[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,13,50,2220,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,212,221,233,245,257,269,281,293,305,317,329,341,353,365,374,386,398,410,422,434,446,458,470,482,494,506,515,527,539,549,561,572,584,596],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},50765,1,"单选题","以下所列项目，不属于分部工程的是( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","通风管道",false,{"key":24,"text":25,"correct":22},"B","土石方工程",{"key":27,"text":28,"correct":29},"C","土建工程",true,{"key":31,"text":32,"correct":22},"D","给排水管道","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},50766,"电气管线、给排水管道、设备安装和装修工程的报修年限为（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"1年",{"key":24,"text":41,"correct":29},"2年",{"key":27,"text":43,"correct":22},"3年",{"key":31,"text":45,"correct":22},"4年",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},50768,"检验批施工质量验收的组织者为( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"施工单位项目经理",{"key":24,"text":53,"correct":22},"施工单位项目质量员",{"key":27,"text":55,"correct":22},"总监理工程师",{"key":31,"text":57,"correct":29},"监理工程师",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},50769,"施工过程中工序质量监控的对象是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"工序能力指数",{"key":24,"text":65,"correct":22},"工程审图质量",{"key":27,"text":67,"correct":22},"工程监理活动",{"key":31,"text":69,"correct":29},"质量影响因素",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},50771,"建设工程竣工验收合格后，建设单位应将有关资料报建设行政主管部门或者其他管理部门（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":29},"备案",{"key":24,"text":77,"correct":22},"核验",{"key":27,"text":79,"correct":22},"确认",{"key":31,"text":81,"correct":22},"复查",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},50772,"工程质量中所包含的工作质量是指工程建设参与各方为保证质量所从事的技术、组织工作的水平和( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"能力",{"key":24,"text":89,"correct":22},"效果",{"key":27,"text":91,"correct":22},"实施程度",{"key":31,"text":93,"correct":29},"完善程度",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},50774,"工程质量不仅包括工程实物质量，而且也包含( )。",[98,100,102,104],{"key":20,"text":99,"correct":29},"工作质量",{"key":24,"text":101,"correct":22},"管理质量",{"key":27,"text":103,"correct":22},"控制程度",{"key":31,"text":105,"correct":22},"监督检查",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},50776,"影响工程质量的因素不包括( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"人的因素",{"key":24,"text":113,"correct":29},"时间的因素",{"key":27,"text":115,"correct":22},"材料的因素",{"key":31,"text":117,"correct":22},"环境的因素",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},50777,"对建设规模、投资方案有较大影响的设计变更，须经( )同意。",[122,124,126,128],{"key":20,"text":123,"correct":29},"原批准初步设计单位",{"key":24,"text":125,"correct":22},"原施工图审查单位",{"key":27,"text":127,"correct":22},"原工程招标机构",{"key":31,"text":129,"correct":22},"原合同备案机构",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},50779,"下列工作中，属于施工过程工序质量监控重点的是( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"制定工艺规程",{"key":24,"text":137,"correct":22},"进行成品保护",{"key":27,"text":139,"correct":22},"组织材料和构配件的实验",{"key":31,"text":141,"correct":29},"遵守工艺规程",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},50780,"总承包单位对其依法分包的建设工程质量承担( )。",[146,148,150,152],{"key":20,"text":147,"correct":22},"主要责任",{"key":24,"text":149,"correct":22},"次要责任",{"key":27,"text":151,"correct":22},"总包责任",{"key":31,"text":153,"correct":29},"连带责任",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},50782,"对于没有造成人员伤亡和重大直接经济损失，但是已经造成了恶劣社会影响的质量问题的处理原则是( )。",[158,160,162,164],{"key":20,"text":159,"correct":22},"认定为重大质量事故",{"key":24,"text":161,"correct":22},"认定为较大质量事故",{"key":27,"text":163,"correct":22},"不构成质量事故",{"key":31,"text":165,"correct":29},"视同质量事故",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},50783,"某住宅工程由甲建筑工程公司总承包施工，已于2012年1月竣工交付用户使用，该住宅工程设计使用年限为50年。2012年12月304室住户因自行装修不当造成卫生间地坪渗漏，2013年5月又发现5层钢筋混凝土梁保护层剥落，受力钢筋外露，物业公司向总承包报修。 