[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-53-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":621},{"id":5,"name":6,"category":7,"favorite":8},53,"(初级)建筑与房地产经济","经济金融",0,11,50,2220,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,573,585,597,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},50609,1,"单选题","工程项目管理信息系统的应用必须具备（ ）等方面的条件。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","组织件. 硬件. 软件. 管理件",false,{"key":24,"text":25,"correct":22},"B","合同件. 硬件. 软件. 控制件",{"key":27,"text":28,"correct":22},"C","领导件. 硬件. 软件. 协调件",{"key":30,"text":31,"correct":32},"D","组织件. 硬件. 软件. 教育件",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},50611,"下列各项工作中，属于施工阶段施工方项目管理工作的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"编制施工成本计划，设定目标成本",{"key":24,"text":41,"correct":22},"组织并完成施工现场的“三通一平”工作",{"key":27,"text":43,"correct":22},"落实项目施工阶段的总体部署，进行施工总进度目标论证",{"key":30,"text":45,"correct":22},"建立独立平行的监测体系，对工程质量的全过程进行独立平行监测",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},50613,"下列总承包模式中，属于总承包单位按照合同约定，承担工程项目的设计、采购、施工、试运行服务等工作，并对承包工程的质量、安全、工期、造价全面负责的模式是( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"施工总承包",{"key":24,"text":53,"correct":22},"设计一施工总承包",{"key":27,"text":55,"correct":32},"EPC总承包",{"key":30,"text":57,"correct":22},"施工总承包管理",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},50614,"制定项目信息管理制度需有项目管理信息编码、信息卡和信息处理表，以及 ( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"项目管理组织结构图",{"key":24,"text":65,"correct":22},"项目管理工作流程",{"key":27,"text":67,"correct":32},"项目管理信息结构图",{"key":30,"text":69,"correct":22},"项目管理任务分工",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},50616,"下列各项工作中，属于施工阶段业主方项目管理工作的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"组织施工难点. 重点项目的施工方案专题研究",{"key":24,"text":77,"correct":22},"编制施工组织设计",{"key":27,"text":79,"correct":22},"组织原材料. 构配件的现场检查",{"key":30,"text":81,"correct":22},"制定现场安全和文明施工措施",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},50617,"项目管理门户指的是( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"建设项目全寿命周期各阶段信息的传递软件",{"key":24,"text":89,"correct":22},"基于网络的项目采购管理软件",{"key":27,"text":91,"correct":22},"虚拟组织的设定和调整软件",{"key":30,"text":93,"correct":32},"在网络基础上对项目信息进行集中存储和管理的系统运行软件",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},50619,"关于工程项目特点的说法，正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"工程项目的安全. 质量. 进度和费用目标可以随时调整",{"key":24,"text":101,"correct":22},"工程项目具有重复性",{"key":27,"text":103,"correct":22},"工程项目具有多次性",{"key":30,"text":105,"correct":32},"工程项目具有明确的建设任务",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},50620,"建设工程总承包的主要意义在于( )，以达到为项目建设增值的目的。",[110,112,114,116],{"key":20,"text":111,"correct":22},"通过总价包干，控制建设投资",{"key":24,"text":113,"correct":22},"通过“交钥匙”，提高效率和效益，确保工期和质量",{"key":27,"text":115,"correct":32},"通过设计与施工过程的组织集成，促进设计与施工的紧密结合",{"key":30,"text":117,"correct":22},"总承包单位统一对承包工程的质量. 安全. 工期. 