[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,14,50,2220,[13,34,46,58,70,82,94,106,118,130,142,154,166,177,189,201,212,222,231,243,255,267,279,291,303,314,326,338,350,362,372,384,396,407,419,428,440,451,463,475,487,496,508,516,534,544,556,567,579,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},50844,1,"单选题","砂浆总消耗量为（ ）m3。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","0.2125",false,{"key":24,"text":25,"correct":22},"B","0.2215",{"key":27,"text":28,"correct":22},"C","0.2236",{"key":30,"text":31,"correct":32},"D","0.2305",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},50845,"( )不是施工图预算的作用。",[38,40,42,44],{"key":20,"text":39,"correct":22},"确定工程造价的依据",{"key":24,"text":41,"correct":22},"建设单位与施工单位进行招. 投标签订承包合同的依据",{"key":27,"text":43,"correct":32},"选择确定设计方案的依据",{"key":30,"text":45,"correct":22},"支付工程价款及工程结算的依据",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},50847,"预算定额的编制应遵循( )原则。",[50,52,54,56],{"key":20,"text":51,"correct":22},"一般水平",{"key":24,"text":53,"correct":32},"统一性和差别性相结合",{"key":27,"text":55,"correct":22},"以专家为主",{"key":30,"text":57,"correct":22},"独立自主",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},50848,"下列工人工作时间中，属于损失时间的是( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"休息时间",{"key":24,"text":65,"correct":22},"不可避免中断时间",{"key":27,"text":67,"correct":22},"辅助工作时间",{"key":30,"text":69,"correct":32},"停工时间",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},50850,"将建设工程定额分为劳动定额、材料消耗定额和施工机械台班使用定额，是按 ( )进行的分类。",[74,76,78,80],{"key":20,"text":75,"correct":32},"生产要素内容",{"key":24,"text":77,"correct":22},"编制程序和用途",{"key":27,"text":79,"correct":22},"编制单位和适用范围",{"key":30,"text":81,"correct":22},"投资的费用性质",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},50851,"编制施工图预算，确定工程造价、控制建设工程投资的依据是( )。",[86,88,90,92],{"key":20,"text":87,"correct":32},"预算定额",{"key":24,"text":89,"correct":22},"材料消耗定额",{"key":27,"text":91,"correct":22},"劳动定额",{"key":30,"text":93,"correct":22},"概算定额",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},50853,"在确定材料定额消耗量时，建筑工程必须消耗的材料不包括( )。",[98,100,102,104],{"key":20,"text":99,"correct":32},"不可避免的场外运输损耗材料",{"key":24,"text":101,"correct":22},"直接使用在工程上的材料",{"key":27,"text":103,"correct":22},"不可避免的施工废料",{"key":30,"text":105,"correct":22},"不可避免的场内运输损耗材料",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},50854,"铺贴水磨石板地面，其时间定额为O.143 工日／m2，那么产量定额是( )工日／m2。",[110,112,114,116],{"key":20,"text":111,"correct":32},"6．99",{"key":24,"text":113,"correct":22},"6．4",{"key":27,"text":115,"correct":22},"7．82",{"key":30,"text":117,"correct":22},"4．5",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},50856,"按生产要素内容分类，工程建设定额包括劳动定额、材料消耗定额和( )。",[122,124,126,128],{"key":20,"text":123,"correct":22},"人工定额",{"key":24,"text":125,"correct":32},"施工机械台班使用定额",{"key":27,"text":127,"correct":22},"措施项目费定额",{"key":30,"text":129,"correct":22},"间接费定额",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},50858,"预算定额的编制应遵循按( )水平确定的原则。",[134,136,138,140],{"key":20,"text":135,"correct":32},"平均",{"key":24,"text":137,"correct":22},"平均先进",{"key":27,"text":139,"correct":22},"先进",{"key":30,"text":141,"correct":22