回答55-59题: 按照我国现行法规的规定，5层钢筋混凝土梁的保修期限由( )。",[170,172,174,176],{"key":20,"text":171,"correct":29},"设计文件规定",{"key":24,"text":173,"correct":22},"承发包双方约定",{"key":27,"text":175,"correct":22},"发包方规定",{"key":31,"text":177,"correct":22},"承包合同约定",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},50785,"钢筋混凝土梁的保修期限为( )年。",[182,184,186,188],{"key":20,"text":183,"correct":22},"6",{"key":24,"text":185,"correct":22},"10",{"key":27,"text":187,"correct":29},"50",{"key":31,"text":189,"correct":22},"70",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},50786,"某动迁房住宅小区工程的设计文件规定，房屋合理使用年限为50年。住宅小区工程于2010年1月竣工验收合格后交付分配使用。2011年6月，住宅小区物业公司书面通知施工单位，要求对以下四个质量问题进行维修：1住户装修擅自改变承重结构，造成原有砼梁底出现裂缝；2原有外墙和屋面渗水；3原有房顶粉刷出现细小裂缝；4原有给水管道爆裂。 回答61-64题: 对报修的质量问题，施工单位应（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"负责组织维修",{"key":24,"text":197,"correct":22},"只对保修期内的工程部位组织维修",{"key":27,"text":199,"correct":29},"分清责任后组织维修",{"key":31,"text":201,"correct":22},"只对施工不良的工程部位组织维修",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},50788,"砼梁的保修期限为（ ）年。",[206,208,210,211],{"key":20,"text":207,"correct":22},"2",{"key":24,"text":209,"correct":22},"5",{"key":27,"text":187,"correct":29},{"key":31,"text":189,"correct":22},{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},50789,"原有房顶粉刷的报修期限为（ ）年。",[216,218,219,220],{"key":20,"text":217,"correct":22},"1",{"key":24,"text":207,"correct":29},{"key":27,"text":209,"correct":22},{"key":31,"text":187,"correct":22},{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":31,"analysis":33},50791,"建筑工程施工质量验收时，应对涉及结构安全和使用功能的重要分部工程进行( )。",[225,227,229,231],{"key":20,"text":226,"correct":22},"全面检测",{"key":24,"text":228,"correct":22},"重点检测",{"key":27,"text":230,"correct":22},"全数检测",{"key":31,"text":232,"correct":29},"抽样检测",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":31,"analysis":33},50793,"工程质量是对建设工程( )的要求。",[237,239,241,243],{"key":20,"text":238,"correct":22},"结构安全",{"key":24,"text":240,"correct":22},"使用功能",{"key":27,"text":242,"correct":22},"节能效果",{"key":31,"text":244,"correct":29},"综合特性",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":31,"analysis":33},50794,"工程设计单位可以指定( )的建筑材料供应商。",[249,251,253,255],{"key":20,"text":250,"correct":22},"工程结构部位",{"key":24,"text":252,"correct":22},"工程重要部位",{"key":27,"text":254,"correct":22},"有环保要求",{"key":31,"text":256,"correct":29},"有特殊要求",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":27,"analysis":33},50796,"施工组织设计是指导施工准备和施工全过程的( )。",[261,263,265,267],{"key":20,"text":262,"correct":22},"工艺技术文件",{"key":24,"text":264,"correct":22},"项目管理计划",{"key":27,"text":266,"correct":29},"技术经济文件",{"key":31,"text":268,"correct":22},"质量管理计划",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":20,"analysis":33},50797,"对涉及结构安全的试块、试件及有关材料进行现场取样时监督见证的单位是( )。",[273,275,277,279],{"key":20,"text":274,"correct":29},"建设单位或工程监理单位",{"key":24,"text":276,"correct":22},"设计单位或工程施工单位",{"key":27,"text":278,"correct":22},"工程监理单位或设计单位",{"key":31,"text":280,"correct":22},"质量监督机构或检测机构",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":27,"analysis":33},50799,"下列关于总承包单位与分包单位所承担的建设工程质量责任的说法中，正确的是( )。",[285,287,289,291],{"key":20,"text":286,"correct":22},"总承包单位对其工程质量承担主要责任",{"key":24,"text":288,"correct":22},"总承包单位对其工程质量不承担责任",{"key":27,"text":290,"correct":29},"分包单位对其分包工程质量向总承包单位负责",{"key":31,"text":292,"correct":22},"分包单位对其分包工程质量向建设单位负责",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},50800,"304室住户对卫生间地坪渗漏问题提出修理要求，甲建筑工程公司( )。",[297,299,301,303],{"key":20,"text":298,"correct":22},"应进行修理",{"key":24,"text":300,"correct":29},"可不予受理",{"key":27,"text":302,"correct":22},"可在分清责任后决定是否进行修理",{"key":31,"text":304,"correct":22},"应让住户自行找卫生间地坪工程分包单位修理",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":27,"analysis":33},50802,"某施工队在200个工日内完成了800立方米的工程，但有400立方米不符合质量要求。根据所学知识，回答1-5题。 按现行制度规定，每个工日工作时间是指_______。",[309,311,313,315],{"key":20,"text":310,"correct":22},"实际工作时间",{"key":24,"text":312,"correct":22},"要求工作时间",{"key":27,"text":314,"correct":29},"8小时",{"key":31,"text":316,"correct":22},"平均工作时间",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},50803,"在工程建设中，某些材料直接构成工程实体，其用量和价值可以具体测量，但占工程材料总量比重较小。