造价全面负责",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},50622,"建设工程项目生产过程的总组织者是( )。",[122,124,126,128],{"key":20,"text":123,"correct":32},"工程业主方",{"key":24,"text":125,"correct":22},"工程总承包方",{"key":27,"text":127,"correct":22},"工程设计方",{"key":30,"text":129,"correct":22},"工程施工方",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},50624,"在我国的建设程序中，项目的设计、施工，直至项目交付使用称为( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"项目动用(使用)阶段",{"key":24,"text":137,"correct":22},"项目全寿命周期",{"key":27,"text":139,"correct":32},"项目实施阶段",{"key":30,"text":141,"correct":22},"项目决策阶段",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":30,"analysis":33},50625,"认定建设项目属于同一个工程项目范围的标准是( )。",[146,148,150,152],{"key":20,"text":147,"correct":22},"取得一份建设工程规划许可证",{"key":24,"text":149,"correct":22},"取得一份项目可行性研究批复",{"key":27,"text":151,"correct":22},"具有一个承包合同",{"key":30,"text":153,"correct":32},"具有一个总体设计或初步设计",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},50627,"网络平台为项目管理工作提供的基本功能是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":32},"文档管理",{"key":24,"text":161,"correct":22},"进度管理",{"key":27,"text":163,"correct":22},"质量控制",{"key":30,"text":165,"correct":22},"成本控制",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":30,"analysis":33},50628,"下列组织工具图表中，用于反映组成工程项目所有工作任务的是( )。",[170,172,174,176],{"key":20,"text":171,"correct":22},"组织结构图",{"key":24,"text":173,"correct":22},"工作流程图",{"key":27,"text":175,"correct":22},"管理职能分工表",{"key":30,"text":177,"correct":32},"项目结构图",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},50630,"工作流程图反映了一个组织系统中各项工作之间的逻辑关系，工作流程图中菱形框表示( )。",[182,184,186,188],{"key":20,"text":183,"correct":22},"工作",{"key":24,"text":185,"correct":32},"判别条件",{"key":27,"text":187,"correct":22},"逻辑关系",{"key":30,"text":189,"correct":22},"工作的执行者",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},50631,"建设单位办理工程质量监督手续是在( )。",[194,196,198,200],{"key":20,"text":195,"correct":32},"领取施工许可证或开工报告前",{"key":24,"text":197,"correct":22},"领取施工许可证或开工报告后",{"key":27,"text":199,"correct":22},"领取规划许可证前",{"key":30,"text":201,"correct":22},"勘察设计开始前",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},50633,"项目决策阶段管理工作的主要任务是( )。",[206,208,210,212],{"key":20,"text":207,"correct":32},"确定项目的定义",{"key":24,"text":209,"correct":22},"设计前准备工作",{"key":27,"text":211,"correct":22},"机会研究",{"key":30,"text":213,"correct":22},"项目策划",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":30,"analysis":33},50634,"( )是项目建设的最后一个程序。",[218,220,222,224],{"key":20,"text":219,"correct":22},"建设项目质量控制",{"key":24,"text":221,"correct":22},"可行性研究",{"key":27,"text":223,"correct":22},"投资效益评价",{"key":30,"text":225,"correct":32},"建设项目竣工验收",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},50636,"申请建筑施工许可证报送资料包括( )。",[230,232,234,236],{"key":20,"text":231,"correct":32},"质量. 安全监督手续",{"key":24,"text":233,"correct":22},"复验灰线报告",{"key":27,"text":235,"correct":22},"工程档案认可文件",{"key":30,"text":237,"correct":22},"开工报告",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},50637,"一个工程项目必须在一个( )范围内，由一个或若干个互有内在联系的单项工程所组成。",[242,244,246,248],{"key":20,"text":243,"correct":22},"项目建议书批复",{"key":24,"text":245,"correct":22},"项目可行性研究批复",{"key":27,"text":247,"correct":32},"总体设计或初步设计",{"key":30,"text":249,"correct":22},"承包合同",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},50639,"工程项目管理中所表述的“自项目开始至项目完成”指的是项目的（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"决策阶段",{"key":24,"text":257,"correct":32},"实施阶段",{"key":27,"text":259,"correct":22},"使用阶段",{"key":30,"text":261,"correct":22},"全寿命周期",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":30,"analysis":33},50640,"工程项目信息管理制度可以用( )规定。",[266,268,270,272],{"key":20,"text":267,"correct":22},"信息流程图. 信息编码. 信息卡和信息申请表",{"key":24,"text":269,"correct":22},"信息结构图. 信息类别. 信息卡和信息处理表",{"key":27,"text":271,"correct":22},"信息流程图. 