[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-52519":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},52519,53,2,"多选题","施工过程质量管理的措施主要有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","技术交底",true,{"key":16,"text":17,"correct":14},"B","测量控制",{"key":19,"text":20,"correct":14},"C","关键部位和关键工序质量控制",{"key":22,"text":23,"correct":24},"D","材料质量控制",false,{"key":26,"text":27,"correct":24},"E","施工机械设备质量控制","ABC","施工过程质量管理主要包括：①技术交底；②测量控制；③计量控制；④工序施工质量控制；⑤关键部位和关键工序质量控制；⑥成品保护。DE两项属于施工准备阶段质量管理的内容。",{"id":6,"name":31,"category":32,"favorite":33},"(初级)建筑与房地产经济","经济金融",0]