[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-52125":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},52125,53,2,"多选题","工程成本管理的基础工作主要指()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","技术节约措施",false,{"key":16,"text":17,"correct":18},"B","定额管理",true,{"key":20,"text":21,"correct":14},"C","压缩成本支出",{"key":23,"text":24,"correct":18},"D","材料物资的计量、验收和保管",{"key":26,"text":27,"correct":18},"E","各项原始记录","BDE","企业应组织各职能部门，在企业领导、总会计师和技术主管领导下，认真做好以下各项基础工作：完善定额管理、材料物资计量验收保管、建立和健全各项原始记录。",{"id":6,"name":31,"category":32,"favorite":33},"(初级)建筑与房地产经济","经济金融",0]