这种材料称为（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":22},"主要材料",{"key":24,"text":324,"correct":29},"辅助材料",{"key":27,"text":326,"correct":22},"周转性材料",{"key":31,"text":328,"correct":22},"零星材料",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":31,"analysis":33},50805,"确定施工定额水平应遵循（ ）原则。",[333,335,337,339],{"key":20,"text":334,"correct":22},"简明适用",{"key":24,"text":336,"correct":22},"科学严谨",{"key":27,"text":338,"correct":22},"高于先进",{"key":31,"text":340,"correct":29},"平均先进",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":31,"analysis":33},50806,"确定分项工程单价的基础是（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"施工定额",{"key":24,"text":348,"correct":22},"概算定额",{"key":27,"text":350,"correct":22},"概算指标",{"key":31,"text":352,"correct":29},"预算定额",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":27,"analysis":33},50808,"概算是在( )阶段编制的全部建设费用的文件。",[357,359,361,363],{"key":20,"text":358,"correct":22},"技术设计",{"key":24,"text":360,"correct":22},"扩大初步设计",{"key":27,"text":362,"correct":29},"初步设计",{"key":31,"text":364,"correct":22},"施工图设计",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":20,"analysis":33},50810,"编制概算定额的基础是（ ）。",[369,370,371,372],{"key":20,"text":352,"correct":29},{"key":24,"text":346,"correct":22},{"key":27,"text":350,"correct":22},{"key":31,"text":373,"correct":22},"工程量清单",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":27,"analysis":33},50811,"上述施工队的产量定额为_______。",[378,380,382,384],{"key":20,"text":379,"correct":22},"0.25立方米\u002F工日",{"key":24,"text":381,"correct":22},"0.5立方米\u002F工日",{"key":27,"text":383,"correct":29},"2立方米\u002F工日",{"key":31,"text":385,"correct":22},"4立方米\u002F工日",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":27,"analysis":33},50813,"时间定额与产量定额的关系为_______。",[390,392,394,396],{"key":20,"text":391,"correct":22},"相等",{"key":24,"text":393,"correct":22},"肯定不等",{"key":27,"text":395,"correct":29},"互为倒数",{"key":31,"text":397,"correct":22},"没有关系",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":20,"analysis":33},50814,"预算定额人工消耗量中的超运距，指的是( )。",[402,404,406,408],{"key":20,"text":403,"correct":29},"预算定额规定运距-劳动定额规定运距",{"key":24,"text":405,"correct":22},"劳动定额规定运距+场外规定运距",{"key":27,"text":407,"correct":22},"预算定额规定运距+劳动定额规定运距",{"key":31,"text":409,"correct":22},"劳动定额规定运距-场外规定运距",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":24,"analysis":33},50816,"劳动定期中的时间定额以( )为单位。",[414,416,418,420],{"key":20,"text":415,"correct":22},"台时",{"key":24,"text":417,"correct":29},"工日",{"key":27,"text":419,"correct":22},"台班",{"key":31,"text":421,"correct":22},"每工产量",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":27,"analysis":33},50817,"施工定额的编制对象是（ ）。",[426,428,430,432],{"key":20,"text":427,"correct":22},"分部分项工程",{"key":24,"text":429,"correct":22},"扩大的分部分项工程",{"key":27,"text":431,"correct":29},"工序",{"key":31,"text":433,"correct":22},"单位工程",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":27,"analysis":33},50819,"措施费定额属于（ ）定额。",[438,440,442,444],{"key":20,"text":439,"correct":22},"建筑工程",{"key":24,"text":441,"correct":22},"设备安装工程",{"key":27,"text":443,"correct":29},"建筑安装工程费用",{"key":31,"text":445,"correct":22},"工程建设其他费用",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":27,"analysis":33},50820,"某桥梁工程桥墩基础施工要进行夜间混凝土连续浇捣，为确保施工质量，特安排三名监理工程师实施全过程现场跟班监督。