[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-52130":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},52130,53,2,"多选题","在进行工程成本核算时，需要正确划分的成本费用的界限有()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","工程成本与期间费用的界限",true,{"key":16,"text":17,"correct":14},"B","各个成本核算对象应负担的成本的界限",{"key":19,"text":20,"correct":14},"C","已完工程和未完工程的成本的界限",{"key":22,"text":23,"correct":14},"D","本期工程和不属于本期工程的成本的界限",{"key":25,"text":26,"correct":27},"E","变动成本和固定成本的界限",false,"ABCD","正确划分各种成本费用的界限主要是要划清以下四个界限：①工程项目施工成本和期间费用的界限；②各个成本核算对象应负担的成本界限；③本期工程成本和不属本期工程成本的界限；④已完工程成本和未完工程成本的界限，防止人为调节成本。",{"id":6,"name":31,"category":32,"favorite":33},"(初级)建筑与房地产经济","经济金融",0]