[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":590},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,12,50,2220,[13,34,46,58,66,78,88,100,112,124,136,148,160,172,184,195,207,218,230,242,254,266,278,290,298,308,319,331,341,353,363,372,384,393,404,416,428,438,450,462,474,486,498,510,522,534,546,558,568,580],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},50687,1,"单选题","制定工程项目成本改进措施要( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","面面俱到",false,{"key":24,"text":25,"correct":22},"B","全面铺开",{"key":27,"text":28,"correct":29},"C","抓住主要矛盾",true,{"key":31,"text":32,"correct":22},"D","抓住所有矛盾","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},50688,"某工程项目的主体工程由绑扎钢筋、安装模板和浇筑混凝土三个施工过程组成，其平面上设有两伸缩缝(伸缩缝将该建筑平面划分为3等份)。各施工过程在各个施工段上的流水节拍依次为6天、6天、3天，组织成倍节拍流水施工。 回答41-44题 下列有关该工程流水步距的说法中，正确的为( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"流水步距是指某专业工作对进入一个施工段流水作业的持续时间",{"key":24,"text":41,"correct":22},"流水步距是指两个相邻专业工作队进入同一施工段开始工作的最小时间间隔",{"key":27,"text":43,"correct":22},"流水步距是指两个相邻专业工作队进入同一施工段流水作业的搭接时间",{"key":31,"text":45,"correct":29},"该工程的流水步距应取绑扎钢筋. 安装模板. 浇筑混凝土三个施工过程流水节拍的最大公约数",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},50690,"该工程的流水施工段数应划分为( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"3",{"key":24,"text":53,"correct":22},"4",{"key":27,"text":55,"correct":29},"5",{"key":31,"text":57,"correct":22},"6",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},50691,"该工程的专业工作班组应为( )。",[62,63,64,65],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":29},{"key":31,"text":57,"correct":22},{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":24,"analysis":33},50693,"该工程的流水施工工期为( )天。",[70,72,74,76],{"key":20,"text":71,"correct":22},"15",{"key":24,"text":73,"correct":29},"27",{"key":27,"text":75,"correct":22},"30",{"key":31,"text":77,"correct":22},"36",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":27,"analysis":33},50694,"某分部工程可划分为甲、乙、丙三个施工过程，其流水节拍分别为6周、12周和9周，若组织成倍节拍流水施工，其流水步距是( )周。",[82,84,86,87],{"key":20,"text":83,"correct":22},"1",{"key":24,"text":85,"correct":22},"2",{"key":27,"text":51,"correct":29},{"key":31,"text":57,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":31,"analysis":33},50696,"下列各选项中，( )不是成倍节拍流水施工的基本特点。",[92,94,96,98],{"key":20,"text":93,"correct":22},"同一施工过程在各个流水段上的流水节拍均相等",{"key":24,"text":95,"correct":22},"所有施工过程之间的流水步距都相等",{"key":27,"text":97,"correct":22},"各专业工作队能连续施工，施工段上没有空闲",{"key":31,"text":99,"correct":29},"专业工作队数等于施工过程数",{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":31,"analysis":33},50698,"采用横道图编制工程进度计划的不足是( )。",[104,106,108,110],{"key":20,"text":105,"correct":22},"编制较为复杂. 繁琐",{"key":24,"text":107,"correct":22},"由于人们不太熟悉，所以在进度管理中不常用",{"key":27,"text":109,"correct":22},"计算劳动力和资源消耗量较为困难",{"key":31,"text":111,"correct":29},"不能反映工作之间相互联系. 相互制约的关系",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":27,"analysis":33},50699,"工程进度计划的检查包括以下工作：①实际进度与计划进度的比较；②收集实际进度数据：③进度数据整理、统计和分析；④建立进度数据采集系统；⑤进度计划的调整；⑥进度偏差判定。