信息类别. 信息卡和信息申请表",{"key":30,"text":273,"correct":32},"信息结构图. 信息编码. 信息卡和信息处理表",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},50642,"在房屋建筑工程施工阶段监理中，监理人员对关键部位、关键工序的施工质量实施全过程现场跟班的监督活动，称为( )。",[278,280,282,284],{"key":20,"text":279,"correct":22},"跟踪检测",{"key":24,"text":281,"correct":22},"巡视",{"key":27,"text":283,"correct":32},"旁站监理",{"key":30,"text":285,"correct":22},"平行检验",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":30,"analysis":33},50643,"某施工单位在某高校新校区的施工中，为更好地规划和控制该工程的进度和质量目标，建立了一套信息系统，该信息系统属于( )系统。",[290,292,294,296],{"key":20,"text":291,"correct":22},"计算机辅助施工",{"key":24,"text":293,"correct":22},"施工质量管理信息",{"key":27,"text":295,"correct":22},"施工项目信息门户",{"key":30,"text":297,"correct":32},"项目管理信息",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},50645,"施工联合体承包某项工程，如联合体中一家公司倒闭，则联合体其他成员( )。",[302,304,306,308],{"key":20,"text":303,"correct":32},"必须承担其经济责任",{"key":24,"text":305,"correct":22},"不承担其经济责任",{"key":27,"text":307,"correct":22},"视联合体内部约定决定是否承担其经济责任",{"key":30,"text":309,"correct":22},"按照与业主签订的承包合同决定是否承担其经济责任",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":30,"analysis":33},50647,"城市规划管理部门根据城市规划，在已确定的土地使用功能范围内，对建设项目用地选址定点提出具体意见的文件是( )。",[314,316,318,320],{"key":20,"text":315,"correct":22},"建设用地批准书",{"key":24,"text":317,"correct":22},"建设项目选址核准证",{"key":27,"text":319,"correct":22},"建设用地规划许可",{"key":30,"text":321,"correct":32},"建设项目选址意见书",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":27,"analysis":33},50648,"下列关于建筑施工企业项目经理的表述中，正确的是( )。",[326,328,330,332],{"key":20,"text":327,"correct":22},"项目经理是一种专业人士的名称",{"key":24,"text":329,"correct":22},"在全面实施建造师执业资格制度后，将不再实行项目经理责任制",{"key":27,"text":331,"correct":32},"项目经理是一个工作岗位的名称",{"key":30,"text":333,"correct":22},"取得建造师执业资格的人员在企业中应担任项目经理",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},50650,"施工项目具有的特征不包括( )。",[338,340,342,344],{"key":20,"text":339,"correct":32},"任务的多次性",{"key":24,"text":341,"correct":22},"费用目标的明确性",{"key":27,"text":343,"correct":22},"任务的一次性",{"key":30,"text":345,"correct":22},"管理对象的整体性",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},50651,"可行性研究是在( )经批准后进行的。",[350,352,354,356],{"key":20,"text":351,"correct":22},"初步设计",{"key":24,"text":353,"correct":22},"投资方案",{"key":27,"text":355,"correct":32},"项目建议书",{"key":30,"text":357,"correct":22},"项目开工报告",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":30,"analysis":33},50653,"下列选项中，属于项目管理网络平台系统软件的组织设定的是( )。",[362,364,366,368],{"key":20,"text":363,"correct":22},"基本组织结构模式设定",{"key":24,"text":365,"correct":22},"项目结构设定",{"key":27,"text":367,"correct":22},"合同结构设定",{"key":30,"text":369,"correct":32},"用户权限设定",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":27,"analysis":33},50654,"单位工程质量验收合格后,( )应在规定时间内将工程竣工验收报告和有关文件,报建设行政管理部门备案。",[374,376,378,380],{"key":20,"text":375,"correct":22},"工程质量监督单位",{"key":24,"text":377,"correct":22},"施工单位",{"key":27,"text":379,"correct":32},"建设单位",{"key":30,"text":381,"correct":22},"设计单位",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":27,"analysis":33},50656,"流水作业法是一种组织科学施工的计划方法，其实质是( )。",[386,388,390,392],{"key":20,"text":387,"correct":22},"依次作业",{"key":24,"text":389,"correct":22},"平行作业",{"key":27,"text":391,"correct":32},"连续作业",{"key":30,"text":393,"correct":22},"控制作业",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":30,"analysis":33},50657,"某