[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-52262":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},52262,53,2,"多选题","施工定额由( )相对独立的部分组成。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","劳动定额",true,{"key":16,"text":17,"correct":14},"B","机械定额",{"key":19,"text":20,"correct":21},"C","取费定额",false,{"key":23,"text":24,"correct":21},"D","工器具定额",{"key":26,"text":27,"correct":14},"E","材料定额","ABE","施工定额包括劳动定额、材料消耗定额和施工机械台班使用定额。",{"id":6,"name":31,"category":32,"favorite":33},"(初级)建筑与房地产经济","经济金融",0]