[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-52091":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},52091,53,2,"多选题","劳动定额的表现形式有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","概算指标",false,{"key":16,"text":17,"correct":18},"B","时间定额",true,{"key":20,"text":21,"correct":18},"C","产量定额",{"key":23,"text":24,"correct":14},"D","预算定额",{"key":26,"text":27,"correct":14},"E","概算定额","BC","劳动定额的表现形式有时间定额、产量定额。",{"id":6,"name":31,"category":32,"favorite":33},"(初级)建筑与房地产经济","经济金融",0]