[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-52123":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},52123,53,2,"多选题","影响工程成本的因素有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工程量",true,{"key":16,"text":17,"correct":18},"B","物资预算定额含量",false,{"key":20,"text":21,"correct":18},"C","活劳动预算定额含量",{"key":23,"text":24,"correct":14},"D","完成单位工程量的物资和活劳动消耗数量",{"key":26,"text":27,"correct":14},"E","物资和活劳动的单价","ADE","工程成本的影响因素(1)工程量。(2)完成单位工程量的物资和活劳动消耗数量。(3)物资和活劳动的单价。",{"id":6,"name":31,"category":32,"favorite":33},"(初级)建筑与房地产经济","经济金融",0]