[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51958":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},51958,53,2,"多选题","按照建筑产品施工完成的程度，可将建筑产品分为（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","开工工程",false,{"key":16,"text":17,"correct":18},"B","未完施工",true,{"key":20,"text":21,"correct":18},"C","已完施工",{"key":23,"text":24,"correct":18},"D","已完工程",{"key":26,"text":27,"correct":14},"E","甩尾工程","BCD","根据建筑产品按照建筑产品施工完成的程度，可将建筑产品分为已完工程、已完施工和未完施工。",{"id":6,"name":31,"category":32,"favorite":33},"(初级)建筑与房地产经济","经济金融",0]