程",{"key":24,"text":368,"correct":22},"分部分项工程",{"key":28,"text":370,"correct":22},"施工项目成本形成的各个阶段",{"key":31,"text":372,"correct":22},"施工项目的职能部门. 施工队和作业班组",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},50978,"在进行工程成本核算时，应划清收益性支出和资本性支出的界限。下列各项支出中，属于资本性支出的是( )。",[377,379,381,383],{"key":20,"text":378,"correct":22},"机械使用费用的支出",{"key":24,"text":380,"correct":26},"购买固定资产的支出",{"key":28,"text":382,"correct":22},"企业财务费用的支出",{"key":31,"text":384,"correct":22},"企业管理费用的支出",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":28,"analysis":33},50979,"施工企业成本包括( )两个部分。",[389,391,393,395],{"key":20,"text":390,"correct":22},"资本化成本和费用化成本",{"key":24,"text":392,"correct":22},"直接工程成本和措施成本",{"key":28,"text":394,"correct":26},"工程成本和期间成本",{"key":31,"text":396,"correct":22},"变动成本和间接成本",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},50980,"某建筑公司，去年预算成本76642．905元，施工产值为81535．OO万元，实际成本为751lO万元。其中变动成本为60353.8万元，固定成本为14756.20万元，根据今年的经营形势，预计固定成本支出将增加708万元，可实现产值90000万元。 根据以上材料，回答10-14题(保留2位小数)： 单位产值变动成本率为( )。",[401,403,405,407],{"key":20,"text":402,"correct":26},"0．74",{"key":24,"text":404,"correct":22},"0．78",{"key":28,"text":406,"correct":22},"0．84",{"key":31,"text":408,"correct":22},"0．70",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":20,"analysis":33},50981,"今年的保本点产值最低为( )万元。",[413,415,417,419],{"key":20,"text":414,"correct":26},"77 321",{"key":24,"text":416,"correct":22},"77 325",{"key":28,"text":418,"correct":22},"77 320",{"key":31,"text":420,"correct":22},"77 330",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":24,"analysis":33},50982,"实际成本降低率为( )。",[425,427,429,431],{"key":20,"text":426,"correct":22},"5％",{"key":24,"text":428,"correct":26},"3％",{"key":28,"text":430,"correct":22},"2％",{"key":31,"text":432,"correct":22},"1％",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":24,"analysis":33},50983,"下列各项工程成本中，属于固定成本的是( )。",[437,439,441,443],{"key":20,"text":438,"correct":22},"直接人工费",{"key":24,"text":440,"correct":26},"管理人员工资",{"key":28,"text":442,"correct":22},"直接材料费",{"key":31,"text":444,"correct":22},"检验试验费",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":31,"analysis":33},50984,"施工项目成本预测是( )。",[449,451,453,455],{"key":20,"text":450,"correct":22},"评价实际成本的依据",{"key":24,"text":452,"correct":22},"编制预算成本的依据",{"key":28,"text":454,"correct":22},"考核项目成本目标的依据",{"key":31,"text":456,"correct":26},"施工项目成本决策与计划的依据",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":20,"analysis":33},50985,"某建筑施工企业在进行工程成本预测和计划时，采用了量本利分析法，该企业去年年度施工产值和工程成本构成情况如下： (1)施工产值为4 250万元； (2)预算成本为3 850万元； (3)实际成本为3 750万元，其中变动成本为3 150万元，固定成本为600万元。 根据今年经营的实际情况和成本降低计划，预计今年固定成本支出将减少80万元。预计今年施工产值为5 000万元。 根据以上材料,回答17-20题: 今年的保本产值为( )万元。",[461,463,465,467],{"key":20,"text":462,"correct":26},"3 058．824",{"key":24,"text":464,"correct":22},"3 636．363",{"key":28,"text":466,"correct":22},"3 683．333",{"key":31,"text":468,"correct":22},"4 250．000",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":31,"analysis":33},50986,"今年的预算成本预计为( )万元。",[473,475,477,479],{"key":20,"text":474,"correct":22},"3 750",{"key":24,"text":476,"correct":22},"4 220",{"key":28,"text":478,"correct":22},"4 350",{"key":31,"text":480,"correct":26},"4 550",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":24,"analysis":33},50987,"今年的实际成本预计为( )万元。",[485,486,487,488],{"key":20,"text":474,"correct":22},{"key":24,"text":476,"correct":26},{"key":28,"text":478,"correct":22},{"key":31,"text":489,"correct":22},"4 