各项工作之间的正确顺序是( )。",[116,118,120,122],{"key":20,"text":117,"correct":22},"①一②一③一④一⑤一⑥",{"key":24,"text":119,"correct":22},"②一③一④一①一⑤一⑥",{"key":27,"text":121,"correct":29},"④一②一③一①一⑥一⑤",{"key":31,"text":123,"correct":22},"③一②一①一④一⑥一⑤",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":27,"analysis":33},50701,"下列参数中，属于流水施工空间参数的是( )。",[128,130,132,134],{"key":20,"text":129,"correct":22},"流水强度",{"key":24,"text":131,"correct":22},"技术间歇",{"key":27,"text":133,"correct":29},"流水段数",{"key":31,"text":135,"correct":22},"施工过程数",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":27,"analysis":33},50702,"工程项目进度计划检查工作的主要内容包括：1实际进度与计划进度的比较；2收集实际进度数据；3数据整理、统计、分析；4建立进度数据采集系统；5进度计划的调整。其正确的开展顺序是（ ）。",[140,142,144,146],{"key":20,"text":141,"correct":22},"1-3-4-2-5",{"key":24,"text":143,"correct":22},"4-3-2-1-5",{"key":27,"text":145,"correct":29},"4-2-3-1-5",{"key":31,"text":147,"correct":22},"2-4-3-1-5",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":27,"analysis":33},50704,"采用横道图编制工程项目进度计划的优点是( )。",[152,154,156,158],{"key":20,"text":153,"correct":22},"可以清楚反映各项工作之间的相互关系",{"key":24,"text":155,"correct":22},"可以确定影响进度目标的关键工作",{"key":27,"text":157,"correct":29},"形象直观. 编制简单. 使用方便",{"key":31,"text":159,"correct":22},"能进行各种时间参数的计算",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":27,"analysis":33},50705,"某基础工程可划分为基坑开挖、混凝土垫层、砌基础、回填土四个施工过程。在施工中分三个施工段组织流水作业，各个施工过程在各流水段上的流水节拍如下表所示： 回答53-56题: 该基础工程适合采用的流水施工方式为( )。",[164,166,168,170],{"key":20,"text":165,"correct":22},"全等节拍流水施工",{"key":24,"text":167,"correct":22},"成倍节拍流水施工",{"key":27,"text":169,"correct":29},"分别流水施工",{"key":31,"text":171,"correct":22},"固定节拍流水施工",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":27,"analysis":33},50707,"工程项目施工可以采用不同的组织方式，其中有利于资源均衡使用的组织方式是（ ）。",[176,178,180,182],{"key":20,"text":177,"correct":22},"依次施工",{"key":24,"text":179,"correct":22},"平行施工",{"key":27,"text":181,"correct":29},"流水施工",{"key":31,"text":183,"correct":22},"搭接施工",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":24,"analysis":33},50708,"横道图是最常用的工程进度计划表示方法，其主要特点是（ ）。",[188,190,191,193],{"key":20,"text":189,"correct":22},"能清楚地表达工作直接相互联系和相互制约的关系",{"key":24,"text":157,"correct":29},{"key":27,"text":192,"correct":22},"易于找出影响工程进度的关键工作和关键线路",{"key":31,"text":194,"correct":22},"能计算各种时间参数",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":27,"analysis":33},50710,"某分部工程划分为甲、乙、丙三个施工过程，各施工过程的流水节拍分别为6周、8周和4周。若分为6个流水施工段组织成倍节拍流水施工，则其专业工作队总数和流水施工工期分别为（ ）。",[199,201,203,205],{"key":20,"text":200,"correct":22},"3队和18周",{"key":24,"text":202,"correct":22},"6队和24周",{"key":27,"text":204,"correct":29},"9队和28周",{"key":31,"text":206,"correct":22},"9队和34周",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":31,"analysis":33},50712,"某工程项目划分为 A、 B、C三个施工过程，各施工过程的流水节拍均为5天。