},"行业先进",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},50859,"已知水泥净用量是300m3，损耗率是3％，那么水泥的总耗量是( )m3。",[146,148,150,152],{"key":20,"text":147,"correct":22},"291",{"key":24,"text":149,"correct":32},"309",{"key":27,"text":151,"correct":22},"390",{"key":30,"text":153,"correct":22},"399",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},50861,"下列对预算定额的描述中，正确的是( )。",[158,160,162,164],{"key":20,"text":159,"correct":32},"预算定额是计价定额",{"key":24,"text":161,"correct":22},"预算定额是直接用于施工管理中的定额",{"key":27,"text":163,"correct":22},"预算定额是初步设计阶段编制的定额",{"key":30,"text":165,"correct":22},"预算定额是在概算定额的基础上综合而成的",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},50863,"一个抹灰小组12人，工作6小时(8小时工作制)，完成抹灰54m2，计算其产量定额为( )m2／工日。",[170,172,174,175],{"key":20,"text":171,"correct":22},"6．5",{"key":24,"text":173,"correct":32},"6",{"key":27,"text":117,"correct":22},{"key":30,"text":176,"correct":22},"3．9",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},50864,"建筑材料按在生产中的作用可分为主要材料、辅助材料和其他材料。在下列各项材料中，属于主要材料的是( )。",[181,183,185,187],{"key":20,"text":182,"correct":22},"石子",{"key":24,"text":184,"correct":22},"燃料",{"key":27,"text":186,"correct":32},"水泥",{"key":30,"text":188,"correct":22},"油料",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":30,"analysis":33},50866,"以下不属于周转性材料的是( )。",[193,195,197,199],{"key":20,"text":194,"correct":22},"模板",{"key":24,"text":196,"correct":22},"脚手架",{"key":27,"text":198,"correct":22},"跳板",{"key":30,"text":200,"correct":32},"零星材料",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},50868,"工程建设定额按照（ ）不同，可以分为劳动定额、材料消耗定额、施工机械台班使用定额。",[205,207,208,210],{"key":20,"text":206,"correct":22},"编制程序",{"key":24,"text":75,"correct":32},{"key":27,"text":209,"correct":22},"编制用途",{"key":30,"text":211,"correct":22},"投资费用性质",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},50869,"概算指标是在( )基础上编制的。",[216,218,220,221],{"key":20,"text":217,"correct":22},"费用定额",{"key":24,"text":219,"correct":32},"概算定额和预算定额",{"key":27,"text":93,"correct":22},{"key":30,"text":123,"correct":22},{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},50871,"设计工程项目只要基本符合概算指标所列各项条件和结构特征可直接使用( )编制概算。",[226,228,229,230],{"key":20,"text":227,"correct":32},"概算指标",{"key":24,"text":217,"correct":22},{"key":27,"text":93,"correct":22},{"key":30,"text":123,"correct":22},{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":24,"analysis":33},50873,"材料从工地仓库、现场集中堆放地点或现场加工地点至操作地点的水平和垂直运输，所需的费用( )。",[235,237,239,241],{"key":20,"text":236,"correct":22},"包括在二次搬运费中",{"key":24,"text":238,"correct":32},"包括在材料消耗定额",{"key":27,"text":240,"correct":22},"按实际发生金额计人工程造价",{"key":30,"text":242,"correct":22},"不能计入工程造价",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":20,"analysis":33},50874,"工程建设定额是指在正常的施工条件下，完成一定计量单位的合格产品所必须消耗的劳动力、材料、机械设备及资金的( )标准。",[247,249,251,253],{"key":20,"text":248,"correct":32},"数量",{"key":24,"text":250,"correct":22},"质量",{"key":27,"text":252,"correct":22},"价格",{"key":30,"text":254,"correct":22},"施工",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":24,"analysis":33},50876,"有一建筑队，有5个砖工，共干38天(8小时工作制)，共砌砖100m3，则其时间定额是( )",[259,261,263,265],{"key":20,"text":260,"correct":22},"2．