[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-52001":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},52001,53,2,"多选题","下列工作中，属于业主方设计阶段投资控制主要工作的有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","编写设计任务书中有关投资控制的内容",false,{"key":16,"text":17,"correct":18},"B","编制项目总投资分解规划，并在设计过程中控制其执行",true,{"key":20,"text":21,"correct":18},"C","审核项目总概算，在总概算内进行设计深化",{"key":23,"text":24,"correct":18},"D","采用价值工程方法，在充分满足项目功能的条件下考虑进一步挖掘节约投资的潜力",{"key":26,"text":27,"correct":14},"E","审核各类工程付款和材料设备采购款的支付申请","BCD","A选项属于设计前准备阶段投资控制的主要工作。E选项属于施工阶段业主方投资控制的主要工作。",{"id":6,"name":31,"category":32,"favorite":33},"(初级)建筑与房地产经济","经济金融",0]