若施工时分为四个施工段组织流水作业，且 B、C施工过程之间有3天技术间歇时间，则其流水施工工期为（ ）天。",[211,213,215,216],{"key":20,"text":212,"correct":22},"18",{"key":24,"text":214,"correct":22},"23",{"key":27,"text":75,"correct":22},{"key":31,"text":217,"correct":29},"33",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":24,"analysis":33},50713,"编制工程项目进度计划的工作包括：①确定进度目标；②确定工作持续时间；③划分工作过程；④编制初始进度计划；⑤检查是否满足要求；⑥计算各工作工程量；⑦进度计划调整、优化；⑧编制正式进度计划，上述各工作正确的步骤是( )。",[222,224,226,228],{"key":20,"text":223,"correct":22},"①一②一③一④一⑤一⑥一⑦一⑧",{"key":24,"text":225,"correct":29},"①一③一⑥一②一④一⑤一⑦一⑧",{"key":27,"text":227,"correct":22},"①一⑥一②一③一④一⑤一⑦一⑧",{"key":31,"text":229,"correct":22},"①一③一②一⑥一④一⑤一⑦一⑧",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":24,"analysis":33},50715,"流水施工中的流水节拍是指( )。",[234,236,238,240],{"key":20,"text":235,"correct":22},"某一个专业工作队的作业时间",{"key":24,"text":237,"correct":29},"某一个专业工作队在一个施工段上完成一个施工过程的持续时间",{"key":27,"text":239,"correct":22},"所有专业工作队在一个施工段上完成一个施工过程的持续时间",{"key":31,"text":241,"correct":22},"所有专业工作队的作业时间",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":27,"analysis":33},50716,"全等节拍和成倍节拍流水施工组织的第一项工作是( )。",[246,248,250,252],{"key":20,"text":247,"correct":22},"确定施工起点流向，划分施工段",{"key":24,"text":249,"correct":22},"确定流水步距",{"key":27,"text":251,"correct":29},"分解施工过程，确定施工顺序",{"key":31,"text":253,"correct":22},"确定各施工过程的流水节拍数值",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":27,"analysis":33},50718,"流水施工中的工艺参数是指参与流水施工的( )数目。",[258,260,262,264],{"key":20,"text":259,"correct":22},"施工",{"key":24,"text":261,"correct":22},"施工层",{"key":27,"text":263,"correct":29},"施工过程",{"key":31,"text":265,"correct":22},"工作队",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":24,"analysis":33},50719,"某分部工程可划分为甲、乙、丙三个施工过程，其流水节拍分别为6周、12周和9周，若组织成倍节拍流水施工，其流水步距和专业工作队总数应为( )。",[270,272,274,276],{"key":20,"text":271,"correct":22},"3周和3个",{"key":24,"text":273,"correct":29},"3周和9个",{"key":27,"text":275,"correct":22},"6周和3个",{"key":31,"text":277,"correct":22},"6周和9个",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":20,"analysis":33},50721,"在进行现场实地检查时，进度管理者应确定( )。",[282,284,286,288],{"key":20,"text":283,"correct":29},"检查的时间间隔",{"key":24,"text":285,"correct":22},"检查的规模",{"key":27,"text":287,"correct":22},"检查的过程",{"key":31,"text":289,"correct":22},"检查的时间",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":27,"analysis":33},50723,"组织一项成倍节拍流水施工，各施工过程的流水节拍分别为t1=2天，t2=4天，t3=6天，则第2个施工过程的专业工作队数为( )队。",[294,295,296,297],{"key":20,"text":83,"correct":22},{"key":24,"text":51,"correct":22},{"key":27,"text":85,"correct":29},{"key":31,"text":53,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},50724,"流水施工的工艺参数是指参与流水施工的（ ）。",[302,304,305,307],{"key":20,"text":303,"correct":22},"施工段数",{"key":24,"text":135,"correct":29},{"key":27,"text":306,"correct":22},"搭接间距",{"key":31,"text":131,"correct":22},{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},50726,"某工程项目的基础工程可以分解为甲、乙、丙、丁四个施工过程，各施工过程的流水节拍均为3周，分4个施工段组织流水作业，则其流水施工工期是( )周。",[312,313,315,317],{"key":20,"text":71,"correct":22},{"key":24,"text":314,"correct":22},"17",{"key":27,"text":316,"correct":22},"19",{"key":31,"text":318,"correct":29},"21",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":27,"analysis":33},50727,"某工程项目基础工程和主体工程均可分为三段组织流水作业，其流水节拍分别为3周、3周、4周和2周、3周、3周，则该两分部工程之间的流水步距及其流水施工工期分别是( )。",[323,325,327,329],{"key":20,"text":324,"correct":22},"3周和11周",{"key":24,"text":326,"correct":22},"3周和18周",{"key":27,"text":328,"correct":29},"5周和13周",{"key":31,"text":330,"correct":22},"5周和15周",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},50729,"某专业工作队在一个施工段上完成一个施工过程的持续时间称为( )。",[335,337,339,340],{"key":20,"text":336,"correct":22},"流水步距",{"key":24,"text":338,"correct":29},"流水节拍",{"key":27,"text":131,"correct":22},{"key":31,"text":306,"correct":22},{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},50730,"与网络图相比，横道图编制工程进度计划的优点是( )。",[345,347,349,351],{"key":20,"text":346,"correct":22},"能清楚地表达工作之间相互联系. 相互制约的关系",{"key":24,"text":348,"correct":29},"形象直观. 简单明了",{"key":27,"text":350,"correct":22},"可进行资源优化",{"key":31,"text":352,"correct":22},"可进行各种时间参数的计算，确定进度计划的关键线路",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":24,"analysis":33},50732,"组织流水施工可以节省工作时间，其所用的手段是( )。",[357,359,360,361],{"key":20,"text":358,"correct":22},"连续施工",{"key":24,"text":183,"correct":29},{"key":27,"text":177,"correct":22},{"key":31,"text":362,"correct":22},"动态施工",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":24,"analysis":33},50734,"最普遍的流水施工组织形式为( )。",[367,368,369,370],{"key":20,"text":165,"correct":22},{"key":24,"text":169,"correct":29},{"key":27,"text":167,"correct":22},{"key":31,"text":371,"correct":22},"特定节拍流水施工",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":24,"analysis":33},50735,"流水施工中的流水步距是指( )。",[376,378,380,382],{"key":20,"text":377,"correct":22},"某专业队进入各个施工段流水作业的持续时间",{"key":24,"text":379,"correct":29},"两个相邻专业队进入同一个施工段开始工作的最小时间间隔",{"key":27,"text":381,"correct":22},"两个相邻专业队进入施工现场流水作业的时间间歇",{"key":31,"text":383,"correct":22},"两个相邻专业队进入同一个施工段流水作业的搭接时间",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":27,"analysis":33},50737,"在流水施工中，当每个施工过程在各个施工段上的流水节拍不尽相等，可以组织( )。",[388,389,391,392],{"key":20,"text":165,"correct":22},{"key":24,"text":390,"correct":22},"异步距流水施工",{"key":27,"text":169,"correct":29},{"key":31,"text":167,"correct":22},{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":24,"analysis":33},50738,"某基础工程包括开挖、支模、浇筑混凝土及回填四个施工过程，分3个施工段组织流水施工，流水节拍见下表，则该基础工程的流水施工工期为（）天。",[397,399,400,402],{"key":20,"text":398,"correct":22},"22",{"key":24,"text":214,"correct":29},{"key":27,"text":401,"correct":22},"24",{"key":31,"text":403,"correct":22},"25",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":31,"analysis":33},50740,"在组织成倍节拍流水施工过程中，流水步距等于( )。",[408,410,412,414],{"key":20,"text":409,"correct":22},"各施工过程流水节拍的最大值",{"key":24,"text":411,"correct":22},"各施工过程流水节拍的最小值",{"key":27,"text":413,"correct":22},"各施工过程流水节拍的最小公倍数",{"key":31,"text":415,"correct":29},"各施工过程流水节拍的最大公约数",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},50741,"某工程项目分解为基础工程、主体工程、层面工程、装饰工程四个施工过程，划分为四个施工段组织流水作业，每一施工过程由一个专业工作队负责施工。