4人专业工作队完成一工作量为100的施工段，当每一工日完成的计划产量为5时，其流水节拍为( )。",[398,400,402,404],{"key":20,"text":399,"correct":22},"25",{"key":24,"text":401,"correct":22},"20",{"key":27,"text":403,"correct":22},"10",{"key":30,"text":405,"correct":32},"5",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},50659,"下列各项措施中，属于工程进度管理的合同措施的是( )。",[410,412,414,416],{"key":20,"text":411,"correct":32},"推行CM承发包模式",{"key":24,"text":413,"correct":22},"建立工期超前或延误的奖惩制度",{"key":27,"text":415,"correct":22},"及时办理工程进度款支付手续",{"key":30,"text":417,"correct":22},"建立进度信息收集和报告制度",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},50660,"某现浇钢筋混凝土工程，由绑扎钢筋、安装模板和浇混凝土三个施工过程组成，其对应流水节拍分别为6周、12周和9周。若组织成倍节拍流水施工，其流水步距和专业工作队总数分别应为( )。",[422,424,426,428],{"key":20,"text":423,"correct":22},"3周和3个",{"key":24,"text":425,"correct":22},"6周和3个",{"key":27,"text":427,"correct":32},"3周和9个",{"key":30,"text":429,"correct":22},"6周和9个",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},50662,"某工程组织流水施工，如果其施工过程之间存在技术间歇和平行搭接时间，则对工期的影响是( )。",[434,436,438,440],{"key":20,"text":435,"correct":32},"间歇时间会使流水施工工期延长，而搭接时间会使流水施工工期缩短",{"key":24,"text":437,"correct":22},"间歇时间会使流水施工工期缩短，而搭接时间会使流水施工工期延长",{"key":27,"text":439,"correct":22},"无论是间歇时间还是搭接时间，均会使流水施工工期延长",{"key":30,"text":441,"correct":22},"无论是间歇时间还是搭接时间，均会使流水施工工期缩短",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":30,"analysis":33},50664,"某分部工程有两个施工过程，其流水节拍分别为3、4、3、3天和2、5、4、3天，若该分部工程分为4个施工段组织流水作业，则其流水步距和流水施工工期分别为( )天。",[446,448,450,452],{"key":20,"text":447,"correct":22},"3和16",{"key":24,"text":449,"correct":22},"3和17",{"key":27,"text":451,"correct":22},"5和18",{"key":30,"text":453,"correct":32},"5和19",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":30,"analysis":33},50665,"关于工程进度管理的说法，正确的是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"工程进度管理的目的是使工程总成本最低",{"key":24,"text":461,"correct":22},"工程进度管理的目的是使工程建设周期最短",{"key":27,"text":463,"correct":22},"通过进度管理可使工程项目的各项目标均达到最优",{"key":30,"text":465,"correct":32},"工程进度管理的目的是确保项目工期目标的实现",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},50667,"流水作业方法是建立在( )基础上的。",[470,472,474,476],{"key":20,"text":471,"correct":22},"单独生产",{"key":24,"text":473,"correct":32},"分工协作",{"key":27,"text":475,"correct":22},"手工操作",{"key":30,"text":477,"correct":22},"小批量生产",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},50668,"为确保建设工程进度控制目标的实现，必须认真制定进度管理的有关措施。下列各项进度管理措施中，属于技术措施的是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"编制进度计划和进度控制的工作流程",{"key":24,"text":485,"correct":22},"对应急赶工给予相应的赶工费用补偿",{"key":27,"text":487,"correct":32},"选择对实现进度目标有利的设计方案",{"key":30,"text":489,"correct":22},"推行CM承发包模式，并协调合同工期与进度计划之间的关系",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},50670,"下列各选项中，( )不是依次施工组织方式的特点。",[494,496,498,500],{"key":20,"text":495,"correct":32},"施工现场组织管理比较复杂",{"key":24,"text":497,"correct":22},"单位时间内投入的资源量较少",{"key":27,"text":499,"correct":22},"没有充分利用工作面，工期拖得较长",{"key":30,"text":501,"correct":22},"各专业工作队的工人和专业工人出现间歇，不能连续生产作业",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},50671,"建设工程项目的生产过程通常可以采用不同的施工组织方式，其中有利于资源供应的组织方式是( )。",[506,508,510,512],{"key":20,"text":507,"correct":32},"依次施工和流水施工",{"key":24,"text":509,"correct":22},"平行施工和流水施工",{"key":27,"text":511,"correct":22},"依次施工和平行施工",{"key":30,"text":513,"correct":22},"平行施工和搭接施工",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":27,"analysis":33},50673,"某工程项目的装饰工程可以分解为 A、 B、 C、D四个施工过程，施工中分五个施工段组织流水作业，各施工过程的流水节拍均为3天，其中 C、D工作之间有2天技术间歇时间，则其流水施工工期为( )天。",[518,520,522,524],{"key":20,"text":519,"correct":22},"22",{"key":24,"text":521,"correct":22},"24",{"key":27,"text":523,"correct":32},"26",{"key":30,"text":525,"correct":22},"28",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":27,"analysis":33},50674,"某分部工程可划分为 A、 B、C三个施工过程，其流水节拍分别为8天、12天和4天。