5",{"key":24,"text":262,"correct":32},"1．9",{"key":27,"text":264,"correct":22},"0．08",{"key":30,"text":266,"correct":22},"0．05",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":20,"analysis":33},50878,"该起重机的机械时间利用系数为( )。",[271,273,275,277],{"key":20,"text":272,"correct":32},"0．812 5",{"key":24,"text":274,"correct":22},"0．852 5",{"key":27,"text":276,"correct":22},"0．862 5",{"key":30,"text":278,"correct":22},"0．872 5",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":27,"analysis":33},50880,"该起重机的产量定额为( )块／台班。",[283,285,287,289],{"key":20,"text":284,"correct":22},"80．645",{"key":24,"text":286,"correct":22},"82．645",{"key":27,"text":288,"correct":32},"86．645",{"key":30,"text":290,"correct":22},"88．645",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":20,"analysis":33},50881,"预算定额中人工消耗指标包括基本用工和( )。",[295,297,299,301],{"key":20,"text":296,"correct":32},"其他用工",{"key":24,"text":298,"correct":22},"有效用工",{"key":27,"text":300,"correct":22},"偶然用工",{"key":30,"text":302,"correct":22},"多余用工",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},50883,"砌筑墙体工程中，运输砖的用工量属于( )。",[307,309,311,312],{"key":20,"text":308,"correct":32},"基本用工",{"key":24,"text":310,"correct":22},"辅助用工",{"key":27,"text":296,"correct":22},{"key":30,"text":313,"correct":22},"人工幅度差用工",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},50884,"某热力管道工程，完成每米管道保温所需要的工作延续时间为5.77小时，除保温层作业外，每米管道工程安装、防腐、包装箱等作业的人工时间定额为4个工日。各项作业人工幅度差为10％。回答69-71题: 每米管道保温的人工时间定额为( )工日。",[318,320,322,324],{"key":20,"text":319,"correct":22},"O．62",{"key":24,"text":321,"correct":32},"O．72",{"key":27,"text":323,"correct":22},"O．82",{"key":30,"text":325,"correct":22},"O．92",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":27,"analysis":33},50886,"每米管道保温的产量定额为( )工日。",[330,332,334,336],{"key":20,"text":331,"correct":22},"1．19",{"key":24,"text":333,"correct":22},"1．29",{"key":27,"text":335,"correct":32},"1．39",{"key":30,"text":337,"correct":22},"1．49",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":30,"analysis":33},50889,"每米管道工程的定额人工消耗量为( )工日。",[342,344,346,348],{"key":20,"text":343,"correct":22},"4．29",{"key":24,"text":345,"correct":22},"4．59",{"key":27,"text":347,"correct":22},"4．95",{"key":30,"text":349,"correct":32},"5．19",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":27,"analysis":33},50891,"单层建筑物的建筑面积利用坡屋顶内空间时，净高超过( )米的部分应计算全面积。",[354,356,358,360],{"key":20,"text":355,"correct":22},"1．20",{"key":24,"text":357,"correct":22},"2．00",{"key":27,"text":359,"correct":32},"2．10",{"key":30,"text":361,"correct":22},"2．20",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":27,"analysis":33},50893,"定额时间中的有效工作时间不包括( )。",[366,368,370,371],{"key":20,"text":367,"correct":22},"基本工作时间",{"key":24,"text":369,"correct":22},"准备与结束工作时间",{"key":27,"text":65,"correct":32},{"key":30,"text":67,"correct":22},{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":20,"analysis":33},50896,"墙体工程中，运输砂浆的用工量属于（ ）用工。",[376,378,380,382],{"key":20,"text":377,"correct":32},"基本",{"key":24,"text":379,"correct":22},"人工幅度差",{"key":27,"text":381,"correct":22},"辅助",{"key":30,"text":383,"correct":22},"超运距",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":20,"analysis":33},50898,"下列工程中，应按建筑物自然层水平投影面积的1\u002F2计算的是（ ）。",[388,390,392,394],{"key":20,"text":389,"correct":32},"有永久顶盖的室外楼梯",{"key":24,"text":391,"correct":22},"层高在2.20米以上的半地下室",{"key":27,"text":393,"correct":22},"建筑物内的室内楼梯间",{"key":30,"text":395,"correct":22},"建筑物内的变形缝",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":20,"analysis":33},50900,"在编制施工定额时，施工定额水平的确定必须遵循( )原则。",[400,401,403,405],{"key":20,"text":137,"correct":32},{"key":24,"text":402,"correct":22},"施工定额",{"key":27,"text":404,"correct":22},"企业定额",{"key":30,"text":406,"correct":22},"建筑工程定额",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":24,"analysis":33},50903,"按( )分类，工程建设定额可分为施工定额、预算定额、概算定额、概算指标和投资估算指标。",[411,413,415,417],{"key":20,"text":412,"correct":22},"生产要素",{"key":24,"text":414,"correct":32},"编制的程序和用途",{"key":27,"text":416,"correct":22},"专业及费用性质",{"key":30,"text":418,"correct":22},"主编单位及执行范围",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":30,"analysis":33},50905,"有效工作时间不包括( )。",[423,424,425,426],{"key":20,"text":369,"correct":22},{"key":24,"text":367,"correct":22},{"key":27,"text":67,"correct":22},{"key":30,"text":427,"correct":32},"偶然工作时间",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},50908,"建筑物外有围护结构的落地橱窗、走廊的层高超过( )米时，应计算建筑全面积。",[432,434,436,438],{"key":20,"text":433,"correct":22},"2．1",{"key":24,"text":435,"correct":32},"2．2",{"key":27,"text":437,"correct":22},"3．2",{"key":30,"text":439,"correct":22},"3．3",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},50910,"编制机械台班消耗定额时，汽车装货和卸货时停车消耗的机械工作时间属于( )。",[444,445,447,449],{"key":20,"text":65,"correct":32},{"key":24,"text":446,"correct":22},"有效工作时间",{"key":27,"text":448,"correct":22},"不可避免的无负荷工作时间",{"key":30,"text":450,"correct":22},"多余工作时间",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":27,"analysis":33},50913,"缺乏编制定额的必要资料、数据时，制订定额一般采用的方法是( )。",[455,457,459,461],{"key":20,"text":456,"correct":22},"统计计算法",{"key":24,"text":458,"correct":22},"评估法",{"key":27,"text":460,"correct":32},"经验估计法",{"key":30,"text":462,"correct":22},"技术鉴定法",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":20,"analysis":33},50915,"某施工队在200个工日内完成了800m2的工程，但有400m2不符合质量要求。 根据以上资料，回答83-87题： 按现行制度规定，每个工日工作时间是指( )",[467,469,471,473],{"key":20,"text":468,"correct":32},"8小时",{"key":24,"text":470,"correct":22},"要求工作时间",{"key":27,"text":472,"correct":22},"实际工作时间",{"key":30,"text":474,"correct":22},"平均工作时间",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":24,"analysis":33},50917,"上述施工队的时间定额为( )工日／m2。",[479,481,483,485],{"key":20,"text":480,"correct":22},"0．25",{"key":24,"text":482,"correct":32},"0．5",{"key":27,"text":484,"correct":22},"2",{"key":30,"text":486,"correct":22},"4",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":27,"analysis":33},50920,"上述施工队的产量定额为( )m3／~fl。",[491,492,494,495],{"key":20,"text":480,"correct":22},{"key":24,"text":493,"correct":22},"0.5",{"key":27,"text":484,"correct":32},{"key":30,"text":486,"correct":22},{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":27,"analysis":33},50922,"时间定额与产量定额的关系为( )。",[500,502,504,506],{"key":20,"text":501,"