各施工过程在各个施工段上的流水节拍如下表所示。 该工程项目各相邻施工过程之间的流水步距分别为( )个月。",[420,422,424,426],{"key":20,"text":421,"correct":29},"3. 6. 3",{"key":24,"text":423,"correct":22},"3. 5. 4",{"key":27,"text":425,"correct":22},"4. 5. 3",{"key":31,"text":427,"correct":22},"4. 6. 5",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":27,"analysis":33},50743,"某工程项目分解为基础工程、主体工程、层面工程、装饰工程四个施工过程，划分为四个施工段组织流水作业，每一施工过程由一个专业工作队负责施工。各施工过程在各个施工段上的流水节拍如下表所示。 根据以上资料，回答下列问题： 该工程项目的流水施工工期为( )个月。",[432,433,434,436],{"key":20,"text":398,"correct":22},{"key":24,"text":401,"correct":22},{"key":27,"text":435,"correct":29},"26",{"key":31,"text":437,"correct":22},"28",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":31,"analysis":33},50745,"对于没有造成人员伤亡和重大直接经济损失，但是已经造成了恶劣社会影响的质量问题的处理原则是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"认定为重大质量事故",{"key":24,"text":445,"correct":22},"认定为较大质量事故",{"key":27,"text":447,"correct":22},"不构成质量事故",{"key":31,"text":449,"correct":29},"视同质量事故",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":27,"analysis":33},50746,"下列不属于回访方式的是（）。",[454,456,458,460],{"key":20,"text":455,"correct":22},"季节性回访",{"key":24,"text":457,"correct":22},"技术性回访",{"key":27,"text":459,"correct":29},"保修期满后回访",{"key":31,"text":461,"correct":22},"保修期满前回访",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":31,"analysis":33},50748,"施工过程中工序质量检验的目的是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"实施工序过程质量监控",{"key":24,"text":469,"correct":22},"判定工序作业方法是否合理",{"key":27,"text":471,"correct":22},"收集工序质量动态信息",{"key":31,"text":473,"correct":29},"决定是否可进行下道工序施工",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":27,"analysis":33},50749,"施工过程工序质量监控的对象是该工序的( )。",[478,480,482,484],{"key":20,"text":479,"correct":22},"实物质量",{"key":24,"text":481,"correct":22},"质保体系",{"key":27,"text":483,"correct":29},"影响因素",{"key":31,"text":485,"correct":22},"质量记录",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":31,"analysis":33},50751,"2012年4月，某大学为建设学生公寓楼，与某建筑公司签订了一份建筑工程合同。合同约定：工程采用固定总价合同形式，主体工程和内外承重砖一律采用国家标准砌块，每层加钢筋混凝土圈梁；大学可预付工程款(合同价款的10％)；工程费用于验收合格后一次付清；交付使用后，如果在6个月内发生严重质量问题，由承包人负责修复等。一年后，学生公寓楼如期完成，在大学和建筑公司共同进行竣工验收时，大学发现工程3-5层的内承重墙墙体裂缝较多，要求建筑公司修复后再验收，建筑公司认为不影响使用而拒绝修复。因为很多新生急于入住，大学接收了公寓楼。在使用了8个月后，公寓楼的5层内承重墙倒塌，致1人死亡，3人受伤，其中1人致残。受害者与大学要求建筑公司赔偿损失，并修复倒塌的工程，建筑公司以使用不当且已过保修期为由拒绝赔偿。 回答17-21题; 对合同中学生公寓楼“交付使用，如果在6个月内分生严重质量问题，由承包人负责修复”的约定，下列判断正确的是( )。",[490,492,494,496],{"key":20,"text":491,"correct":22},"此约定合理。符合国家关于保修期的规定",{"key":24,"text":493,"correct":22},"此约定不合理。按国家规定，主体结构工程保修期为5年",{"key":27,"text":495,"correct":22},"此约定不合理。按国家规定，主体结构工程保修期为2年",{"key":31,"text":497,"correct":29},"此约定不合理。