若组织成倍节拍流水施工，其流水步距和专业工作队总数应分别是( )。",[530,532,534,536],{"key":20,"text":531,"correct":22},"2天和3个",{"key":24,"text":533,"correct":22},"4天和3个",{"key":27,"text":535,"correct":32},"4天和6个",{"key":30,"text":537,"correct":22},"2天和12个",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},50676,"下列有关分别流水施工的说法中，正确的是( )。",[542,544,546,548],{"key":20,"text":543,"correct":22},"组织分别流水施工时各个施工段上均无空闲",{"key":24,"text":545,"correct":32},"确定各施工过程相邻两个专业工作队之间的流水步距是组织分别流水施工的关键步骤",{"key":27,"text":547,"correct":22},"相邻施工过程之间的流水步距为常数",{"key":30,"text":549,"correct":22},"流水节拍较长的施工过程需要组织多个专业队伍",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":30,"analysis":33},50678,"工程项目前期工作计划的编制是在( )进行的。",[554,556,558,560],{"key":20,"text":555,"correct":22},"项目的初步设计被批准后",{"key":24,"text":557,"correct":22},"编制项目设计任务书的同时",{"key":27,"text":559,"correct":22},"项目的可行性研究被批准后",{"key":30,"text":561,"correct":32},"项目预测的基础上",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":27,"analysis":33},50679,"下列有关工程进度管理说法，正确的是( )。",[566,568,570,572],{"key":20,"text":567,"correct":22},"进行工程进度管理的目的是使工程建设周期最短",{"key":24,"text":569,"correct":22},"通过工程进度管理可使工程总投资最省",{"key":27,"text":571,"correct":32},"工程进度管理的目的是确保工程进度总目标的实现",{"key":30,"text":463,"correct":22},{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":24,"analysis":33},50681,"工程进度管理的主要环节是工程进度计划的( )。",[577,579,581,583],{"key":20,"text":578,"correct":22},"编制和优化",{"key":24,"text":580,"correct":32},"编制和实施控制",{"key":27,"text":582,"correct":22},"实施和检查",{"key":30,"text":584,"correct":22},"检查和纠偏",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":24,"analysis":33},50682,"某工程项目基础工程和主体工程均可分为四段组织流水作业，其流水节拍分别为3、4、3、2周和4、2、4、3周，则两分部工程之间的流水步距及其流水施工工期为( )。",[589,591,593,595],{"key":20,"text":590,"correct":22},"4周和13周",{"key":24,"text":592,"correct":32},"4周和17周",{"key":27,"text":594,"correct":22},"3周和16周",{"key":30,"text":596,"correct":22},"3周和25周",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":27,"analysis":33},50684,"收集工程实际进度的有关数据、资料，经加工整理后与计划进度进行比较，提供进度比较分析报告，这是进度管理措施中的( )。",[601,603,605,607],{"key":20,"text":602,"correct":22},"组织措施",{"key":24,"text":604,"correct":22},"技术措施",{"key":27,"text":606,"correct":32},"信息管理措施",{"key":30,"text":608,"correct":22},"经济措施",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":27,"analysis":33},50685,"在流水施工中，某一个专业工作队在一个施工段上完成一个施工过程的持续时间被称为( )。",[613,615,617,619],{"key":20,"text":614,"correct":22},"流水步距",{"key":24,"text":616,"correct":22},"技术间歇",{"key":27,"text":618,"correct":32},"流水节拍",{"key":30,"text":620,"correct":22},"平行搭接",[622,625,628,631,634,636],{"id":623,"name":624,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":626,"name":627,"category":7,"favorite":8},30,"经济师",{"id":629,"name":630,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":632,"name":633,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":635,"category":7,"favorite":8},"(初级)保险专业",{"id":637,"name":638,"category":7,"favorite":8},51,"(初级)财政税收"]