[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-52254":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},52254,53,2,"多选题","定额按生产要素分类，可分为( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","预算定额",false,{"key":16,"text":17,"correct":14},"B","施工定额",{"key":19,"text":20,"correct":21},"C","材料消耗定额",true,{"key":23,"text":24,"correct":21},"D","劳动消耗定额",{"key":26,"text":27,"correct":21},"E","机械台班消耗定额","CDE","考察工程建设定额的分类。",{"id":6,"name":31,"category":32,"favorite":33},"(初级)建筑与房地产经济","经济金融",0]