按国家规定，主体结构工程保修期为设计文件规定的该工程的合理使用年限",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":20,"analysis":33},50752,"房屋建筑的单位工程质量验收的组织者是( )。",[502,504,506,508],{"key":20,"text":503,"correct":29},"建设单位",{"key":24,"text":505,"correct":22},"工程监理单位",{"key":27,"text":507,"correct":22},"施工单位",{"key":31,"text":509,"correct":22},"质量监督机构",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":20,"analysis":33},50754,"以下所列项目，属于单位工程的是( )。",[514,516,518,520],{"key":20,"text":515,"correct":29},"土建工程",{"key":24,"text":517,"correct":22},"混凝土及钢筋混凝土工程",{"key":27,"text":519,"correct":22},"给排水管道工程",{"key":31,"text":521,"correct":22},"通风管道工程",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":27,"analysis":33},50755,"对依法分包的专业工程质量，总承包单位应承担（ ）责任。",[526,528,530,532],{"key":20,"text":527,"correct":22},"次要",{"key":24,"text":529,"correct":22},"相关",{"key":27,"text":531,"correct":29},"连带",{"key":31,"text":533,"correct":22},"主要",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":27,"analysis":33},50757,"某住宅设计文件规定其合理使用年限为50年，工程于2006年1月竣工验收交付使用。2008年6月，物业公司要求施工单位对如下问题进行维修： (1)住户装修中改变承重结构，造成原有混凝土梁底出现裂缝； (2)外墙和屋面渗水； (3)房顶粉刷出现细小裂缝； (4)原有给排水管道爆裂。 根据以上资料，回答25-28题： 对以上报修问题，施工单位应( )。",[538,540,542,544],{"key":20,"text":539,"correct":22},"立即组织维修",{"key":24,"text":541,"correct":22},"对保修期限内的工程组织维修",{"key":27,"text":543,"correct":29},"在分清责任后组织维修",{"key":31,"text":545,"correct":22},"对施工不良的工程组织维修",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":24,"analysis":33},50759,"下列不属于施工单位的质量责任和义务是( )。",[550,552,554,556],{"key":20,"text":551,"correct":22},"对建设工程的施工质量负责",{"key":24,"text":553,"correct":29},"总承包单位不应对其承担的建设工程的质量承担连带责任",{"key":27,"text":555,"correct":22},"不得偷工减料",{"key":31,"text":557,"correct":22},"职工必须经教育培训合格后才能上岗",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},50760,"为防渗水，外墙和屋面的保修期限为( )年。",[562,563,564,566],{"key":20,"text":85,"correct":22},{"key":24,"text":55,"correct":29},{"key":27,"text":565,"correct":22},"50",{"key":31,"text":567,"correct":22},"70",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":31,"analysis":33},50762,"建设单位拨付工程款应经( )。",[572,574,576,578],{"key":20,"text":573,"correct":22},"监理人员签字",{"key":24,"text":575,"correct":22},"监理工程师同意",{"key":27,"text":577,"correct":22},"监理单位签字",{"key":31,"text":579,"correct":29},"总监理工程师签字",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":27,"analysis":33},50763,"事故报告出现新情况，以及事故发生之日起（）日内伤亡人数发生变化的，应当及时补报。",[584,586,587,588],{"key":20,"text":585,"correct":22},"7",{"key":24,"text":71,"correct":22},{"key":27,"text":75,"correct":29},{"key":31,"text":589,"correct":22},"45",[591,594,597,600,603,605],{"id":592,"name":593,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":595,"name":596,"category":7,"favorite":8},30,"经济师",{"id":598,"name":599,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":601,"name":602,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":604,"category":7,"favorite":8},"(初级)保险专业",{"id":606,"name":607,"category":7,"favorite":8},51,"(初级)财政税收"]