这种监理形式是( )。",[450,452,454,456],{"key":20,"text":451,"correct":22},"现场监理",{"key":24,"text":453,"correct":22},"巡视监理",{"key":27,"text":455,"correct":29},"旁站监理",{"key":31,"text":457,"correct":22},"平行监理",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},50822,"以下不是工程建设定额特点的是( )。",[462,464,466,468],{"key":20,"text":463,"correct":22},"科学性",{"key":24,"text":465,"correct":29},"实用性",{"key":27,"text":467,"correct":22},"稳定性",{"key":31,"text":469,"correct":22},"系统性",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},50823,"建筑安装工程费用定额包括( )。",[474,476,478,480],{"key":20,"text":475,"correct":29},"间接费定额",{"key":24,"text":477,"correct":22},"工具定额",{"key":27,"text":479,"correct":22},"器具定额",{"key":31,"text":481,"correct":22},"材料消耗定额",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":27,"analysis":33},50825,"砌筑墙体工程的调制砂浆用工量属于( )用工。",[486,488,490,492],{"key":20,"text":487,"correct":22},"超运距",{"key":24,"text":489,"correct":22},"人工幅度差",{"key":27,"text":491,"correct":29},"基本",{"key":31,"text":493,"correct":22},"辅助",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":31,"analysis":33},50827,"施工劳动定额中未包括的、而在一般正常施工情况下又不可避免的一些零星用工称为( )。",[498,500,502,504],{"key":20,"text":499,"correct":22},"基本用工",{"key":24,"text":501,"correct":22},"超运距用工",{"key":27,"text":503,"correct":22},"辅助用工",{"key":31,"text":505,"correct":29},"人工幅度差用工",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":24,"analysis":33},50828,"概算定额是在( )的基础上综合而成的。",[510,511,512,513],{"key":20,"text":346,"correct":22},{"key":24,"text":352,"correct":29},{"key":27,"text":350,"correct":22},{"key":31,"text":514,"correct":22},"投资估算指标",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":31,"analysis":33},50831,"某施工队伍共有抹灰工8人铺贴水磨石地面，16天(平均每天工作8小时)完成3 200 m2的地面。假设当地人工工日工资标准为50元／工日。 根据以上资料，回答25-28题： 每工产量为( )m2／工日。",[519,521,523,525],{"key":20,"text":520,"correct":22},"22",{"key":24,"text":522,"correct":22},"23",{"key":27,"text":524,"correct":22},"24",{"key":31,"text":526,"correct":29},"25",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":20,"analysis":33},50833,"时间定额为( )工日／m2。",[531,533,535,537],{"key":20,"text":532,"correct":29},"0．04",{"key":24,"text":534,"correct":22},"0．14",{"key":27,"text":536,"correct":22},"0．24",{"key":31,"text":538,"correct":22},"0．34",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},50834,"每lm2水磨石地面铺贴工程的人工费为( )元。",[543,544,545,547],{"key":20,"text":217,"correct":22},{"key":24,"text":207,"correct":29},{"key":27,"text":546,"correct":22},"3",{"key":31,"text":548,"correct":22},"4",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":27,"analysis":33},50836,"施工单位进行工程回访的形式分为( )。",[553,555,557,559],{"key":20,"text":554,"correct":22},"经常性回访和专题性回访",{"key":24,"text":556,"correct":22},"定期回访和不定期回访",{"key":27,"text":558,"correct":29},"季节性回访. 技术性回访和保修期满前回访",{"key":31,"text":560,"correct":22},"分包单位回访. 主承包单位回访和总承包单位回访",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":27,"analysis":33},50837,"工程建设的定额按编制单位和适用范围不同可分为国家定额、行业定额、地区定额和( )。",[565,567,568,570],{"key":20,"text":566,"correct":22},"施工人员的安全管理",{"key":24,"text":346,"correct":22},{"key":27,"text":569,"correct":29},"企业定额",{"key":31,"text":571,"correct":22},"建筑工程定额",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":20,"analysis":33},50839,"砌筑1m3的240mm厚砖墙，标准砖和砂浆的损耗率均为2%。标准砖的尺寸为240×115×53mm，灰缝10mm。根据以上资料，回答31-34题。 标准砖净用量为（ ）块。",[576,578,580,582],{"key":20,"text":577,"correct":29},"529.1",{"key":24,"text":579,"correct":22},"539.1",{"key":27,"text":581,"correct":22},"549.1",{"key":31,"text":583,"correct":22},"559.1",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":24,"analysis":33},50840,"标准砖总消耗量为（ ）块。",[588,590,592,594],{"key":20,"text":589,"correct":22},"518.7",{"key":24,"text":591,"correct":29},"539.7",{"key":27,"text":593,"correct":22},"548.1",{"key":31,"text":595,"correct":22},"570.2",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":27,"analysis":33},50842,"砂浆净用量为（ ）m3。",[600,602,604,606],{"key":20,"text":601,"correct":22},"0.206",{"key":24,"text":603,"correct":22},"0.2215",{"key":27,"text":605,"correct":29},"0.226",{"key":31,"text":607,"correct":22},"0.246",[609,612,615,618,621,623],{"id":610,"name":611,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":613,"name":614,"category":7,"favorite":8},30,"经济师",{"id":616,"name":617,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":619,"name":620,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":622,"category":7,"favorite":8},"(初级)保险专业",{"id":624,"name":625,"category":7,"favorite":8},51,"(初级)财政税收"]