correct":22},"相等",{"key":24,"text":503,"correct":22},"肯定不等",{"key":27,"text":505,"correct":32},"互为倒数",{"key":30,"text":507,"correct":22},"没有关系",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":30,"analysis":33},50924,"向班组签发施工任务书和限额领料单所适用的定额是( )。",[512,513,514,515],{"key":20,"text":93,"correct":22},{"key":24,"text":87,"correct":22},{"key":27,"text":227,"correct":22},{"key":30,"text":402,"correct":32},{"id":517,"libraryId":5,"type":518,"typeLabel":519,"stem":520,"options":521,"answer":533,"analysis":33},50926,2,"多选题","某分部工程可划分为 A、 B、C三个施工过程，分四段组织流水作业，各施工过程在各个流水段上的流水节拍如下表所示（单位：周）。 关于该分部工程流水施工的说法，正确的有（ ）。",[522,524,526,528,530],{"key":20,"text":523,"correct":32},"A．该分部工程宜组织分别流水施工",{"key":24,"text":525,"correct":22},"B． A、 B、C施工过程之间的流水步距为K A，B＝3周、K B，C＝5周",{"key":27,"text":527,"correct":32},"C． A、C施工过程之间的流水步距为KB＝4周、KC＝7周",{"key":30,"text":529,"correct":22},"该分部工程的流水施工工期为22周",{"key":531,"text":532,"correct":32},"E","该分部工程的流水施工工期为25周","ACE",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":30,"analysis":33},50927,"施工劳动定额中未包括的，而在一般正常施工情况下又不可避免的一些零星用工称为( )。",[538,539,541,543],{"key":20,"text":308,"correct":22},{"key":24,"text":540,"correct":22},"超运距用工",{"key":27,"text":542,"correct":22},"辅助用",{"key":30,"text":313,"correct":32},{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},50929,"单层建筑物的建筑面积计算规定是( )。",[548,550,552,554],{"key":20,"text":549,"correct":32},"按建筑物外墙勒脚以上的外围水平面积计算",{"key":24,"text":551,"correct":22},"按建筑物外墙勒脚以下的外围水平面积计算",{"key":27,"text":553,"correct":22},"按建筑物外墙勒脚内包水平面积计算",{"key":30,"text":555,"correct":22},"按建筑物外墙中心线内包水平面积计算",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":20,"analysis":33},50931,"工程建设定额是指在正常的施工条件下，完成一定计量单位的合格产品所必须消耗的劳动力、材料、机械设备及资金的（ ）标准。",[560,561,563,565],{"key":20,"text":248,"correct":32},{"key":24,"text":562,"correct":22},"产量",{"key":27,"text":564,"correct":22},"工时",{"key":30,"text":566,"correct":22},"综合",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},50934,"室内楼梯间、电梯井、提物井、垃圾道、管道井等均按建筑物的( )计算面积。",[571,573,575,577],{"key":20,"text":572,"correct":32},"自然层",{"key":24,"text":574,"correct":22},"投影面积的一半",{"key":27,"text":576,"correct":22},"投影面积",{"key":30,"text":578,"correct":22},"上口水平面积",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},50936,"工人在工作班内消耗的工作时间，按其消耗的性质，可以分为两大类，即必须消耗的时间和( )。",[583,585,587,588],{"key":20,"text":584,"correct":22},"多余时间",{"key":24,"text":586,"correct":32},"损失时间",{"key":27,"text":63,"correct":22},{"key":30,"text":69,"correct":22},{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":30,"analysis":33},50939,"扩大结构定额是指( )。",[593,594,595,596],{"key":20,"text":87,"correct":22},{"key":24,"text":227,"correct":22},{"key":27,"text":402,"correct":22},{"key":30,"text":93,"correct":32},[598,601,604,607,610,612],{"id":599,"name":600,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":602,"name":603,"category":7,"favorite":8},30,"经济师",{"id":605,"name":606,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":608,"name":609,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":611,"category":7,"favorite":8},"(初级)保险专业",{"id":613,"name":614,"category":7,"favorite":8},51,"(初级)财政税收"]