530",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},50988,"影响工程成本的因素不包括( )。",[494,496,498,500],{"key":20,"text":495,"correct":26},"工程质量",{"key":24,"text":497,"correct":22},"完成单位工程量的物资和活劳动消耗数量",{"key":28,"text":499,"correct":22},"物资和活劳动的单价",{"key":31,"text":501,"correct":22},"工程量",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},50989,"下列各项中，( )不属于工程成本。",[506,508,510,512],{"key":20,"text":507,"correct":26},"企业管理费",{"key":24,"text":509,"correct":22},"生产工人的工资",{"key":28,"text":511,"correct":22},"施工机械的租赁费",{"key":31,"text":513,"correct":22},"消耗的主辅材料的购置费",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},50990,"分摊应由当期负担而尚未支付的费用，在成本核算处理中应( )。",[518,520,522,524],{"key":20,"text":519,"correct":22},"先按计划成本数预提，以后再调整",{"key":24,"text":521,"correct":26},"按应分摊实际数预提",{"key":28,"text":523,"correct":22},"先按预算成本数预提，以后再调整",{"key":31,"text":525,"correct":22},"暂不计人成本",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":28,"analysis":33},50991,"财会部门核算工程成本的主要依据是（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"核算范围和核算标准",{"key":24,"text":533,"correct":22},"成本计划和降低成本措施",{"key":28,"text":535,"correct":26},"统计核算和业务核算资料",{"key":31,"text":537,"correct":22},"概算定额和预算定额",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":28,"analysis":33},50992,"完善成本控制的运行机制不包括( )。",[542,544,546,548],{"key":20,"text":543,"correct":22},"加强中间检查控制",{"key":24,"text":545,"correct":22},"落实各级人员的成本责任",{"key":28,"text":547,"correct":26},"加强组织建设",{"key":31,"text":360,"correct":22},{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":28,"analysis":33},50993,"工程的预算成本反映的是( )。",[553,555,557,559],{"key":20,"text":554,"correct":22},"本企业的平均成本水平",{"key":24,"text":556,"correct":22},"建筑业的平均成本水平",{"key":28,"text":558,"correct":26},"各地区建筑业的平均成本水平",{"key":31,"text":560,"correct":22},"各国建筑业的平均成本水平",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":24,"analysis":33},50994,"施工企业成本由以下两个部分组成( )。",[565,567,568,570],{"key":20,"text":566,"correct":22},"项目成本和财务成本",{"key":24,"text":394,"correct":26},{"key":28,"text":569,"correct":22},"制造成本和管理成本",{"key":31,"text":300,"correct":22},{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":31,"analysis":33},50995,"工程预算成本可作为( )。",[575,577,579,581],{"key":20,"text":576,"correct":22},"工程的投标报价",{"key":24,"text":578,"correct":22},"工程的概算成本",{"key":28,"text":580,"correct":22},"核算实际成本的依据",{"key":31,"text":582,"correct":26},"编制计划成本的依据",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":28,"analysis":33},50996,"临时设施摊销费属于( )。",[587,588,590,591],{"key":20,"text":320,"correct":22},{"key":24,"text":589,"correct":22},"机械使用费",{"key":28,"text":322,"correct":26},{"key":31,"text":326,"correct":22},{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":28,"analysis":33},50997,"工程成本核算的依据是( )。",[596,598,600,602],{"key":20,"text":597,"correct":22},"成本计划和施工计划",{"key":24,"text":599,"correct":22},"预算成本和计划成本",{"key":28,"text":601,"correct":26},"统计核算和业务核算",{"key":31,"text":537,"correct":22},[604,607,610,613,616,618],{"id":605,"name":606,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":608,"name":609,"category":7,"favorite":8},30,"经济师",{"id":611,"name":612,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":614,"name":615,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":617,"category":7,"favorite":8},"(初级)保险专业",{"id":619,"name":620,"category":7,"favorite":8},51,"(初级)财政税收"]