[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-52375":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},52375,53,2,"多选题","下列房地产项目管理工作中，属于工程建设进度、成本与质量管理主要任务的有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","组织管理",true,{"key":16,"text":17,"correct":18},"B","销售管理",false,{"key":20,"text":21,"correct":14},"C","合同管理",{"key":23,"text":24,"correct":14},"D","费用管理",{"key":26,"text":27,"correct":18},"E","物业管理","ACD","(一)工程建设进度、成本与质量管理的主要任务(1)组织管理(2)费用管理(3)进度管理(4)质量管理(5)合同管理",{"id":6,"name":31,"category":32,"favorite":33},"(初级)建筑与房地产经济","经济金融",0]