[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-52288":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},52288,53,2,"多选题","主体与装饰工程人工费超支的主要原因为( )的变化。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","主体工程用工数超支",true,{"key":16,"text":17,"correct":18},"B","主体工程人工费日单价超支",false,{"key":20,"text":21,"correct":18},"C","装饰工程用工数超支",{"key":23,"text":24,"correct":14},"D","装饰工程人工费日单价超支","AD","考核人工费超支的原因。@##",{"id":6,"name":28,"category":29,"favorite":30},"(初级)建筑与房地产经济","经济金融",0]