[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-52005":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},52005,53,2,"多选题","某市要新建一个体育馆，向全社会公开招标。一家擅长大跨度钢结构施工和吊装的施工单位，与一家擅长体育馆设计的设计单位组成联合体投标，并最后中标。关于该项目的说法，正确的有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","该项目采用的施工平行发包模式",false,{"key":16,"text":17,"correct":18},"B","该项目采用的是建设项目工程总承包模式",true,{"key":20,"text":21,"correct":14},"C","设计单位应按合同的约定对项目设计的进度、质量等向施工单位负责",{"key":23,"text":24,"correct":18},"D","施工单位可以将该项目的幕墙工程发包给具有相应资质的幕墙专业工程施工单位",{"key":26,"text":27,"correct":18},"E","设计与施工过程的组成集成，有利于促进设计与施工的紧密结合，以达到项目建设增值的目的。","BDE","该项目并不是使用的施工平行发包模式。",{"id":6,"name":31,"category":32,"favorite":33},"(初级)建筑与房地产经济","经济金融",0]