[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-52236":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},52236,53,2,"多选题","对工程进行施工技术组织措施设计主要包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工程序. 施工顺序",false,{"key":16,"text":17,"correct":18},"B","保证质量. 安全生产",true,{"key":20,"text":21,"correct":18},"C","季节性施工",{"key":23,"text":24,"correct":14},"D","进度保证及现场管理",{"key":26,"text":27,"correct":18},"E","防止环境污染","BCE","施工组织设计中，对质量控制起主要作用的是施工方案，主要包括施工程序的安排、流水段的划分、主要项目的施工方法、施工机械的选择，以及保证质量、安全施工、冬季和雨季施工、污染防止等方面的预控方法和针对性的技术组织措施。",{"id":6,"name":31,"category":32,"favorite":33},"(初级)建筑与房地产经济","经济金融",0]